Military Engineer Services Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Military Engineer Services - MES Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date9 Dec 2024
Closing Soon31 Dec 2024
Tender Amount₹ 36,96,100
Costs
EMD
₹ 73,922Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_687755_1Tender No
8100/B/841/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
vi) Cost of minor parts such as nuts, bolts,screws, clamps, T&Ps, oiling, greasing, cleaner liquid for steam pipes,GI/SS fittings, V-belts etc, deemed to be included in the quoted rates,Belts of drying ironer,clothes/cover of flat bed press ,rubber hose pipe,V Belts any size and type,main door rubber gasket for washer extractor 30/60kg.,Stainless steel Door lock of washer extractor 30/60Kg. ,servicing and programming setting /resetting of the display card of Laundry Machines,replacement of an type of contactor,display meter,push buttons,deemed to be included in the quoted rates
-
-
-
... More
vii) Hydraulic Shocker, Operating computer ST06, Steam solenoid Valve , Fuse link 4 Amps, Electric buzzer, Door limit switch, motors rewinding , Main bearing set, Water solenoid valve, Drain valve, PU pipe for level , 3 Way water solenoid valve, Motor plate welding, deemed to be included in the quoted rates
-
-
-
... More
viii) Steam radiator, Single phase preventor,Digital temperature controller,Air hose pipe, Air flow control valve, Padding marina wool for bed press, Knobs ,Solenoid valve, Steam Trap Valve, Pressure Release Valve,power controlling card of VFD, main control command cable for Microsoft in between controller and relay power card ,display card ,deemed to be included in the quoted rates
-
-
-
... More
ix) Cost of replacing chocked Steam pipelines and steam trap Valves and welding and replacement of coupling, joints ,union etc if required to stop leakage of water and steam from the pipelines is ncluded.
-
-
-
... More
x) All minor spare parts required during AMC shall deemed to be included in the quted rate.
-
-
-
... More
xi) The cost of transportation if any required is deemed to be included in the quoted rate.
-
-
-
... More
xii) Contractor must have to ensure the MES & MH rep for the machine functional in all aspects
-
-
-
... More
Opening dismantling and disconnecting all water connection and electrical connection of Drying tumbler capacity of 30 Kg make- STEFAB and reassemble the same for repair after removing nuts and bolts and replacement of counter bearings of suitable size with bush & sleeves for drying tumbler 60kg. including Oiling, cleaning, servicing and greasing, balancing and alignment of cylindrical basket, balancing of blower, shaft turning, descaling and servicing of steam radiator for the smooth functioning of the machine complete all as directed.
2
-
-
... More
Opening dismantling and disconnecting all water connection and electrical connection of Drying tumbler capacity of 60 Kg make- STEFAB and reassemble the same for repair after removing nuts and bolts and replacement of counter bearings of suitable size with bush & sleeves for drying tumbler 60kg. including Oiling, cleaning, servicing and greasing, balancing and alignment of cylindrical basket, balancing of blower, shaft turning, descaling and servicing of steam radiator for the smooth functioning of the machine complete all as directed.
1
-
-
... More
Opening dismantling and disconnection all water connection, steam connection and electrical conection of washer extractor 30Kg /60Kg make Stefab and taking out the complete machine from the foundation for the repair by removing out the old/broken foundation and grounting and providing new foundation with bolts & PCC mortar complete with all neccessary items and reassamble the same machine after completion of foundation work for the smooth functioning of the machine complete all as specified and directed.
1
-
-
... More
M&L for repair of ducting of Drying Tumbler of Laundry Plant including replacement of unserviceable rusted GI sheet, rusted nut bolts and tightening of nut bolts,Cleaning of ducts , and making of Ducts complete serviceable by welding works if required and making of Ducts as per existing size complete all as specified and directed.
1
-
-
... More
M&L for earthing complete with galvanised or steel earth plate electrode of size 60cm x60cmx6mm thick burried directly in ground vertically ( to a depth not less than 2.25mtr deep below normal ground level) with top edge of the plate not less than 1.5 mtr below normal ground level, connected to strip 32x 6 mm size with nuts, bolts , check nuts , washers, earth plate surrounded by packed layers of charcoal dust and common salt 15cm thick all around, top & bottom watering pipe 20mm bore of GI medium grade with funnel and wiremesh all as shown in electrical plate No.3 of SSR -2010 Part I and connecting to earthing test point,main switch board and testing on completion including PCC chamber, concrete 1:3:6 type C-2 and RCC cover 75mm thick with MS TMT bar 8mm dia @ 150mm c/c both ways in cement concrete(1:2:4) type B-1 all asshown in electrical plate in No 35 of SSR(Pt-I) 2010 including excavation work and testing of earthing result after complition of earthing. complete all as specified and dirfected
2
-
-
... More
M&L for repair of Flat work Drying ironer heated chest type Model FS 21 of Laundry Plant by opening dismantling steam connection , air connection and electrical connection for repair to chest alignment, Roller alignment , Chest turning work , polishing and replacement of following spare parts: (a) Steel wool padding (b) Outer cloth cover for roller (c) Emery Paper sheet for duffel roller (d) Canvas conveyer Belts of existingsizes - 16 Nos (e) Blower bush (f) Cylinder kit set
Make: Stefab/Fabtech Engineering/NAT Steel Equipment
1
-
-
... More
M&L opening dismantling and disconnecting of steam radiator for Drying tumbler capacity of 60 Kg make- STEFAB and reassemble the same after replacing steam radiator for the smooth functioning of the machine complete all as directed.
1
-
-
... More
M&L opening dismantling and disconnecting of us drain valve of water exactor capacity of 60/30 Kg make- STEFAB and reassemble the same after replacing same for the smooth functioning of the machine complete all as directed.
2
-
-
... More
M&L opening dismantling and disconnecting of us pneumatic cylinder for flat work drying ironer heated chest type model FS 21 of make- STEFAB and reassemble the same after replacing same for the smooth functioning of the machine complete all as directed.
4
-
-
... More
M&L opening dismantling and disconnecting of us VFD for flat work drying ironer heated chest type model FS 21 of make- STEFAB and reassemble the same after replacing same for the smooth functioning of the machine complete all as directed.
1
-
-
... More
B. Steam Boiler
Comprehensive maintenance of Steam Boiler quantity - One Nos of Capacity 600 Kg/Hr Make Thermax, Model Revomax RXA-06 for 11 months by the service technician of OEM Thermax/Delta Therm or approved by Engineer In-charge/GE .
11
-
-
... More
a). The Comprehensive maintenance Service package covers the following:
-
-
-
... More
b). Site visit for preventive maint and check up of Steam boiler will be carried out by service technician of or as recommended by the Engineer In-charge every month during the contract period. In the visit, technician will check and inspect of both steam boiler plant system complete of capacity 600Kg/Hr Make-Thermax
-
-
-
... More
c). Contractor must submit the service reports every month from the Service Engineers along with the details of the Repair/maint/replacement of spares/testing of Steam Boilers carried out during Every month during the contract period. On Failure of visit by OEM/Approved firm representative or non submission of report by him, a panel recovery of Rs 1000/- per visit shall be made from the contractor dues.
-
-
-
... More
d). Cleaning of chocked coil by descaling steam boiler -01 Nos, if required engineer shall be supervising the descaling activity with Descaling Chemical (i.e. Chemical recommended by service Engineer)
-
-
-
... More
e). Servicing/repair of all water pumps including replacement of unserviceable seals and glands , and servicing ,greasing /alignment of shaft/testing complete of all motors of both Steam Boilers.
-
-
-
... More
f). Servicing/repair/testing of electric control panel and replacement of unserviceable minor spares like meter , wiring etc complete of both Steam Boilers.
-
-
-
... More
g). Contractor must have to ensure the MES & MH rep for the machine functional in all aspects
-
-
-
... More
h) Base operation checks to bring the equipment in optimum condition
-
-
-
... More
j) Scheduled check up visits for general health check up
-
-
-
... More
k) Preventive and predictive maintenance guidance during these visits
-
-
-
... More
l) Performance optimization
-
-
-
... More
m) Break down service support
-
-
-
... More
n) Recommendations for improved performance
-
-
-
... More
o) Service History Mapping
-
-
-
... More
q) Safety Checks
-
-
-
... More
r). The contractor must ensure the following once the contract period strated:
-
-
-
... More
s) An optimum performance level of Boilers is maintained
-
-
-
... More
t) A consistent service level is delivered
-
-
-
... More
u) Operating parameters to be monitored
-
-
-
... More
v) The above services will result in equipment uptime to be increased
-
-
-
... More
w) Input parameters of the system to be monitored as well as compared
-
-
-
... More
supply ,fix ,installation and testing in replacement of following accessories/control valves & equipment of steam pipeline system/network of Steam Boiler. Specials required will be measured and paid separately under relevant items : Note: The work has to be executed by OEM of Boiler THERMAX limited/Delta Therm or approved firm in Boiler repair/manufactures
-
-
-
... More
Supply & fixing in replacement of Optimiser complete all as specified and directed. Make-Thermax/ ION Exchange/Delta therm
1
-
-
... More
Supply ,installation commissioning & testing in replacement of Steam Coil of Boiler Capacity 600 KG/Hr complete all as specified and directed.
1
-
-
... More
Supply & fixing in replacement of Duct Economiser complete all as specified and directed.
1
-
-
... More
Supply & fixing in replacement of Inner Jacket of steam Boiler 600 Kg/Hr complete all as specified and directed.
1
-
-
... More
Supply & fixing in replacement of SS Inner casing for steam Coil of steam Boiler 600 Kg/Hr complete all as specified and directed.
1
-
-
... More
Supply & fixing in replacement of Temperature Controller 0-400 Deg C complete all as specified and directed.
1
-
-
... More
Supply & fixing in replacement of RTD Assembly PT-100/ 5 Mtr complete all as specified and directed.
1
-
-
... More
Supply & fixing in replacement of Sequence Controller MA810 complete all as specified and directed.
2
-
-
... More
Supply & fixing in replacement of Photoresistor 8205 complete all as specified and directed.
2
-
-
... More
Supply & fixing in replacement of Fuel pump AJ6AE
1
-
-
... More
M & L for Overhauling kit for boilers i.e refactory material, gland rope, hold tight, tape, ceramic for the smooth functiong of the machine complete all as directed.
1
-
-
... More
Supply & fixing in replacement of Water pump-Triplex with motor & base frame and pulley set complete all as specified and directed.
1
-
-
... More
Taking out insulation of glass wool and aluminium sheet and rusted & leakage steam pipe line of MS of 50 mm dia B class including flanges and replacement of MS pipe line of 50 mm dia B class with flanges including refixing of insulation of glass wool and aluminium sheet as directed by Eng-in-Charge.
15
-
-
... More
All as above item No 13.13 here in before but for 40 mm dia
15
-
-
... More
All as above item No 13.13 here in before but for 25 mm dia
30
-
-
... More
All as above item No 13.13 here in before but for 20 mm dia
20
-
-
... More
Supply ,fix ,installation and testing in replacement of following accessories/control valves & equipment of steam pipeline system/network with jointing material of Steam Boiler.
-
-
-
... More
Pipe line MS (C-class) 80mm including flange,bend,Nipple,Socket,Elbow,Tee etc
25
-
-
... More
Pipe line MS (C-class) 50mm including flange,bend,Nipple,Socket,Elbow,Tee etc
15
-
-
... More
Pipe line MS (C-class) 40mm including flange,bend,Nipple,Socket,Elbow,Tee etc
15
-
-
... More
Pipe line MS (C-class) 25mm including flange,bend,Nipple,Socket,Elbow,Tee etc
30
-
-
... More
Pipe line MS (C-class) 20mm including flange,bend,Nipple,Socket,Elbow,Tee etc
20
-
-
... More
Ball Valve 50 mm Brass
2
-
-
... More
Hexa Nipple pressure 25mm
2
-
-
... More
Hexa Nipple pressure 15mm
6
-
-
... More
Safety valve with handle 25mm
2
-
-
... More
NRV 40mm Brass
1
-
-
... More
Header 4'x8"
1
-
-
... More
Y Stainer 50mm
2
-
-
... More
Y Stainer 20mm
2
-
-
... More
Y Stainer 15mm
1
-
-
... More
T.D Trap 25mm
1
-
-
... More
T.D Trap 15mm
1
-
-
... More
Botal Trap 20mm
1
-
-
... More
Globe valve 80mm
1
-
-
... More
Globe valve 50mm
1
-
-
... More
Socket for saifan
3
-
-
... More
Insulation for pipe line with glass wool and wrapping with aluminum sheet complete
15
-
-
... More
Resin T-40 Na packing in plasting sealed drum
100
-
-
... More
Crystal salt as per sample for water softner plant in solid form and packed in plastic bag
3000
-
-
... More
Maxclean for descaling to Coil type Boilers of Cap. 600Kg/hr in liquied form packed in plastic sealed drum
175
-
-
... More
PH Booster for the water softner plant in liquied form packed in plastic sealed drum
100
-
-
... More
Supply and fix in replacement of rotational moulded HDPE Makeup water storage tank three layered (cylindrical) vertical with close top hoisted and fixed in position of capacity 1000 Ltr. Including providing water connection from water storage tank to Existing Pipeline of softerning Plant and installation on roof top on existing platform including Float valves and incoming and outgoing Gate valves of existing size of Incinerator Plant of MH all as specified and directed.
1
-
-
... More
M&L for sub main wiring with 4 single core 10 Sqmm (FRLS) copper conductor PVC unsheathed cable medium grade including PVC conduit (appropriate size) concealed in wall for sub main connection including 10 Sqmm (FRLS) PVC insulated multistranded unsheathed copper conductor used as a earth wire to common earth and connection to earth dolly all as specified. ( Note :- four runs of 10 sqmm (FRLS) and two run of 10 sqmm (FRLS) copper conductor and PVC conduit shall be measured as one unit length.)
165
-
-
... More
M&L for dismantling framed steel wrok of any description as in tank stand work,supporting structure for tanks etc at heights up to 10 Mtr separating scrapping of serviceable steel sections for reuse complete all as directed
2.2
-
-
... More
M&L for framed work such as grills ,gratings etc,with ends of bars shouldeed and /or riveted. Or forged into spikes, framed guard bars,barred iron doors,ladders, framed balusters, walkways, railings framework of water tanks and similar work conformingto FE 290.grade E 165 all as specified and as directed including painting with two coats of synthetic enamel paint /lead free black bituminous paint as directed over a coat of zinc chrome primer.
125
-
-
... More
All as per item No 14.29 here in before but except steel sections ( Note: serviceable steel sections obtained from Sl No 14.29 shall be used for this item)
20
-
-
... More
Note:- (a) The time limit for attending the job/complaints with in 48 hours. (b) In case the contracts fails to attend/rectify the defects within the above time limit, penalty will the imposed as under:- (a) Rs. 1000/- per day for 1st two days and after that Rs. 2000/- per day.
(c) In case of non-functioning of Laundry machines,Boilers a penalty shall be imposed against the contractor and a penal recovery of Rs 500/- per day for minor repair and Rs 1000/- for major repairs shall be recovered from the contractor's dues.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%