Military Engineer Services Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Military Engineer Services - MES Tender

Works
Paints and Enamels
Eprocure
Opening Date24 Oct 2024
Closing Soon19 Nov 2024
Tender Amount₹ 2,50,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
NOTES: (i) The work shall be carried out through authorized & qualified applicator (ii) Total paint should be removed and the Debris / Water to be vacuumed simultaneously leaving No FOD so that the Runway is available for operation immediately. (iii) The Machine make to be deployed for Runway painting Removal should have E-In-C approval eg SH8000, SH5000, Sk3000. (iv) Paint removal Debris should be in solid form when finally disposed. (v) In any emergency condition the machine should exit from the runway in less than 2 mins without leaving FOD. (vi) Friction Test should be carried out before & after paint removal operation. (viii) After carrying out paint removal operation on the runway, the friction reading of the paint removed segment should be minimum 0.55 µ.

-

-

-

... More
M&L for Preparing of old/new black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned surfaces with using air blowers to remove all loose dirt etc complete and applying cold Polymer Modified Emulsion (PME) by spraying with machine of total cold liquid PME 0.89 lit per Sqm (undiluted) for two coats with mineral filler as recommended by manufacturer of PME (after diluting with water), each coat diluted in the ratio 1:1 (PME :WATER) and ensure uniform finish of PME on runway complete all as per manufacturer’s instructions and all as specified and as directed.

51900

-

-

... More
Notes-(A): The tenderer shall take into consideration for the following points while quoting his rate for this item :- (a) Due care shall be taken for friction parameters during application of PME as per ICAO Standard. (b) The work shall be carried out through authorized and qualified applicators of the manufacturer only. (c) Care shall be taken to fill gaps/cracks up to 3mm size with mineral filler as per manufacturer’s instructions. (d) A performance guarantee certificate for two years shall be submitted by the contractor to the GE on completion of work as specified. (e) Application of PME shall be done by flooding and wiping in both first coat and second coat with the help of wiper or as directed by the manufacturer. (f) Application of PME shall be done under the supervision of manufacturer's technical experts. NOTE-(B) : Conducting of following tests over Flexible portion of Runway surfaces before and after application of PME by Govt approved lab / by the technical experts of PME manufacturer as directed by GE : (c) Skid resistance (Dry and Wet condition) in every 5000 sqm area NOTE- (C): PME required more/less than 0.89 lit/sqm (undiluted) during execution of works shall be adjusted in supply only rate.

-

-

-

... More
Supply only Polymer Modified Emulsion (PME)

2

-

-

... More
M&L for Preparation of previously untreated surface exc. 10 cm width or girth of pavement/road surface and Paint Marking for Runway & Taxiway On New Surface with Acrylic Water based Road Marking Paint of approved brand to give a even shade on bitumen and concrete . Two or more quotes on a new work over and under coat of suitable Shade ( Airfield Marking by Road paint with IS: 164 of approved class white or golden yellow or any tint water based exc. 10 cm width complete complete all as specified and directed. (Note: Painting shall be done by runway painting machine)

4700

-

-

... More
M&L for Preparation of previously untreated surface n. exc. 10 cm width or girth of pavement/road surface and Paint Marking for Runway & Taxiway On New Surface with Acrylic Water based Road Marking Paint of approved brand to give a even shade on bitumen and concrete . Two or more quotes on a new work over and under coat of suitable Shade ( Airfield Marking by Road paint with IS: 164 of approved class white or golden yellow or any tint water based exc. 10 cm width complete complete all as specified and directed. (Note: Painting shall be done by runway painting machine)

110

-

-

... More
M&L for preparation of old painted surface exc 10 cm width or girth of concrete pavement/road surface and paint marking for Runway & Taxiway on old surface with acrylic water based road marking paint of approved brand to give a even shade on bitumen and concrete. two or more coats on old work over and under coat of suitable Shade ( Airfield Marking by Road paint with IS: 164 of approved class white or golden yellow or any tint water based, complete all as specified & directed. (Note: Painting shall be done by runway painting machine)

3765

-

-

... More
M&L for Preparation of old painted surface n. exc. 10 cm width or girth of pavement/road surface and Paint Marking for Runway & Taxiway On New Surface with Acrylic Water based Road Marking Paint of approved brand to give a even shade on bitumen and concrete , two or more quotes on a new work over and under coat of suitable Shade (Airfield Marking by Road paint with IS: 164 of approved class white or golden yellow or any tint water based exc. 10 cm width complete complete all as specified and directed. (Note: Painting shall be done by runway painting machine)

85

-

-

... More
Excavation over areas n.exc.1.50 mtr deep and getting out, in soft/loose soil, complete all as specified & directed.

915

-

-

... More
Removing excavated soil to a distance exc 1.5 KM but n.exc. 5 KM and depositing where directed at a level nexc. 1.5 M above the starting point complete all as specified & directed. (Note:-Excavated material shall be removed from site after dumped & stacked as per direction of Engr-in-Charge before being taken away by contractor outside defence land)

915

-

-

... More
M&L coarse sand single sized (2.36 mm) may defined as 100% passing 4.7 mm sieve and 100% retained on 1.18 mm sieve, filling under floors such as SGAs, including leveling, watering, consolidation and it is ploughed with furrows all as specified and directed.

915

-

-

... More
Notes:- (i) Coarse sand brought by contractor for laying end of PTT shall be sieved before execution of work and laid appox 1 KM away from site as per direction of Engr-in-Charge before being taken away by contractor outside defence land. (ii) Sieved sand shall only be laid in SGA, unit rate shall be quoted accordingly

-

-

-

... More
NOTE FOR ALL ITEMS

-

-

-

... More
(I) All works to be executed inside technical area . The site for the work will be available in piece meal and also may be in non flying days. No claim for non availability of site in every working days will be entertained. Contractor shall quote his rates considering the above bottlenecks.

-

-

-

... More
(ii) Contractor has to execute the work after working hours, on sundays and holidays without any additional cost. The quoted rate of items deemed to be included and nothing extra will be admissible on this account

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.