Military Engineer Services Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Military Engineer Services - MES Tender

Works
Civil And Construction
Eprocure
Opening Date30 Oct 2024
Closing Soon4 Dec 2024
Tender Amount₹ 20,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(b) Sewage well No 2 sinking dia 10.75 Mtr and depth 7.30 mtr approx below ground level

2

-

-

... More
(c) Sewage well No 9 & 10 sinking dia 10.75 Mtr and depth 7.30 mtr approx below ground level

2

-

-

... More
(d) Sewage well No 4 & 5 sinking dia 6.70 Mtr and depth 7.30 mtr approx below ground level

2

-

-

... More
(e) Sewage well No 6 & 7 sinking dia 6.00 Mtr and depth 6.50 mtr approx below ground level

2

-

-

... More
Labour for dismantling, disconnecting the Air Blower including from channel frame and electrical panel for repair of Gear Box, refitting of gear box after toping up oiling, greasing, alignment of pump set and re-fixing/ assembling testing to make it functional complete including cleaning of all dirt, dust and including transportation to civil workshop for repair work and back to working site etc. complete all as specified and directed. Note:- Worn out spares shall be replaced with existing make and measured and paid separately as under:-

2

-

-

... More
(a) Supply of Pulley V Belt SPB-1800

2

-

-

... More
(b) Supply of Suction air filter

2

-

-

... More
(c) Supply of Bearing set

2

-

-

... More
(d)Supply of Oil seal set

2

-

-

... More
(e ) Supply of Piston bush

2

-

-

... More
(f) Supply of Gear set

1

-

-

... More
(g) Supply of Rotor Set

1

-

-

... More
(h) Supply of Pulley bush

2

-

-

... More
(i) Supply of Check nut

2

-

-

... More
Labour for disconnecting electric connections from LT control panel and starter of non clogging submersible pump set of any size 7.5 HP to 10 HP and removing the pipe line connections from discharge side and taking out sub pump set alongwith, column pipe from Sewage sump with the help of chainpully including transportation to workshop for repair including replacement of rusted nuts bolts. rubber gasket complete and re-assembling at work site complete all as specified and as directed. Note:- Worn out spares shall be replaced with existing make and measured and paid separately as under:-

2

-

-

... More
(a) Supply of Rewinding of submersible motor.

2

-

-

... More
(b) Supply of Pump Impeller

2

-

-

... More
(c ) Supply of Mechanical seal set upper and lower

2

-

-

... More
(d) Supply of Bearing

2

-

-

... More
(e ) Supply of Fixing compounding

2

-

-

... More
(f) Supply of O ring set

2

-

-

... More
Labour for disconnecting electric connections from LT control panel and starter of non clogging submersible pump set of any size 12 HP to 20 HP and removing the pipe line connections from discharge side and taking out sub pump set alongwith, column pipe from Sewage sump with the help of chainpully including transportation to workshop for repair including replacement of rusted nuts bolts. rubber gasket complete and re-assembling at work site complete all as specified and as directed. Note:- Worn out spares shall be replaced with existing make and measured and paid separately as under:-

2

-

-

... More
(a) Supply of Rewinding of submersible motor.

2

-

-

... More
(b) Supply of Pump Impeller

2

-

-

... More
(c ) Supply of Mechanical seal set upper and lower

2

-

-

... More
(d) Supply of Bearing

2

-

-

... More
(e ) Supply of Fixing compounding

2

-

-

... More
(f) Supply of O ring set

2

-

-

... More
Labour for dismantling, disconnecting the centrifugal pump set of capacity 7.5 HP from foundation and fixing after repairing rewinding and assembling the pump set including insulating material of any size ,testing complete all as specified and directed including transportation to workshop and back after repair complete all as specified and as directed. Note:- Worn out spares shall be replaced with existing make and measured and paid separately as under:-

2

-

-

... More
(a) Supply of Impeller CI

2

-

-

... More
(b) Supply of Mechanical seal for pump shaft AISI-410

2

-

-

... More
(c ) Supply of Bush sleeve (Gun metal)

2

-

-

... More
(d) Supply of Connection plate

2

-

-

... More
(e ) Supply of Bearing

2

-

-

... More
Supply and pouring Compressor Oil in air blower at STPs complete all as specified and directed.

40

-

-

... More
Supply and pouring MBBR/FAB media model PP22 effective specific surface area 400 Sqm/Cum to 600 Sqm/cum of height 12mm and dia of 27mm made up of virgin media complete all as directed. Note :- MBBR media will be certified by OEM and the colour of the media must be white in colour.

9

-

-

... More
M & L for strip opening of 3 phase, 415 volts, AC, 50 Hz of capacity 2 HP Induction Motor ,taking out burnt winding coil complete and rewinding with super enameled copper winding wire as of existing size/ gauge including providing insulating material, varnishing and replacement of worn out parts like bearing , bushing, sleeves etc and re-assembling/refixing the motor as per the initial arrangement including making all connections complete all as specified and directed. Note:- Transportation to civil work shop and back to site deemed to be included in quoted rates.

2

-

-

... More
M & L for strip opening of 3 phase, 415 volts, AC, 50 Hz of capacity 3 HP Induction Motor ,taking out burnt winding coil complete and rewinding with super enameled copper winding wire as of existing size/ gauge including providing insulating material, varnishing and replacement of worn out parts like bearing , bushing, sleeves etc and reassembling/refixing the motor as per the initial arrangement including making all connections complete all as specified and directed. Note:- Transportation to civil work shop and back to site deemed tube included in quoted rates.

2

-

-

... More
M & L for strip opening of 3 phase, 415 volts, AC, 50 Hz of capacity 7.5 HP Induction Motor ,taking out burnt winding coil complete and rewinding with super enameled copper winding wire as of existing size/ gauge including providing insulating material, varnishing and replacement of worn out parts like bearing , bushing, sleeves etc and re-assembling/refixing the motor as per the initial arrangement including making all connections complete all as specified and directed. Note:- Transportation to civil work shop and back to site deemed to be included in quoted rates.

2

-

-

... More
M & L for strip opening of 3 phase, 415 volts, AC, 50 Hz of capacity 20 HP Induction Motor ,taking out burnt winding coil complete and rewinding with super enameled copper winding wire as of existing size/ gauge including providing insulating material, varnishing and replacement of worn out parts like bearing , bushing, sleeves etc and reassembling/refixing the motor as per the initial arrangement including making all connections complete all as specified and directed. Note:- Transportation to civil work shop and back to site deemed to be included in quoted rates.

1

-

-

... More
M & L for dismantling, disconnecting the screw pump set of capacity 2.25 HP from foundation after disconnecting all connections for repairing/ greasing including replacement of worn out minor parts and re-fixing after making serviceable to the entire satisfaction complete all as specified and directed. Note:- Transportation to civil work shop and back to site deemed to be included in quoted rates.

2

-

-

... More
S & F in replacement of existing unserviceable SG Iron butterfly valve of pressure handling capacity 13-20 kg/cm2 suitable for 100 mm CI tubing complete all as specified and directed.

6

-

-

... More
S & F in replacement of existing unserviceable SG Iron butterfly valve of pressure handling capacity 13-20 kg/cm2 suitable for 65 mm CI tubing complete all as specified and directed.

4

-

-

... More
S&F in replacement of Cast iron 100 mm bore sluice valve class PN-1.6 Heavy duty both side flanged conforming to IS-14846 : 2000 ISI marked with stainless steel spindle and iron wheel head complete with rubber gasket packing, nuts, bolts and washers as required at site complete all as specified and directed.

1

-

-

... More
S&F in replacement of dosing pump diaphragm type having discharge capacity of 6-10 lph and having pressure handling capacity of 10 kgf/cm2 complete all as specified and directed. Make :- Ramco/Delicacy/Oasis

1

-

-

... More
S&F in replacement of MS flanged column pipe heavy duty complete with all jointing material of size 100 mm dia bore pipe shall be as required at site complete all as specified and directed.

40

-

-

... More
S&F in replacement of MS flanged column pipe heavy duty complete with all jointing material of size 50 mm dia bore pipe shall be as required at site complete all as specified and directed.

60

-

-

... More
S&F in replacement of MS flanged column pipe heavy duty complete with all jointing material of size 65 mm dia bore pipe shall be as required at site complete all as specified and directed.

30

-

-

... More
S&F in replacement of MS flanged column pipe heavy duty complete with all jointing material of size 150 mm dia bore pipe shall be as required at site complete all as specified and directed.

20

-

-

... More
Supply and fixing in replacement of steel water tubing of size 80mm bore, galvanized medium grade including all complete fitting such as bends, elbows, tees unions, sockets etc laid complete in above ground all as specified complete all as specified and directed.

40

-

-

... More
S&F in replacement of motor protection circuit breaker of 3 poles having current carrying capacity of 6-10 amps complete all as specified and directed.

1

-

-

... More
S&F in replacement of motor protection circuit breaker of 3 poles having current carrying capacity of 22-32 amps complete all as specified and directed.

1

-

-

... More
Supply, installing, commissioning and testing including taking out existing submersible non clog sewage pump set and motor 11 Kw all as per IS-325, suitable for working with 3 phase, 415 Volts, 50 Hz AC electric supply having solid handand capacity upto 100 mm, discharge 900 LPM at 18 mtr head incl suitable size wire/ steel rope for hanging arrangement complete all as specified and directed. Make- Kirloskar/ KSB/CG Note :- BER/Unserviceable non Clog submersible pump set shall be submitted to MES store yard.

1

-

-

... More
Supply and fixing in replacement of XLPE insulated, armoured heavy duty electric cables with aluminium conductor, 11000 volts grade, cross sectional area 10 sqmm,2 core. complete all as specified and directed.

100

-

-

... More
Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth for foundation etc or for laying for pipes etc n.exc 10 Sqm on plan and not exceeding1.5 m in depth and getting out in any type of soil complete all as specified and directed.

18

-

-

... More
Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in any type of soil complete all as specified and directed.

17.5

-

-

... More
Removing surplus excavated material (soil) to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed.

0.5

-

-

... More
Supply and laying corrugated HDPE pipe of 40 mm dia for cable protection confirming IS 14930 1 & 2, laid in trenches or fixing to the pole with necessary accessories complete all as directed.

90

-

-

... More
Supply & Mixing of poly aluminium chloride complete all as specified and directed. Note- (i) Contractor must bring the test certificate for the purity of the chemicals. (ii) Quantity of mixing of chemical will be directed by Engr-in-Charge and consumption of chemical maintained daily and countersigned by GE fortnightely.

450

-

-

... More
Supply & Mixing of Sodium Hypo Chloride having 10% Chlorine content complete all as specified and directed. Notes :- (a) The contractor shall furnish the original Test Certificate of conformity of the chemicals from the manufacturer indicating MES order / CA No. and other relevant details at the time of acceptance of product by GE. (b) The chemicals shall be tested out for their genuinely within 07 days of receipt of consignment at site from NABL approved lab and report to be submitted to the Engineer-in-charge. (c) Cost of testing and transportation shall be deemed to be included in unit rate of supply. The chemicals shall be used only after their confirmation to the standards. (d) Quantity of Mixing of Chemical will be directed by Engr-in-Charge and consumption of Chemical maintained daily and countersigned by GE fortnightely.

8000

-

-

... More
Material and labour for cleaning of MBBR -02 Nos tank, filter feed tank, chlorine contract tank thoroughly by removing mud, grits etc from 900 KLD STP complete all as specified and as directed. Notes :- (a) Cleaning inner surface of tank completely by scraping with steel wire brush and removing mud and sludge collected inside the tank manually at a distance not exceeding 50 mtr all as directed. (b) Washing with clean water and bleaching powder complete tank internally and removal of left out sludge, if any at site at a distance not exceeding 50 mtr all as directed.

2

-

-

... More
Material in replacement of frame work such as grills, gratings etc winth ends of bars shouldered and /or hveted or forged into spikes framed guard bars, barred iron door; ladders, framed balusters, walk ways railings framed works or water tank in STP and similar work confirming to Fe 29 Gde E-165 including painting with synthetic enamel paint complete all as specified and directed.

800

-

-

... More
Supply & fixing in replacement of existing unserviceable submersible cable of 10 sqmm 4 core submersible cable in the non clog submersible pump complete all as specified and directed.

35

-

-

... More
M & L in repair and maintenance of centrifuge decanter of 3 HP capacity, cleaning of centrifuge bed, changing of minor parts, bearing, belt etc to make it fully functional for ejection of sludge cake from it complete all as specified and directed.

1

-

-

... More
Taking out/ down old unserviceable hume pipe size ( 100 to 200 mm) complete all as specified and directed.

50

-

-

... More
Supply, laying and testing Ductile Iron (DI) pipe 200 mm dia, spigot and socket joints, class K7 conforming to IS-8329-2000 with tyton/ rubber joint conforming to IS-5382, jointed and laid in trenches and connected complete all as specified and directed.

50

-

-

... More
Taking out existing CI/DI pipe of 200 mm dia from trenches for repair of leakages from joints and removing stagnated material from pipe, cleaning it properly and relaying the same with new jointing material such as tyton joints/ lead joints or any other required material at site complete all as specified and directed. Note :- (i) Necessary excavation, Returning filling and removing shall be measured and paid separately under respective items of Sch. (ii) Repair / replacement work shall be carried out by contractor by taking minimum bear time to avoid back flow of sewage from wells or by making if required at sewage installations alternate arrangement of removing sewage material/ sludge from wells and deposited at from outside of AF Station or as directed.

50

-

-

... More
M & L for DI special fittings such as bends (any type, radius and angle), tapes and type, tee pieces single branch, 'Y' junction, double branch, cross (all socket or spigot and socket) collars, caps and plug for any bore spigot and socket end pipes complete all as specified and directed.

100

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.