Military Engineer Services Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Military Engineer Services - MES Tender
Paints and Enamels
Furnitures and Fixtures
Eprocure
Opening Date26 Jun 2024
Closing Date3 Sep 2024
Tender Amount₹ 30,00,000
Costs
EMD
₹ 60,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_662346_1Bid Award Id
ViewTender No
9185/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(d) Removing U/S keyboard tray of Table computer and S&F new key board tray complete all as specified and shown on drawing.
10
-
-
... More
(e) Removing old U/S drawer of Table computer and S&F new drawer of table of Table computer complete all as specified and shown on drawing.
10
-
-
... More
(f) Pull out old U/S mouse tray of Table computer and S&F new mouse tray of table computer complete all as specified and shown on drawing.
10
-
-
... More
(g) Removing of old U/S telescopic channel of key board and S & F new stainless steel telescopic channel to Table computer complete all as specified and shown on drawing.
20
-
-
... More
(h) S&F new fancy knobs to Table computer complete all as specified and shown on drawing.
10
-
-
... More
(j) S&F new handles to Table computer complete all as specified and shown on drawing.
10
-
-
... More
(k) S&F new Nylon buffers to Table computer complete all as specified and shown on drawing.
40
-
-
... More
(l) Welding work wherever required complete all as specified and shown on drawing.
20
-
-
... More
TEAPOY VARANDHA : FD-35(M), FD-208, FD-255, FD-383 S & F following components of Teapoy Verandah including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Replacement of old existing broken table top of any description with S&F new table top of 18/19 mm thick MDF board exterior grade (Grade I, Type-II) ISI marked duly post -formed with 0.6 mm thick laminate in colour/shade as approved by EIC/GE with 2 mm thick PVC Edging fixed on two sides with strong bonded chemical adhesive through hot pressed machine complete complete all as per drawing.
20
-
-
... More
(b) S & F new 25mmx3mm flat iron on top of legs of length 800mm welded to existing flat iron at top placed in position complete all as specified and shown on drawing.complete all as specified and shown on drawing.
5
-
-
... More
(c) Replacement of legs of table with S & F new legs. complete all as specified and shown on drawing.
6
-
-
... More
(d) S&F PVC hard rubber shoes of best quality for Tea poy verandha.complete all as specified and shown on drawing.complete all as specified and shown on drawing.
80
-
-
... More
(e) Welding work wherever required as directed by EIC and GE.complete all as specified and shown on drawing.
25
-
-
... More
BED PLY TOP STEEL : FD/E6/MAP/08 (R) S & F following components of bed including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) S & F new 12mm thick commercial BWR ply placed in position fitted with 30/35mm long nut bolts and washers complete all as specified and shown on drawing.complete all as specified and shown on drawing.
10
-
-
... More
(b) S & F new 18 mm thick MDF board exterior grade (Grade I, Type-II) ISI marked duly post -formed with 0.6 mm thick laminate in colour/shade as approved by EIC/GE placed in position for headrest duly fitted with screws complete all as specified and shown on drawing.
4
-
-
... More
(c) S & F new 18 mm thick MDF board exterior grade (Grade I, Type-II) ISI marked duly post -formed with 0.6 mm thick laminate in colour/shade as approved by EIC/GE placed in position for footrest duly fitted with screws complete all as specified and shown on drawing.
4
-
-
... More
(d) M&L High Quality rubber shoes with inside MS washer at bottom 40mm high of size 38mmx38mm complete all as specified and shown on drawing.
80
-
-
... More
(e) M&L Welding work wherever required as directed by EIC complete all as specified and shown on drawing.
10
-
-
... More
CHARPOY IP HARD TOP : FD/MAP-II/01 S & F following components of charpoy including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) S & F new 12mm thick commercial BWR Plywood of size 1916mm x 836mm fixed with nut and bolt (10 Nos). complete all as specified and shown on drawing.
20
-
-
... More
(b) Replacement of Long rails with S & F New Long rails of size 1980mm x 65mm x 25mm rectungular of 16 Gauge MS pipe complete all as specified and shown on drawing.
5
-
-
... More
(c) Replacement of short rails with S & F New short rails of size 900mm x 65mm x 25mm rectungular of 16 Gauge MS pipe complete all as specified and shown on drawing.
5
-
-
... More
(d) Replacement of leg with S & F New leg of size 440mm x 32mm x 32mm rectangular of 16 Gauge MS pipe complete all as specified and shown on drawing.
5
-
-
... More
(e) Replacement of Stiffner with S & F New Stiffner of size 836mm x 25mm x 25mm square of 16 Gauge MS pipe complete all as specified and shown on drawing.
5
-
-
... More
(f) Replacement of center Stiffner with S & F New center Stiffner of size 836mm x 25mm x 25mm square16 Gauge MS pipe complete all as specified and shown on drawing.
5
-
-
... More
(g) MS Clips for fixing of plywood size 60mm x 25mm x6mm thick and welded with frame of charpoy. complete all as specified and shown on drawing.
20
-
-
... More
(h) Welding work wherever required as directed by EIC complete all as specified and shown on drawing.
10
-
-
... More
STEEL TABLE OFFICERS/CLERK OF SORTS : FD-84(M), FD-381, FD-1002, FD-1003, FD-1004 S & F following components of table including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Replacement of old existing broken officers table top of any description with S&F new table top of 18/19 mm thick MDF board exterior grade (Grade I, Type-II) ISI marked duly post -formed with 0.6 mm thick laminate in colour/shade as approved by EIC/GE with 2 mm thick PVC edging fixed on two sides with strong bonded chemical adhesive through hot pressed machine coplete all as per drawing 4 mm thick teakwood beading.
5
-
-
... More
(b) All as per item 30 here in but top of table clerk complete all as specified and shown on drawing.
5
-
-
... More
(c) Replacement of drawer with S&F new table drawer made to shape, fixed in position all as shown on drg, specified and directed with Locking arrangement i.e. Key holes etc complete all as specified and shown on drawing.
40
-
-
... More
(d) Dismantling, taking out carefully old existing broken U/S Locks with key cover of any description & replacement of the same with S&F new Locks with double key fix with suitable 4mm dia screws complete machine complete all as specified and shown on drawing.
60
-
-
... More
(e) Leg (New leg must be made of 25mm MS square pipe,16 gauge acomplete all as specified and shown on drawing.
15
-
-
... More
(f) Stiffener (New stiffener must be made of 25mm MS square pipe,16 gauge complete all as specified and shown on drawing.
15
-
-
... More
(g) Replacement of standard PVC Handle with S&F new PVC handle complete all as specified and shown on drawing.
30
-
-
... More
(h) Welding work wherever required as directed by EIC complete all as specified and shown on drawing.
50
-
-
... More
(j) Replacement of rubber shoe with S&F new hard rubber shoe of superior quality complete all as specified and shown on drawing.
40
-
-
... More
STEEL LOCKER OF SORTS : FD-127(M), FD-257, FD-1029, CWE/ BPL/53 .S & F following components of locker including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Replacement of Handle with S&F new Chromium plated handle complete with nuts and pins
60
-
-
... More
(b) Replacement of legs with S&F new legs complete complete all as specified and shown on drawing.
20
-
-
... More
(c) Replacement of shelf with S & F New shelf complete all as shown on drg, specified and directed .
20
-
-
... More
(d) Replacement with S&F new C.P. conduit pipe 20 mm dia for locker steel or sorts complete all as shown on drg, specified and directed .
60
-
-
... More
(e) Chromium plated safety type hasp & staples complete all as specified and shown on drawing.
50
-
-
... More
(f) Door Shutter (New shutters must be made of 1mm thick MS sheet, made to shape and size) complete all as specified and shown on drawing.
10
-
-
... More
(g) Replacement of hinges of steel locker with S&F new hinges complete all as specified and shown on drawing.complete all as specified and shown on drawing.
40
-
-
... More
(h) M&L Welding work wherever required as directed by EIC complete all as specified and shown on drawing.complete all as specified and shown on drawing.
200
-
-
... More
ALMIRAH STEEL LARGE 1/2 HANGING 1/2 SHELVING : FD-114(M), FD-1033, FD/E6/MAP/18 S & F following components of almirah including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Dismantling, taking out carefully old existing broken U/S Locks with key cover of any description & replacement of the same with S&F new Locks six levers, with double key including new key cover complete on external face of Almirah & suitable 4mm dia screws complete machine all as shown on drg specified and directed.
8
-
-
... More
(b) Replacement of three way locking device with S&F new three way locking device complete with fixing accessories for steel almirah large complete all as specified and shown on drawing.
2
-
-
... More
(c) Replacement of shelf of almirah with S&F new shelf made out of 1.00 mm thick MS sheet complete fitting with nut & washercomplete all as specified and shown on drawing.
4
-
-
... More
(d) Door Shutter (New shutters must be made of 1mm thick MS sheet, made to shape and size) complete all as specified and shown on drawing.
2
-
-
... More
(e) Replacement of Handle with S&F new Chromium plated handle complete with nuts and pins complete all as specified and shown on drawing.
10
-
-
... More
(f) Replacement of legs of steel almirah large with S&F new leg complete all as specified and shown on drawing.
8
-
-
... More
(g) Replacement of hinges of steel almirah large with S&F new hinges complete all as shown on drg, specified and directed.
6
-
-
... More
(h) Welding work wherever required complete all as specified and shown on drawing.
10
-
-
... More
(j) M&L CP Conduit pipe complete all as specified and shown on drawing.
8
-
-
... More
STEEL ALMIRAH LARGE : FD-67(M), FD-351, FD-1031 S & F following components of almirah including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Dismantling, taking out carefully old existing broken U/S Locks with key cover of any description & replacement of the same with S&F new Locks six levers, with double key including new key cover complete on external face of Almirah & suitable 4mm dia screws complete machine all as shown on drg specified and directed.Dismantling, taking out carefully old existing broken U/S Locks with key cover of any description & replacement of the same with S&F new Locks six levers, with double key including new key cover complete on external face of Almirah & suitable 4mm dia screws complete machine all as shown on drg specified and directed.
100
-
-
... More
(b) Replacement of Handle with S&F new Chromium plated handle complete with nuts and pins complete all as specified and shown on drawing.
70
-
-
... More
(c) Replacement of three way locking device with S&F new three way locking device complete with fixing accessories for steel almirah large complete all as specified and shown on drawing.
35
-
-
... More
(d) Replacement of legs of steel almirah large with S&F new legs complete all as shown on drg, specified and directed.
30
-
-
... More
(e) Replacement of shelf of steel almirah large with S&F new shelf complete all as shown on drg, specified and directed .
40
-
-
... More
(f) Door Shutter (New shutters must be made of 1mm thick MS sheet, made to shape and size) complete all as specified and shown on drawing.
2
-
-
... More
(g) Replacement of hinges of steel almirah large with S&F new hinges complete all as shown on drg, specified and directed.
10
-
-
... More
(h) Welding work wherever required complete all as specified and shown on drawing.
150
-
-
... More
STEEL ALMIRAH MED : FD-243 S & F following components of almirah including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Dismantling, taking out carefully old existing broken U/S Locks with key cover of any description & replacement of the same with S&F new Locks six levers, with double key including new key cover complete on external face of Almirah & suitable 4mm dia screws complete machine all as shown on drg specified and directed.
80
-
-
... More
(b) Replacement of Handle with S&F new Chromium plated handle complete with nuts and pins complete all as specified and shown on drawing.
50
-
-
... More
(c) Replacement of three way locking device with S&F new three way locking device complete with fixing accessories for steel almirah medium complete all as specified and shown on drawing..
40
-
-
... More
(d) Replacement of legs of steel almirah medium with S&F new legs complete all as shown on drg, specified and directed.
20
-
-
... More
(e) Replacement of shelf of steel almirah medium with S&F new shelf complete all as shown on drg, specified and directed .
40
-
-
... More
(f) Door Shutter (New shutters must be made of 1mm thick MS sheet, made to shape and size) complete all as specified and shown on drawing.
10
-
-
... More
(g) Cleats ( New cleats must be made of 2mm thick MS sheet) complete all as specified and shown on drawing.
30
-
-
... More
(h) Welding work wherever required as directed by EIC complete all as specified and shown on drawing.
150
-
-
... More
CHAIR WRITING MAP : FD/E6/MAP/12 /TP S & F following components of chair writing including dismantling taking out carefully & replace old components of chair writing. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Removing U/S damaged Seat & back of Chair writing. S & F new seat & back made of 12 mm thick hot pressed plywood upholstered with fabric and moulded polyurethane foam with PVC lipping all round. The polyurethane foam shall be 50 mm thick and shall be moulded with density 50-55 Kg per cubic mtr on Hampden machine.
30
-
-
... More
(b) Removing old U/S arm rest of chair writing officer and S&F new arm made of black integral skin polyurethane with 75-85 shore 'Á ' hardness & reinforced with MS insert all as specified and directed.
12
-
-
... More
(c) Taking out U/S /broken frame and S&F new frame as per drg duly painted omplete all as specified and shown on drawing.
10
-
-
... More
(d) Welding work wherever required omplete all as specified and shown on drawing.
70
-
-
... More
(e) Removing the old broken shoes of chairs and S & F best quality new PVC shoes to the legs of chair omplete all as specified and shown on drawing.
160
-
-
... More
CHAIR VERANDAH:- FD-19, FD-256, FD-359, FD/MAP-II/06 S & F following components of chair including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Removing the existing U/S cane/niwar plastic from the seat and back of chair and recanning the seat and back of chair with plastic cane 3.5mm to 4mm wide of 1st quality, white colour in pure godrej pattern. The canning of chairs shall only be carried out after complete painting process as specified in drg. MAKE OF CANE- SHAH, PREMIER
400
-
-
... More
(b) Removing the existing U/S/broken PVC seat and back from the chair verandah MAP(JCO/ORs), S & F new PVC seat and back 4mm thick to the chair verandah MAP (JCO/ORs) after providing flat iron 20mmx4mm support in centre of seat only by proper welding for support of PVC seat.The PVC seat shall got approved from GE before supply. MAKE OF PVC SEAT –AMKO/ COMFO/ HARMONY
100
-
-
... More
(c) Replacement of legs of chair with S&F new legs made out of 16 Gauge MS sheet complete all as shown on drg, specified and directed.
180
-
-
... More
(d) Welding work wherever required omplete all as specified and shown on drawing.
350
-
-
... More
(e) Removing the old broken shoes of chairs and S & F best quality new PVC shoes to the legs of chair Complete all as specified and shown on drawing.
1600
-
-
... More
TABLE COMPUTER : TP S & F following components of table computer including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Replacement of old existing broken table top of any description with S&F new table top of 18/19 mm thick MDF board exterior grade (Grade I, Type-II) ISI marked duly post -formed with 0.6 mm thick laminate in colour/shade as approved by EIC/GE with 2 mm thick PVC Edging fixed on two sides with strong bonded chemical adhesive through hot pressed machine complete all as per drawing.
15
-
-
... More
(b) Removing of U/S vertical board of both side of Table computer and S&F new verticle board of both side of table Complete all as specified and shown on drawing.
10
-
-
... More
(c) Removing U/S keyboard tray of Table computer and S&F new key board tray Complete all as specified and shown on drawing.
25
-
-
... More
(d) Removing old U/S drawer of Table computer and S&F new drawer of table of Table computer.Complete all as specified and shown on drawing.
25
-
-
... More
(e) Removing of old U/S telescopic channel of key board and S & F new stainless steel telescopic channel to Table computer complete all as specified and shown on drawing.
25
-
-
... More
(f) Removing old U/S twin wheel castors and S&F new wheel castors Complete all as specified and shown on drawing.
10
-
-
... More
CHAIR COMPUTER/ REVOLVING / EXECUTIVE CHAIR DRG NO FD/E6/MAP/01 AND TP OR SIMILAR PATTERN S & F following components Chair computer/revolving/executive HB/LB/MB including dismantling taking out carefully & replace old components of chair. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) S&F new seat made of 12 mm thick hot pressed plywood with fabiric/polyproplene/acrelic/fabric upholstery/leatherette as required (range of fabrics and letherette material not less than 350/RM) and moulded polyurethene foam 40 density with pvc lipping all around complete all as shown on drwing as required as directed by Engineer -in-charge
35
-
-
... More
(b) S&F new back seat made of 12 mm thick hot pressed plywood with fabiric/polyproplene/acrelic/fabric upholstery/leatherette as required (range of fabrics and letherette material not less than 350/RM) and moulded polyurethene foam 40 density with pvc lipping all around complete all as shown on drwing as required as directed by Engineer -in-charge
30
-
-
... More
(c) Pu arms/paded arms/Polyurethane arms as required complete all as per drg as directed by Engineer-in-Charge.
40
-
-
... More
(d) S&F new metal push back assy Complete all as specified and shown on drawing.
20
-
-
... More
(e) S&F new steel base with twin casters as required Complete all as specified and shown on drawing.
8
-
-
... More
(f) S&F Heavy duty nylon chair base with twin caster wheel Complete all as specified and shown on drawing.
20
-
-
... More
(g) S&F new chrome free cylinder tube including fixing Complete all as specified and shown on drawing.
35
-
-
... More
(h) S&F new twin heavy duty wheel castors of required dia complete all as directed by Engineer-in -charge
60
-
-
... More
CHARPOY GI PIPE FD-220 S & F following components of charpoy including dismantling taking out carefully & replace old components. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Ply wood top of 12 thick BWP Grade plywood as per existing shape and size with 10 Nos sunken nuts and bolts ,12 mm x 6 mm thcik 1 st class teak wood beading half round along with the edges of the plywood and rounded at corners,fixed with fevicol and headless nails including drilling holes of appropriate size with electiric dril machine complete as per drg and as directed.
470
-
-
... More
(b) S&F in replacement stiffner made of 25 mm mild steel suare tube 80 cm long not less than 16 guage in thickness each,welded to GI Charpoy pipe complete all as specified and directed.
150
-
-
... More
(c) S&F in replacement ,long rail made of 32mm dia medium grade GI pipe ISI Marked all as specified and shown on drg complete all as specified and directed.
75
-
-
... More
(d) Replacment of unserviceable short rail of charpoy GI Pipe fabricated from old pipe obtained in replacement of long rail from above items above including cutting threding etc as required and directed.
115
-
-
... More
(e) Replacement of unserviceable legs of charpoy GI pipe fabricated from old pipe obtained in replacement of short rail from SI items No _____ above including cutting threading etc as required wit bottom plug made of sal wood and flat iron clmap 02 Nos for MNF Set duly painted with two coats of black paint complet all as specified and directed
90
-
-
... More
(f) S&F in replacement GI 3 way elbow 32mm dia complete all as specified and directed
120
-
-
... More
(g) S&F in replacement of 32mm checknut complete all as specified and shown on drawing.
200
-
-
... More
Table dining steel 3x3 FD-1009 S & F following components of table including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Replacement of old existing broken table top of any description with S&F new table top of 18/19 mm thick MDF board exterior grade (Grade I, Type-II) ISI marked duly post -formed with 0.6 mm thick laminate in colour/shade as approved by EIC/GE with 2 mm thick PVC edging fixed on two sides with strong bonded chemical adhesive through hot pressed machine coplete all as per drawing.
20
-
-
... More
(b) Leg (New leg must be made of 25mm MS square pipe,16 gauge all as specified and shown on drg) complete all as specified and shown on drawing.
40
-
-
... More
(c) Welding work wherever required complete all as specified and shown on drawing.
10
-
-
... More
(d) Replacement of rubber shoe with S&F new hard rubber shoe of superior quality complete all as specified and shown on drawing.
140
-
-
... More
Chair school with hand board FD/E6/MAP/05, FD -261/TP and same pattern S & F following components of table including dismantling taking out carefully & replace old components of table. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Replacement of old existing ,broken one piece PVC Back & Seat and S&F new PVC back seat of superior quality Make -Neelkamal,supreme as per drg and approved by EIC/GE.
30
-
-
... More
(b) Replacement of old existing broken 18mm pre laminated particle board top openable with PVC edging and S&F new 18 mm pre laminated particle board top openable with PVC edging complete all as specified and shown on drawing.
30
-
-
... More
(c) Replacement of Old exising MS borken basket 5mm dia of chair school with hand board and S&F new MS basket 5 mm dia made to shape 7 Nos at equal distance complete all as specified and shown on drawing.
30
-
-
... More
(d) Welding work wherever required complete all as specified and shown on drawing.
70
-
-
... More
(e) Replacement of old existing borken PVC Shoe and S&F new PVC shoe shall be fixed complete all as specified and shown on drawing.
120
-
-
... More
CHAIR CB STEEL WITH ARMS FD-75 S & F following components Chair CB Steel including dismantling taking out carefully & replace old components of chair. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. (a) Removing unserviceable seat and S&F new seat of best quality of Ist class hard wood frame seat duly canned 2mm wide half round plastic cane and fixing of MS strip 12mmx2mmx485mm long at the bottom of seat complete all as specified and directed.
200
-
-
... More
(b) Removing unserviceable back and S&F new back of best quality of Ist class hard wood frame back duly canned 2mm wide half round plastic cane and fixing of MS strip 12mmx2mmx485 mm long complete all as specified and directed.
200
-
-
... More
(c) Removing unserviceable handle of chair steel with arms and S&F handle made out of Ist class hard wood duly black painted complete all as specified and shown on drawing.
100
-
-
... More
PAINTING :(a) M&L for preparing old painted internal /external surfaces of following steel furniture articles of MES pattern including newly replaced parts(if any) by removing peeled off paint,dirt,dust,dents etc ,applying paint putty to make good/level the surfaces including applying a coat of red oxide primer and applying two coats of synthetic enamel paint of shade as approved by Engineer-in-charge /GE with the help of spray machine all as specified and directed by Engineer-in-charge.
(b) The work will be executed where the furniture exist in different user units/Md accns under GE(AF)Gorakhpur including BSO'S furniture yard as directed by Engineer-in-charge. (a) Table computer FD/E6/MAP/03
10
-
-
... More
Teapoy verandah : Painting to teapoy verandah with one coat of synthetic enamel white paint over a coat of red-oxide primer after cleaning,dusting and scratching the entire metal surface with sand paper,making surface neat and smooth.
20
-
-
... More
Bed ply top steel : FD/E6/MAP/08 ® complete all as specified and shown on drawing.
10
-
-
... More
Charpoy MS Square hard top :FD/MAP-II/01 complete all as specified and shown on drawing.
20
-
-
... More
Table steel officers FD-84(M),FD-381,FD-1002,FD-1003,1004 complete all as specified and shown on drawing.
5
-
-
... More
Table steel Clerk FD-84(M),FD-381,FD-1002,FD-1003,1004 complete all as specified and shown on drawing.
5
-
-
... More
Chair CBA FD-75 complete all as specified and shown on drawing.
200
-
-
... More
Chair school with hand board FD/E6/MAP/05, FD -261/TP complete all as specified and shown on drawing.
30
-
-
... More
Almirah steel large FD-67(M),351,1031 complete all as specified and shown on drawing.
100
-
-
... More
Almirah steel med FD-243 complete all as specified and shown on drawing.
60
-
-
... More
Locker bed side steel FD-127(M),257,1029 complete all as specified and shown on drawing.
59
-
-
... More
Almirah steel large 1/2 HANGING 1/2 SHELVING : FD-114(M), FD-1033, FD/E6/MAP/18 complete all as specified and shown on drawing.
9
-
-
... More
Chair verandah:- FD-19, FD-256, FD-359, FD/MAP-II/06 : Painting to chair verandah with one coat of synthetic enamel white paint over a coat of red-oxide primer after cleaning ,dusting and scratching the entire metal surface with sand paper ,making surface neat and smooth.
400
-
-
... More
Table 3x3 FD-1008 complete all as specified and shown on drawing.
23
-
-
... More
Rack steel close type 12' FD-106M complete all as specified and shown on drawing.
20
-
-
... More
Chair writing steel paded with arm complete all as specified and shown on drawing.
30
-
-
... More
Book shelf FD-1028,336/ TP complete all as specified and shown on drawing.
15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements