Military Engineer Services Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Military Engineer Services - MES Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date26 Nov 2024
Closing Soon24 Dec 2024
Tender Amount₹ 20,00,000
Costs
EMD
₹ 40,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_685781_1Tender No
CWE(AF)/CHK/EM/T-64 OF 2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Item No. 1 continued (x) Painting of transformer with or without OLTC including HV/LV side marshalling box with one coat of synthetic enamel paint by using spray painting method including cleaning of existing surface of all dirt and greasy materials alongwith marking of SM/MES Nos with sticker letters n. exc 2 cm height at appropriate places complete after isolating the transformer from the electric supply and to be earthed all as specified and as directed. (y) Cost of transportation of transformer upto workshop & back and disconnection, dismantalling, installalation after repair including electic /earth connection is deemed to be included under quoted rate. (z) Winding of coil shall be measured and paid separately under respective item. (aa) Diagnosing of defect/fault and submission of test report before and after is included in the quoted rates
-
-
-
... More
Complete over hauling, commissioning and testing of transformer of 11KV / 415 Volt, step down, out door/indoor type of capacity up to 500 KVA of comprising the following work services at 7 AFH Area :- (a) Disconnection of cable termination of HV & LV ends. (b) Opening of top cover by removing nuts, bolts and all mounting accessories and conservator tanks for visual inspection. (c) Checking of HV/LV insulators including internal inspection (d) Replacement of corroded nuts/bolts with double washers, burned lugs, etc by new one (e) Servicing of tap changing gears by cleaning and polishing tapping contact points.
(f) Removing, cleaning, polishing of bushings and studs of both HV/LV side by using soft cotton cloth including checking for cracking and refixing the same.
(g) Refixing all cable terminals HV & LV sides and transformer top cover, conservator tank and other fitments in position.
(h) Filling of new silica gel in breather.
(j) Connecting HV & LV side with existing incoming and outgoing cables including re-connection of earth strip/lead. (k) HV side cable connection shall be made with new HV tape & M Seal Monoplast as required at site.
(l) All marshalling boxes to be cleaned from inside. (m) All the terminal connection of control and relay wiring to be checked and tighten.
(n) Examine the rollers carefully includes greasing them properly.
1
-
-
... More
Item No. 2 continued (o) Checking of earthing connection and tightening nuts& bolts with ensuring the earthing system working properly. (p) Buchloz relays shall also be checked and made serviceable. (q) The cost of replacement of unserviceable nuts, bolts with double washers, HV / LV tape used, M-Seal, Monoplast, cable end socket, etc shall deemed to be included in the quoted rate.
(r) For inspection of internal defect of transformer, the contractor shall provide proper lifting arrangements like Hydra,tripod, chain &pully, T&P etc and the cost on this account shall deemed to be included in the quoted rate. (s) Contractor shall isolate the transformer from the supply and do earth the transformer properly while servicing the transformer
(t) The entire service included Transformer with or without OLTC/off load tap changer. ( u) Rectifying and arresting the oil leakage of transformer of any capacity, disconnection of cable termination of HV& LV ends , opening the top cover by using tripod, chain and pulley after removing all fitments, replacing the components of the transformer such as gaskets, "O" rings etc. Rectify the leaks in a variety of areas such as radiator fins, flanges, circuit breakers, valves, fastener assemblies, Oil leakage through pin hole / crack joint , drain valve / radiator valve , Oil leakages through gasket joints. Applying putty/M-Seal Monoplast where ever necessary. Refixing the top cover and all fitments, refixing cable termination of the HV& LV ends, testing and Cost of all type of gasket, "O" rings, putty/M-Seal Monoplast, lugs, nuts, bolts, double washers etc shall deemed to be included in the quoted rate.
-
-
-
... More
Item No. 2 continued (v) Painting of transformer with or without OLTC including HV/LV side marshalling box with one coat of synthetic enamel paint by using spray painting method including cleaning of existing surface of all dirt and greasy materials alongwith marking of SM/MES Nos with sticker letters n. exc 2 cm height at appropriate places complete after isolating the transformer from the electric supply and to be earthed all as specified and as directed. (w) Cost of transportation of transformer upto workshop & back and disconnection, dismentalling, installalation after repair including electic /earth connection is deemed to be included under quoted rate.(x) Winding of coil shall be measured and paid separately under respective item.
-
-
-
... More
NOTE applicable for item no 1 and 2 :- (i) The transformer shall be got repaired from authorised work shop of transformer. The contractor shall also produce test certificate as per IS-1180 alongwith high voltage test from the firms after repair.
(ii) All the transformer shall be opened in presence of Engr- in- Charge/ rep of Engr-in-Charge to verify the various repairs/replacement involved and the transformer shall be assembled in the presence of Engr- in- Charge/his rep after necessary repairs/replacement.
(iii) All the transformer shall be tested in the authorised workshop in the presence of Engr- in- Charge/ his rep, as per ser note No 1 above and also in addition the transformer where specified to be installed and commissioned on the 2/4 pole structure, platform and also shall be tested by the contractor in the presence of and as directed by Engr- in- Charge.
(iv) All the testing arrangement shall be provided by the contractor without any extra payment.
(v) The contractor shall also furnished a guarantee certificate himself and from the firm where the transformers are repaired by the contractor for rectification of the defects. If any defect noticed during liability period from the certified date of completion and shall be rectified by the contractor under his own arrengment with no financial assistance from the deptt.
-
-
-
... More
(vi) The above shall however does not absolve the responsibility of the contractor for rectification of any defect, if any noticed during guarantee period as per condition 46 of IAFW-2249 and the contractor shall be solely responsible for entire completion of work and for rectification of the defect/replacement of items/parts and required pointed out by the GE during defect liability period. Payment only for dehydration of the transformer oil and painting of the transformers replacement of certain items considered separately here- in- before shall only be made for separately. All other minor repair/replacement as required and ordered by the Engr- in- Charge for entire completion of work shall be deemed to be included in the unit rate of the above items.
(vii) The contractor shall also clear the breathers. The unit rate quoted by the contractor shall included this aspect also.
(viii) Contractor shall provide all arrangement for carefully handling/ transportation of equipment by means of crane/chain pully/recovery van and vehicles as per requirements and directed by Engr- in- Charge.
(ix) Transformer oil tank rubberised 6.0mm thick gasket sheet pasted using gasket solvent, oil level gauge, drain valve, painting inner side tank by zinc chromate paint and outer side by approved paint included in this item rate.
(x) The rate quoted by contractor shall include all these aspect. While quoting the tender, that quoted rate also include the provisioning of providing electric connection to exisiting system.
-
-
-
... More
Supply and topping of new insulation oil (transformer oil IS-335 of 1983 marked) filtered and tested upto 70 KV di-electric strength at 2.5 mm gap in insulated sealed drum duly ISI marked complete all as specified and directed.
NOTE : (i) Purchase Voucher and test certificate will be produced by Contractor at the time of claiming payment.
(ii) Before topping up transformer oil sealed container shall be got checked at MES store yard.
1600
-
-
... More
Dehydration/ filtration of transformer oil of existing transformer installed at site with portable plant at a temp 60-70 deg. C and achieving di electric strength of not less than 50 KV for 1 minute in 4 mm gap as per IS 335 of 1983 including top up transformer oil upto the level complete all as specified and as directed by Engr-in-Charge. Note:- (i) Conducting field testing of di-electric strength and acidity test of Tr. Oil to be carried out with acidity test kit before and after filtration. (ii) Transformer oil required for top up shall be measured and paid separately. (iii) The Contractor shall arrange his own the electric power required for testing/ de-hydration if required.
3000
-
-
... More
Supply and fixing in replacement of air breather assembly with silica gel of superior quality for air breather of transformer complete all as specified and as directed.
4
-
-
... More
M&L for chemical earthing complete with copper plate electrode 900mmx600mm x 5 mm thick buried directly in ground with top edge of plate not less than 4.5mtr deep below the normal ground level connected to copper strip 32 x 6mm copper strip as main earthing lead and connected and tinted copper bolt, nuts, check nuts ad washers besides brazing at all joints all as directed and connected to earth test point all as specified and directed with and including necessary excavation and earth work, returning filing, removal of extra soil etc, filing adequate quantity of charcoal dust, common salt and MgSO4, PCC (1:3:6) type C-1 using 20mm graded stone aggregate for earth pit chamber with 40mm x 40mm x6 mm mild steel angle iron frame for cover, pre-cast 50 mm thick RCC cover in (1:2:4) type B-1 using 20 mm graded stone aggregate , reinforcement with 8mm TMT bar @ 75 mm c/c on both way , funnel with wire mesh and 50mm dia galvanised iron pipe light grade for earth lead protection and 40 mm dia galvanised iron medium grade for watering including testing on completion complete all as specified and as directed at 33 KV Sub Stn Chandmari and 11 KV Sub Stn at 7 AFH. Note :- (i) The excess requirement (if more than 7.5 Mtr) of copper strip will be measured and paid separately.
(ii) If the excavation exceeds beyond 4.5 mtr depth, the cost of extra depth will deemed to be included in this item rate.
6
-
-
... More
S&F Copper strip 32 x 6 mm for extension of earth and connected to transformer/equipment or panel with proper clamp,saddle,nuts,bolts and washers etc properly complete all as specified and as directed .
40
-
-
... More
M&L for rewinding of transformer with super enameled double paper covered copper wire/ strip for HV/LV winding having existing size and giving proper insulation and de-moisturizing before assembling the winding core and including primary testing, ratio testing, no load testing, core insulation testing including taking out unserviceable winding wire complete all as specified and as directed.
450
-
-
... More
Replacement of transformer oil temperature gauge, range shall be 0 to 120 degree centigrade as per existing type and model complete all as specified and as directed.
4
-
-
... More
Supply, installation, testing and commissioning in replacement of isolator 33KV, outdoor type duty isolator, hand operated triple pole, off circuit, fault making, horizontal mounted,18 insulator type, centre post rotating type, double stac, 33 KV, 400 Amps, all as specified in particular specification and as per IS-9921 including taking down old unserviceable isolator complete all as specified and as directed.
1
-
-
... More
S&F in replacement of 33KV GOD vertical type double stacked triple pole mechanically operated mounted on insulator and steel frame with operating mechanism worked from ground level for current rating upto 200 Amps suitable for working voltage 33 KV, operating type handle with locking arrangement complete with nut bolt washer complete all as specified and as directed.
2
-
-
... More
Taking out existing HT cable off sizes up to 300 Sqmm 3 core from duct/wall/floor/ trenches required at site all as specified and directed by Engineer-in-Charge.
200
-
-
... More
Excavation in trenches not exc 1.5 Mtr wide and not exc 1.5 Mtr in depth and getting out in soft/loose soil as in cable complete all as specified and as directed.
57
-
-
... More
Returning, filling in including spreading, levelling, watering & well ramming in layers not execeeding 25 cm thick complete all as specified and as directed.
39
-
-
... More
Removing excavated soil/demolished material not exceeding 50 Mtrs from the starting point all as directed.
18
-
-
... More
M&L for dry Ganga sand for cushioning for laying cable in trenches all as directed by Engineer-in-Charge. Note:-Punned thickness shall be considered for measurement purpose.
13
-
-
... More
Supplying and laying un- reinforced precast concrete cable cover, class HV type 1, flat, size 300mmx180mmx40mm complete all as specified and as directed.
900
-
-
... More
Material & labour for cutting /boring hole under road/pavement/ hardstanding/ plinth protection with the help of trenchless technology using ultra sound technique and necessary machine complete including HDPE pipe of 100mm dia suitable for 0.4 mpa working pressure not less than one metre below ground level complete all as specified and as directed.
(Note : Quoted rate shall be included the cost of HDPE pipe 100mm dia medium grade and all material required for repairing to disturbed surface complete all as per existing site and all as directed by Engineer-in-charge.
12
-
-
... More
Supply & laying HT XLPE Insulated screened aluminium stranded conductor cable PVC bedded galvanized strip armoured heavy duty 11 KV cross sectional area 120 Sqmm 3 Core conforming to IS 7098 lead in duct/trenches/supporting with pole /passing through pipe complete all as specified and directed.
200
-
-
... More
Supply, jointing , commissioning and testing in replacement heat Shrinkable end joint kit outdoor type complete with all fittings and jointing materials suitable for HT11 KV ( E ) XLPE cable 50 to 95 sqmm 3 core all as specified and directed.
8
-
-
... More
Supply, jointing , commissioning and testing in replacement heat Shrinkable end joint kit outdoor type complete with all fittings and jointing materials suitable for HT11 KV ( E ) XLPE cable 120 to 185 sqmm 3 core complete all as specified and directed.
8
-
-
... More
Supply, jointing , commissioning and testing in replacement of straight through joint (heat shrinkable) suitable for aluminium conductor cable of size 240 sqmm to 400 sqmm x 3 Core 11000 Volts grade complete all as specified and directed.
4
-
-
... More
Supply, jointing , commissioning and testing in replacement of straight through joint (heat shrinkable) suitable for aluminium conductor cable of size 120 sqmm to 185 sqmm x 3 Core, 11000 Volts grade complete all as specified and directed.
4
-
-
... More
Supply, jointing , commissioning and testing in replacement of heat shrink LT end joints of size 185 sqmm to 240 sqmm complete all as specified and directed.
4
-
-
... More
Supply, jointing , commissioning and testing in replacement of heat shrink LT end joints of size 300 sqmm to 400 sqmm complete all as specified and directed.
4
-
-
... More
Labour & transportation for shifting of 11/0.433 KV transformer from one location to another location with in cantt area and making connections and testing complete all as specified and directed. Note : Safe transportation of transformer for shifting is responsibility of contractor.
2
-
-
... More
M & L for hardcore of broken stone or boulders gauge of 40mm , deposited, spread and levelled in layers n exc. 15cm thick, watered and remmed to a true surface, complete all as specified
30
-
-
... More
Supply & fix in replacement of drain valve of suitable size including decanning & refilling of transformer oil with disconnection,reconnection is included in quoted rates.
2
-
-
... More
Supply & fix in replacement of procelain transformer HV bushing insulator with stud 11/.433 KV upto 500 KVA transformer complete including decanning & refilling of transformer oil with disconnection,reconnection of HV/LV side cable,opening top cover with replacement of cork sheet is included in the quoted rates.
4
-
-
... More
Supply & fix in replacement of procelain transformer LV bushing insulator with stud 11/.433 KV upto 500 KVA transformer complete including decanning & refilling of transformer oil with disconnection,reconnection of HV/LV side cable,opening top cover with replacement of cork sheet is included in the quoted rates.
4
-
-
... More
Supply and fixing in replacement of porcelain transformer bushing with complete stud with brass nut bolt washers complete of 36 KV IS:3347 suitable for 33/11 KV, 3.15/2 MVA transformer complete all as specified and directed.
2
-
-
... More
Supply and fixing in replacement of ruber seal/gland on HT/LT studs of transformer including decanning & refilling of transformer oil with disconnection,reconnection of HV/LV side cable,opening top cover with replacement of cork sheet is included in the quoted rates complete all as specified and directed.
6
-
-
... More
Removal of old painted surface of Transformer complete upto 500 KVA capacity by scraping with emry paper and cleaning by thinner and finishing the surface smooth for new painting of two coat of spray painting with synthetic enamal paint complete including writing of SM/MES No and colour code all as directed by Engineer-in-Charge.
12
-
-
... More
M&L for one coat of aluminium painting with synthetic enamel paint of all MS Channels structure of CT , PT, Islotaor switch , LA and DO fuse etc as per color code after preparation of old surface of 33 KV out door Switch yard at take over Point all as specified and directed.
1
-
-
... More
Supply and Fix HT insulation tapes ISI Marked for terminating high voltage cables for insulation sealing of connection of wire and cable for bus bar insulation, transformer terminal insulation etc complete all as specified and directed.
45
-
-
... More
Repair to earth pit & earth pit cover of any type and size by using PCC 1:2:4 and plastering in CM 1:3 complete including excavation, returning filling and removal etc complete all as specified and directed.
15
-
-
... More
Material and labour for replacement of old rubber insulating mat of size 2mtrx1mtrX25mm thick for HT equiment ISI Marked all as specified and direceted.
10
-
-
... More
S&F in replacement of cable route marker made of galvanised iron with embossing of HT cable supproting MS angle of 75 cm long for HT cable route marking duly embedded in and including PCC 1:3:6 foundation upto 30 cm including excavation and earthwork complete all as specified and direceted.
20
-
-
... More
M&L for repair of tap changer for transformer of capacity up to 3.15 MVA including soldering/brazing all necessary repairs servicing replacement of nut bolts complete all as specified& directed by Engr-in-charge. Note :- Decanning & refilling of transformer oil,opening of top cover, disconnection & reconnection of Cable is included in quoted rates.
1
-
-
... More
Draining out Servo Voltage Stabilizer oil of capacity 500 KVA and keeping safe for re-use,dismantling various parts of Servo Voltage stabilizer etc, openig of top cover of Servo voltage stabilizer, lifting and taking out carefully winding core assembly with the suitable chain pully arrangement for repair, cleaning of sludge including washing down with clean oil complete all as specified and directed.
1
-
-
... More
Taking out old unserviceable winding wire of Servo Voltage Stabilizer including removing of unserviceable insulating materials from core assembly of stabilizer with and including M&L for rewinding with super enameled copper wire double paper insulated of existing gauge copper wire including de-moisturising/ovening winding core assembly of capacity 500 KVA Servo Voltage Stabilizer, re-fixing the winding core assembly and other parts of Servo voltage stabilizer including testing i.e. ratio test, insulation test etc. and re-connecting of incoming and outgoing connection etc. complete all as specified and directed.
150
-
-
... More
M&L for insulating material requried for Servo voltage stabilizer core, winding, providing cotton tapes, spacers etc complete all as specified and directed.
1
-
-
... More
S&F in replacement of electronic cards as per existing capacity suitable for 500 KVA stablizer complete all as specified and directed.
1
-
-
... More
S&F in replacement of servo motor of 10 Kg.cm torque as per existing capacity suitable for 500 KVA stablizer complete all as specified and directed.
1
-
-
... More
S&F in replacement of micro switch suitable as per existing capacity for 500 KVA stablizer complete all as specified and directed.
1
-
-
... More
S&F in replacement of RC network for motor as per existing capacity suitable for 500 KVA stablizer complete all as specified and directed.
1
-
-
... More
S&F in replacement of carbon bushes as per existing capacity suitable for 500 KVA stablizer complete all as specified and directed.
2
-
-
... More
S&F in replacement of dimmer as per existing capacity suitable for 500 KVA stablizer complete all as specified and directed.
1
-
-
... More
S&F in replacement of gears as per existing capacity suitable for 500 KVA stablizer complete all as specified and directed.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%