Military Engineer Services Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Military Engineer Services - MES Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date28 Jan 2025
Closing Soon25 Feb 2025
Tender Amount₹ 39,16,000
Costs
EMD
₹ 79,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MES_695320_1Tender No
GE/RND-85/AGR/2023-2024Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://mes.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying cement concrete 1:3:6 (using natural sand of grading zone-III and stone aggregate 40mm graded) in position cement concrete of specified grade excluding the cost of centering and shuttering complete all as specified and directed.
38.29
-
-
... More
Providing and laying cement concrete 1:2:4 (using 20mm graded stone aggregate ) as in retaining walls,wall(any thickness) including attached pillasters, columns, piers, abutments, pillars, posts, struts, parapets, coping, bed blocks, anchor blocks, window sills, fillets, sunken floors etc upto floor five level, excluding the cost of centering and shuttering specified grade complete all as specified and directed.
3.96
-
-
... More
Use and waste for Centering and shutteing including struting, propping etc, and removal of form for foundation, footing, bases of columns, etc for mass concrete complete all as specified and directed.
231.81
-
-
... More
Use and waste for Centering and shutteing including struting, propping etc, and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers complete all as specified and directed.
198.66
-
-
... More
Use and waste for Centering and shutteing includig struting, propping etc, and removal of form for columns, pillars, piers, abutments, posts and struts, complete all as specified and directed.
311.89
-
-
... More
Use and waste for Centering and shutteing including struting, propping etc, and removal of form for small lintels not exceeding 1.5 m clear span, moulding as in cornices, window cells, string courses, bands, coping, bed plates, anchor blocks and the like complete all as specified and directed. Note:- For SI item No 6 to 9 : only steel shuttering as well as steel props shall be used
29.98
-
-
... More
M&L for Steel reinforcement TMT bars of any size and dia of grade Fe-500D or more for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level complete all as specified and directed.
4088
-
-
... More
M&L for Steel reinforcement TMT bars of any size and dia of grade Fe-500D or more for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth level complete all as specified and directed.
5330.16
-
-
... More
Providing and laying in position ready mixed or batched design mix cement concrete of M25 grade with minimum cement content 330 Kg/cum for all works upto plinth level for reinforced cement concrete work: using coarse aggregate and fine aggregate derived from natural cources, Portland Pozzolana/Ordinary Portland cement, admixtures in recommended proportions as per IS : 9103 to accelerate/retard setting of concrete, to improve durability and workability without imparing strength : including pumping of concrete to site of laying, curing, carriage for all leads: but excluding the cost of centering and shuttering and finishing and reinforcement as the direction of the engineer in charge.
88.99
-
-
... More
Providing and laying in position ready mixed or batched design mix cement concrete of M25 grade with minimum cement content 330 Kg/cum for all works above plinth level for reinforced cement concrete work: using coarse aggregate and fine aggregate derived from natural cources, Portland Pozzolana/Ordinary Portland cement, admixtures in recommended proportions as per IS : 9103 to accelerate/retard setting of concrete, to improve durability and workability without imparing strength : including pumping of concrete to site of laying, curing, carriage for all leads: but excluding the cost of centering and shuttering and finishing and reinforcement as the direction of the engineer in charge.
Note:- Design mix shall be carried out by weigh batching plant or RMC shall be used from any automatic weigh batching plant as mentioned in Appx 'B'.
27.22
-
-
... More
M&L for Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in superstructure above plinth level upto floor V level in all shapes and size in cement mortar 1:6 complete all as specified and directed.
60.94
-
-
... More
M&L for 12mm cement plaster in fine sand of mix 1:4 on external faces of walls finish the surface even and fair complete all as specified and directed.
890.23
-
-
... More
M&L for 15mm cement plaster in fine sand of mix 1:4 on the rough side of single or half bick wall finish the surface even and fair complete all as specified and directed.
624.25
-
-
... More
Finishing the walls with water proofing cement paint if required shade on newly plasered surface of walls(Two or more coats applied @ 3.84 Kg/10 Sqm) complete all as specified and directed.
1519.48
-
-
... More
Coal tarring two coats on new work using 0.16 Litre and 0.12 Litre coal tar per Sqn in the first coat and second coat respectively complete all as specified and directed.
6.28
-
-
... More
M&L for ready mix red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel work and Painting new steel surfaces with synthetic enamel paint of approved brand and manufacture of required colour to give the even shade including preparation of surfaces complete all as specified and directed.
40.55
-
-
... More
M&L for angle iron post & struts of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10mm dia etc complete all as specified and directed.
1060.09
-
-
... More
M&L for mild steel grills/grating complete all as specified and directed.
41
-
-
... More
Providing and fixing concetina coil fencing with punched tape concertina coil 600 mm dia 10 meter openable length (total length90m), having 50 Nos rounds per 6m length, upto 3 metre height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.0m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforces barbed tape(R.B.T.)/Spring core(2.5mm thick) wire of high tensile strength of 165 Kg/sq.mm with tape (0.52 mm thick) and weight 43.478 gm/metre (cost of M.S angle, CC blocks shall be paid saperately) complete all as specified and directed.
274.8
-
-
... More
Broken Glass coping on top of walls set in 25 mm thick cement mortar 1:3 complete all as specified and directed.
99.17
-
-
... More
Taking down Chowkats/frames with shutter without taking off shutters from frames n.exc. 1.5 Sqm each complete all as specified and directed.
68
-
-
... More
Taking down Chowkats or frame n.exc. 1.5 Sqm each complete all as specified and directed.
28
-
-
... More
Taking down Chowkats or frame exc. 1.5 Sqm but n.exc 4 Sqm each complete all as specified and directed.
32
-
-
... More
Taking down Chowkats/frames with shutter without taking off shutters from frames exc. 1.5 Sqm but n.exc 4 Sqm each complete all as specified and directed.
23
-
-
... More
Taking down rolling shutter area exc. 4 Sqm each complete all as specified and directed.
10
-
-
... More
Dismantling of timber scantling unframed 40 Sqcm or above complete all as specified and directed.
0.09
-
-
... More
Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed.
1.47
-
-
... More
Taking down steel tubing 20 mm bore complete all as specified and directed.
8.5
-
-
... More
Taking down steel tubing 15 mm bore complete all as specified and directed.
18
-
-
... More
Demolition of reinforced cement concrete in roof(other than ground floor), beams, column staircase, landing, chajjas and similar work including removal of debris from the site complete all as specified and directed.
162.94
-
-
... More
Demolition of reinforced cement concrete in ground floor slab, chajjas, ramp slab, parapet walls and similar work including removal of debris from site complete all as specified and directed.
112.5
-
-
... More
Demolition of reinforced cement concrete not otherwise specifically provided for complete all as specified and directed.
127.23
-
-
... More
Demolition of brick work in cement mortar including all quoins and cleaning of mortar from bricks, stacking and removing the same from site complete all as specified and directed.
403.3
-
-
... More
Demolition of PCC in ground floor of any description n.exc 15 cm thick & removal of demolished material ouside MoD land complete all as specified and directed.
90.4
-
-
... More
Excn and removal of filled earth under floor from site out side MoD land including levelling the surface to a true strata with existing ground level complete all as specified and directed.
187
-
-
... More
Note for Items No 24 to 38 : The contractor shall fabricate temporary pickets using Angle Iron frame and GI sheets of not less than 3.00m height around the building and shall be fabricated at enough space from the building for smooth manouvering of the workers. The decision of Engr-in-Charge shall deemed to final and binding and the cost shall deemed to be included in quoted rates.
-
-
-
... More
The contractor shall demolish RCC in complete and take out the reinforcement for its measurement and shall be stacked at a place as directed by Engineer-in-charge. If the contractor fails to do so, the reinforcement shall be considered @ 100.00 kg/Cum in schedule of credit.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%