Military Engineer Services Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Military Engineer Services - MES Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date21 Oct 2024
Closing Soon18 Nov 2024
Tender Amount₹ 43,24,000
Costs
EMD
₹ 86,480Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_663104_2Tender No
8200-1446/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://MilitaryEngineerServices
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cont/-..
(q) Maximum back pressure of 8.500 KPa exertd by the Emission Control retrofit device at max prescribed load by DG OEM (as per the capacity of the DG set). Necessary precaution to be taken in Exhaust scheme design to avoid condensate/steam back entry to DG sets which is/are not in operation.
(r) The Retrofit emission control device shall be with corrosion resistive and heat resistance paint.
(s) Standard set of tools consisting of a set of 3 spanners, one screw driver, one standard plier and one nose plier of appropriate size shall be provided along with each Retrofit Emission Control Device (RECD).
(Note : Retrofit Emission Control Device (RECD) shall comply all norms as per CPCB.
-
-
-
Description all as per Item No 1.00, 1.01 to 1.03 above but DG set of capacity 140 KVA.
1
-
-
Description all as per Item No 1.00, 1.01 to 1.03 above but DG set of capacity 160 KVA.
2
-
-
Description all as per Item No 1.00, 1.01 to 1.03 above but DG set of capacity 250 KVA.
2
-
-
Note for Serial Item No 1.00 to 4.00 :-
(a) Test report and type approval certificate with registration number & date of one of the Retrofit Emission control Device manufacturer registered with CPCB upto bid submission end date and certified by CPCB recognised/approved labortaries shall be uploaded alongwith application of tender documents in cover-1.
(b) Test report and Type approval certificate of the Retrofit Emission Control Device will be from one of the following CPCB recognised / approved Laboratories:- (i) Automotive Research Association of India, Pune (Maharashtra).
(ii) International Centre for Automotive Technology, Manesar (Haryana)
(iii) Indian OiL Corporation, Research and Development Centra, Faridabad (Haryana)
(iv) Indian Institute of Petroleum, Dehradun (Uttarakhand)
(v) Vehicle Research Developement Establishment, Ahmednagar (Maharastra)
(c) Authorisation letter of OEM shall be uploaded alongwith application of tender documents in cover-1. In case of non submission of OEM authority letter bid of the bidder shall not be consider for opening of Cover-II (Financial Bid).
(d) Number of preventive maintenance visits in a year during warranty period 2 visit.
Cont/---
-
-
-
Cont/--
(e) The contractor shall provide the trail run (testing) of Retrofit Emission Control Device (RECD). The trial run shall be for two hours/ The electrical loading shall not be more than the rated capacityof the DG Set.
(f) Any other activity, exhaust piping of suitable size, civil work, copper wire etc required at site to make the Retrofit Emission Control Device (RECD) fitment will be provided by the contractor without any extra cost to the Govt & no additional payment will be made on this account. (g) Emission of PM (Particulate Matter) must be tested from NABL approved lab before and after fixing/installation the device and test report to be submitted/provided.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%