Military Engineer Services Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Military Engineer Services - MES Tender
Civil And Construction
Electrical and Electronics
Water Storage And Supply
Electrical Works
Eprocure
Opening Date24 Jul 2024
Closing Date13 Sep 2024
Tender Amount₹ 45,00,000
Costs
EMD
₹ 90,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_667749_1Bid Award Id
ViewTender No
8758/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
All as per Srl item No. 3 but sewage treatment plant 450 KLD capacity'
1
-
-
All as per Srl item No. 3 but sewage treatment plant 1000 KLD capacity'
1
-
-
All as per Srl item No. 3 but sewage treatment plant 1500 KLD capacity'
1
-
-
Desludging of existing MBBR tank of sewage treatment plant 250KLD capacity and getting out sludge through sucking super soccer machine and depositing to a distance exceeding 1.5km but not exceeding 2.00 Km outside MD land at isolated place. Straining pvc media and cleaning with clean water and reuse for proper functioning complete all as specified & directed .Note- (i) Pumping out sludge water from MBBR tank by using Diesel engine operated pump and necessary diesel is to be arranged by contractor during cleaning of tank. Rate quoted by contractor are deemed to be included this aspect.
1
-
-
All as per Srl item No. 7 but sewage treatment plant 450 KLD capacity'
1
-
-
All as per Srl item No. 7 but sewage treatment plant 1000 KLD capacity'
1
-
-
All as per Srl item No. 7 but sewage treatment plant 1500 KLD capacity'
1
-
-
Desludging of existing Tube settler tank of sewage treatment plant 250KLD capacity and getting out sludge through sucking super soccer machine and depositing to a distance exceeding 1.5km but not exceeding 2.00 Km outside MD land at isolated place. Straining pvc media and cleaning with clean water and reuse for proper functioning complete all as specified & directed .Note- (i) Pumping out sludge water from settler tank by using Diesel engine operated pump and necessary diesel is to be arranged by Contractor during cleaning of settler tank. Rate quoted by contractor are deemed to be included this aspect.
1
-
-
All as per Srl item N0. 11 above but sewage treatment plant 450 KLD capacity'
1
-
-
All as per Srl item N0. 11 above but sewage treatment plant 1000 KLD capacity'
1
-
-
All as per Srl item N0. 11 above but sewage treatment plant 1500 KLD capacity'
1
-
-
M&L in replacement of granular Sand of filter media as per existing size complete all as specified & directed.
120
-
-
Desludging of existing set of chlorine contact tank, filter feed tank , storage tank of sewage treatment plant 250 KLD capacity and getting out sludge through sucking super soccer machine and depositing to a distance exceeding 1.5 km but n. exceeding 2.0 km outside MD land at isolated place, straining pvc media and cleaning with clean water and reuse for proper functioning complete all as specified & directed. Note- (i) pumping out sludge water from equalizer tank by using Diesel engine operated pump and necessary diesel is to be arranged by contractor during cleaning of contact tank. Rate quoted by contractor are deemed to be included this aspect.
1
-
-
All as per Srl item No. 16 above but sewage treatment plant 450 KLD capacity'
1
-
-
All as per Srl item No. 16 but sewage treatment plant 1000 KLD capacity'
1
-
-
All as per Srl item No. 16 but sewage treatment plant 1500 KLD capacity'
1
-
-
M&L for filter media of MBBR tank complete all as specified & directed. Make - Weldon or as approved by Engineer in charge.
150
-
-
M&L for carbon for activated carbon filter and dual media filter complete all as specified & directed.
175
-
-
Taking out by lifting of non clog sewage submersible pump including electric motor 5 to 7.5 HP, 3 phase , 415 Volts by disconnecting all electrical & mechanical connection, dismantling the motor, cutting the burnt winding and cleaning the slots with non greasy materials and rewinding with PVC insulated copper wire (Gauge of copper is to match the existing size) with insulating material, varnishing drying complete. Reassembling the motor complete , lowering , installing and making all electrical & mechanical connection and testing complete to entire satisfaction of Engr-in-charge.
15
-
-
Taking out lifting of non clog sewage submersible pump incl. electric motor 10 HP to 12.5 HP ,3 phase ,415 Volts by ,disconnecting all electrical & mechanical connection, dismantling the motor .Cutting the burnt winding and cleaning the slots with non greasy materials and rewinding with PVC insulated copper wire (Gauge of copper is to match the existing size) with insulating material, varnishing drying complete. Reassembling the motor, all as directed ,lowering , installing and making all electrical & mechanical connection, testing complete to entire satisfaction of Engr-in-charge.
8
-
-
Taking out/ dismantling non clog sewage pump unit 5 - 7.5 HP capacity and overhauling, oiling & greasing including replacement of warn out nut bolt & washer, grinding & polishing if required complete Note: Spares impeller, bush, & oil seal will be measured and paid separately under respective items.
15
-
-
Taking out/ dismantling non clog sewage pump unit 10 HP to 12.5 HP capacity and overhauling, oiling & greasing including replacement of warn out nut bolt & washer , grinding & polishing if required complete Note: Spares impeller, bush, & oil seal will be measured and paid separately under respective items.
8
-
-
Supply only non cloging heavy duty impeller for 7.5 HP
4
-
-
Supply only Non cloging heavy duty impeller for 10/12.5 HP
4
-
-
Supply only body coupling
4
-
-
Supply only bush for 7.5 HP to 12.5 HP capacity
8
-
-
Supply only NRV complete.
8
-
-
Supply only oil seal for 7.5 to 12.5 HP complete.
8
-
-
Supply only racring complete.
10
-
-
Taking out centrifugal pump including electric motor 3 to 10 HP ,3 phase , 415 Volts after, disconnecting the electric connection. Dismantling the motor & cutting the burnt winding and cleaning the slots with non greasy materials and rewinding with super enameled copper wire (Gauge of copper is to match the existing size) with insulating material, varnishing complete. Reassembling the motor, repair and overhauling of pumps, replacement of bearing, grinding , polishing of impeller, neckring , greasing complete all as specified & directed and making electric connection and testing complete to entire satisfaction of Engr-in-charge
8
-
-
Taking out air compressor including electric motor 10 HP 3 Phase 415 V installed at STP disconnecting electric connection and dismantling motor, cutting burnt winding and cleaning slots with non greasy chemical and rewinding with super enameled copper wire of existing gauge incl. insulating material, varnishing complete and repair of compressor by dismantling, grinding, polishing of cylinders, pistons, replacement of piston rings, bearings incl. replacement of compressor oil 5 Ltr , complete all as specified & directed by Enginer- in- charge
5
-
-
Supply and replacement of pressure gauge (water) range -0-20 Kg/cm² complete all as directed.
2
-
-
S & F in replacement of Non clog sewage with cutter type impeller submersible pump set 7.5 HP, 3 phase ,415 Volts including lifting & dismantling unserviceable motor complete all as directed.
2
-
-
Dismantling and taking out defective unserviceable butterfly valve and replacement with new butterfly valve 65 mm bore including jointing with MS nuts, bolts packing, minor adjustment complete all as specified and directed
2
-
-
Dismantling and taking out defective unserviceable butterfly valve and replacement with new butterfly valve 80 mm bore incl. jointing with MS nuts, bolts packing, minor adjustment complete all as specified and directed
2
-
-
Dismantling and taking out defective unserviceable butterfly valve and replacement with new butterfly valve 100 mm bore incl. jointing with MS nuts, bolts packing, minor adjustment complete all as specified and directed
2
-
-
Taking out/Dismantling the unserviceable part of sewage treatment compressor blower and replace with new one complete compressor unit including testing after completion all as specified and directed by Engr-in-Charge
2
-
-
S&F in replacement suction filter suitable for sewage treatment compressor blower complete all as specified and directed.
2
-
-
S&F in replacement gears with Hub complete with hardware suitable for sewage treatment compressor blower complete all as specified and directed.
2
-
-
S&F in replacement V - Belt suitable for sewagwage treatment compressor blower complete all as specified and directed.
8
-
-
S&F in replacement gear oil No -90 suitable for sewage treatment compressor blower complete all as specified and directed.
50
-
-
S&F in replacement of Oil seal and gasket set suitable for sewage treatment compressor blower complete all as specified and directed.
16
-
-
S&F in replacement contactor NO+NC 16/20 Amps capacity 240 volts, 50 HZ, DP complete all as specified and directed . Make- CG/L&T/Seimens
8
-
-
S&F in replacement contactor NO+NC 25/32Amps capacity 415 volts, 50 Hz, FP complete all as specified and directed.
8
-
-
S&F in replacement LED indicating lamp(R), (Y), (B), (G) for cubical panel complete all as specified and directed.
6
-
-
Supply and replacement thermal over load relay of range 6.5 to 10 Amps complete all as specified and directed.
10
-
-
Supply and replacement thermal over load relay of range 16 to 32 Amps complete all as specified and directed.
10
-
-
Supply and replacement single phase preventer 415 volt 50 Hz complete all as specified and directed
10
-
-
Supply transporting filling in liquid chlorine contact tank Calcium hypochlorite, 10-12 % superior quality packed in 50 Kg PVC container sealed with manufacturer monogram complete all as directed by Engr-in-Charge.
1000
-
-
S & F in replacement of PVC flexible hose pipe 100 mm dia for connecting Sewage /suction pump incl arrangement complete all as directed.
100
-
-
S & F in replacement of MS pipe 100 mm dia for column pipe /pumping line of sewage line incl arrangement complete all as directed.
75
-
-
Supply transporting filling in Poly alluminium chloride (PAC) compound of 25 Kg bag and filled in PAC container of STP complete all as directed by Engr-in-Charge.
20
-
-
Supply transporting filling flocculent granual Bio tech grade in polybag of 25 Kg and filled in flocculent container of STPs complete all as directed by Engr-in-Charge.
10
-
-
Section 'E' (Swimming Pool)
-
-
-
Quarterly Periodical, preventive and comprehensive maintenance by dis-assembling, repairing, overhauling, servicing, connection & testing complete of following equipment's all as specified & directed :-
-
-
-
Suction sweeper machine with motor and trolly
2
-
-
Induction motor upto 20 HP capacity including pump and its incl connected items
2
-
-
Suction sweeper brush
5
-
-
Filtration plant including its all connecting items of swimming pool
5
-
-
S&F PVC flexible pipe of 50 mm dia complete
150
-
-
Taking out old rusted/wornout 50 mm bore GI steel water tubing with connection complete
150
-
-
Taking out old rusted/wornout 20 mm bore GI steel water tubing with connection complete
100
-
-
M&L for laying of GI water tubing medium grade 50 mm dia with all fittings in Golf ground or irrigation of grass and connection from Golf ground well to other area of Golf ground complete all as specified and directed by Engr-in-Charge.
400
-
-
M&L for laying of GI water tubing medium grade 20 mm dia with all fittings in Golf ground or irrigation of grass and connection from Golf ground well to other area of Golf ground complete all as specified and directed by Engr-in-Charge.
400
-
-
S&F gate valve brass 50 mm dia complete all as specified and directed
6
-
-
S&F gate valve brass 20 mm dia complete all as specified and directed
14
-
-
Excavation in trenches in any type of soil not exc 1.5 mtr wide and not exc 1.5 m deep and getting out complete all as specified and directed.
290
-
-
Returning filling with earth obtained from excavation including spreading leveling and well ramming in layers n. exc 25 cm thick complete all as specified and directed.
232
-
-
Removal of surplus excavated soil to a distance not exc 50 mtr and depositing where directed at level not exc 1.5 mtr above starting point complete all as specified and directed.
58
-
-
M&L for sand cushioning in trenches for protection of UG cable provided in layer of sand 8 cm deep before laying the cable and 15 cm deep after laying the cable and punned down to 18 cm complete all as specified and directed. Note : Punned thickness shall be measured and paid separately.
48
-
-
Supply and laying sub class ' B' bricks (Old size) laid flat with width equal to the length of whole bricks over cable as cable protection as in trenches complete all as specified and directed.
4.8
-
-
Supply, laying, connecting and testing of LT cable XLPE insulated, screened PVC bedded galvanised steel strip or wire armoured electric power cable (heavy duty) 1100 volt grade with stranded aluminium conductor cable of size 70 sqmm 3.5 core complete all as specified and directed.
150
-
-
Supply, laying, connecting and testing of LT cable XLPE insulated, screened PVC bedded galvanised steel strip or wire armoured electric power cable (heavy duty) 1100 volt grade with stranded aluminium conductor cable of size 50 Sqmm 3.5 core complete all as specified and directed.
200
-
-
Supply, laying, connecting and testing of LT cable XLPE insulated, screened PVC bedded galvanised steel strip or wire armoured electric power cable (heavy duty) 1100 volt grade with stranded aluminium conductor cable of size 35 Sqmm 3.5 core complete all as specified and directed.
200
-
-
M & L for Opening the filter tank of swimming pool / STP plant and taking out old sand and carbon media including cleaning/ washing complete all as directed.
NOTE: Sand and carbon media measured and paid separately in relevant item.
4
-
-
Supply, transporting & filling in TTCA 95% granuals in 45 Kg container complete all as directed by Engr-in-Charge.
625
-
-
Supply, transporting & filling copper sulphate granuals in 25 Kg bag complete all as directed by Engr-in-Charge.
250
-
-
Testing of Chemical & Bacteriological quality of inlet (Raw Water) and out let (treated water) sewage water of following parameters from state public health laboratory or NABL accredited laboratory (a) PH value
(b) Suspended solids
(c) Total dissolved solids
(d) C.O.D
(e) BOD
(f) Oil & Grease
(g) FC
(h) Total N
Note:- 1. Contractor will provide quarterly testing of sewage inlet & outlet water of all STP's containing fallowing parameter : PH Value, Total suspended solids, oil & grease,BOD, COD as per IS 3025 (P-1)-1987 from Govt/State Govt Lab or approved NABL, Accredited laboratory and rate of same is deemed to be included in unit quoted rate.
2. Contractor will provide all testing instrument and a test lab in installation for instant testing at installation/STP for BOD incubator PH value, Temperature controller , Digital Nephelo turbidity meter digital TSD meter Digital PH meter and digital water marker in water testing lab testing display chart on labNo Extra amount shall be paid for test lab & testing instrument.
9
-
-
M&L for Calcium Hypo chloride (Naocl) granual 65% packed in 45/50 Kg drum used as disinfecting agent in /Pump House/swimming pool/STP of water complete. Make:- Purichlor of Royal Seema Ltd.
5000
-
-
Supply, installation, testing and commissioning in replacement of indoor type cubical panel board suitable for 3 phase, 4 wire, 415V, 50 Hz and CPRI approved manufacturer factory fabricated with CRCA sheet not less than 3 mm thick having modern fabrication process powder coating in approved shade provided with suitable gasket to make it dust and vermin proof and general constructions conforming to IS : 8623/93. The LT panel shall be front and back operable and duly compartmentalized for each control gears. The panel should have suitable size of aluminium Bus -bar three phase 4 wire system having current carrying capacity 400 Amps of the incomer MCCB. The panel should have the following incoming and out going controls duly fixed with the panel by means of suitable link plates complete all as specified and as directed by Engineer -in-charge. (i) MCCB 4, pole 35 KA with adjustable thermal setting, 415V, 160 Amp - 01 No. (ii) MCCB 4, pole 35 KA with adjustable thermal setting, 415V, 100 Amp - 01 No
(iii) Star delta starter comprising suitable size of 3 pole contactors for 40 HP submersible pump with thermal over load relay complete - 01 No
(iv) Motor protection relay for single phase, over load, over voltage (v) Digital Volt meter 0-500 volts
(vi) Ammeter 0-500 amps with suitable size of Cts
(vii) All connections to be done through suitable size PVC insulated copper cables
(viii) LED RYB indicator - 01 Set
(ix) MCB' TP 32 Amps 10 KA - 01 No (X) MCB SPN 32 Amps 10 KA - 01 No
(xi) Single phase preventer - 01 No
Note:- Cost of PCC platform of suitable size for mounting the LT Panel is deemed to be included in the quoted rate
1
-
-
M&L for cleaning the STP area in side the boundary by cutting grasses/ tree branches/ vegetation/ thorney bushes and removal waste materials away from boundary and for further maintain the area the following Items will be provided by the contractor to the operator of STP complete all as specified& directed. (a) TALWAR for cutting the grass two nos at each STP
(b) Axes with wooden opiating handle one no for each STP.
Note:- Rate quoted by contractor are deemed to be included this aspect.
5
-
-
M&L for cleaning the sewage treatment plant area in side the boundary by cutting grasses/ tree branches/ vegetation/ thorney bushes and removal waste materials away from boundary and for further maintain the area the following Items will be provided by the contractor to the operator of STP complete all as specified& directed. (a) TALWAR for cutting the grass two nos at each sewage pump house (b) Axes with wooden opiating handle one no for each sewage pump house. Note:- Rate quoted by contractor are deemed to be included this aspect.
5
-
-
S & F 10 Sqmm 4.0 core copper cable for mono block pumps complete all as specified& directed.
130
-
-
S & F 16 Sqmm 3 core submersible copper cable for 15 HP submersible pumps complete all as specified& directed.
120
-
-
S & F 10 Sqmm 3 core submersible copper cable for 5 HP submersible pumps complete all as specified& directed.
120
-
-
S & F in replacement of Non clog sewage with cutter type impeller submersible pump set 5.5 HP, 3 phase ,415 Volts including lifting & dismantling unserviceable motor complete all as directed.
1
-
-
Schedule of Credit (MINUS) Rs. 68230.00 B/F from Serial Page No. [Note : Details of items for schedule of credit is given on Srl Page No. ] This amount shall be automatically deducted to arrive at tendered sum
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements