Military Engineer Services Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Military Engineer Services - MES Tender

Works
Housekeeping Services
Eprocure
Opening Date20 Jun 2024
Closing Date11 Jul 2024
Tender Amount₹ 9,98,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC OH Reservoir 30000 gallon cap

4

-

-

... More
RCC OH Reservoir 150000 gallon cap

2

-

-

... More
RCC OH Reservoir 100000 gallon cap

2

-

-

... More
RCC OH Reservoir 10000 gallon cap

2

-

-

... More
Material & Labour for cleaning of RCC underground sump of any type and prevent Algae Growth by dewatering existing water complete by manually with bucket or by using pump set etc. including cleaning the internal walls floor with wire brushes, bleaching powder, fresh water & other approved material without damaging the existing surface of wall including cleaning the mouth of washout pipe & taking out the complete sludge & depositing at a distance not exceeding 50 mtr from the site of work & cleaning the complete UG sump surface of walls with fresh water after taking out the complete sludge with entire satisfaction of EIC. in different zone and painted outside on the Tank with Word "Date of Cleaning and Tank Capacity" of the following cap. Note :- All RCC ground clear water reservoir sump of any capacity will be clean after every six months during the contract period.

-

-

-

... More
RCC ground clear water reservoir sump 100000 gallon

4

-

-

... More
RCC ground clear water reservoir sump 30000 gallon

2

-

-

... More
Material and Labour for cleaning of RCC sedimentation tank of any type by dewatering the exiting water complete by manually with buckets or by using pump set etc. including cleaning the internal walls floor with wire brushes, bleaching powder, fresh water and other approved material without damage the exiting surface of walls including cleaning the mouth of wash out pipe and taking out the complete the sludge and depositing at a distance not exceeding 50 mtr from the site of work cleaning the complete UG sump surface of walls with fresh water after taking out the complete sludge and applying of internal walls with 2 coat of suitable hygiene paint using in food container & other hygiene purpose and painted outside on the Tank with Word "Date of cleaning and "Tank capacity all as specified and directed by engineer-in-charge. Note :- All RCC sedimentation tank of any capacity will be clean after every six months during the contract period.

4

-

-

... More
Material & Labour for cleaning of PVC/ RCC Tanks of any stages and on top of OTM and MD accn of any type by manually cleaning the internal walls mouth of inlet & outlet pipe with wire brushes, bleaching powder and fresh water including cleaning the wash out water pipe from top to bottom from inner side and taking out the sludge, removal of all scale and dirt etc. complete & deposited at a site not exceeding 60 mtr from site of work, cleaning the tank inner wall outlet & inlet pipe with fresh water & washout and painted outside on the Tank with Word "Date of Cleaning and "Tank Capacity" all as directed by Engr-in-Charge

-

-

-

... More
PVC OH Tanks 5000 Ltrs cap

12

-

-

... More
PVC OH Tanks 2000 Ltrs cap

20

-

-

... More
PVC OH Tanks 1000 Ltrs cap

200

-

-

... More
PVC OH Tanks 500 Ltrs cap

875

-

-

... More
S&F in replacement of 20 mm Ball valves ( float valve) PTMT, high pressure, with polythene float and fly-nut complete screwed for iron pipe Float Valve, cast iron body, one end flanged type with strainer operating with suction pipe, including nut bolt & washers for joints and jointing material complete all as specified and as directed by Engineer in Charge.

30

-

-

... More
S&F in replacement of 25 mm Ball valves ( float valve) PTMT ,high pressure, with polythene float and fly-nut complete screwed for iron pipe Float Valve, cast iron body, one end flanged type with strainer operating with suction pipe, including nut bolt & washers for joints and jointing material complete all as specified and as directed by Engineer in Charge.

15

-

-

... More
Cleaning of shallow well by removing water from well and cleaning of mud and sludge manually and dewatering pump set of well and white washing of exposed walls of well walls by applying two coat. Removing sludge /Muds etc. depositing at a distance not exc. 50 mtr outside the well with proper surface dressing complete all as specified and directed by Engr-in-Charge.

2

-

-

... More
Cleaning the surrounding area of Overhead/ underground RCC tanks area at different zones cutting removing of grass, shrubs, bushes around Overhead tanks and installations all as directed by Engr-in-Charge and removing from the campus complete all as specified and directed. Note :- The particular job to be operated through out the contract period to maintain the cleanliness of the surrounding are of the installation by removing the shrubs/bushes and grass to the entire satisfaction of the Engr-in-Charge and the periodicity of this item shall be decided by Engineer-in-Charge.

4000

-

-

... More
Note :- (i) Disconnection of Geyser and fans from electric source, inspection of problem, taking down to ground, and transportation from site to market for repair/brazing will be deemed to be included in the rate quoted by the contractor without incurring any extra cost to the department. (ii) Srl Item No 11 and 12 will be issue under Schedule ,B, free for fixing only. (iii) Debris obtained from all items should be removed in low lying areas as directed by Engr-in-charge out of MOD Land. (Rates quoted for items are deemed to be included for this, where removal of debris in the items is not considered.)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.