Military Engineer Services Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Military Engineer Services - MES Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date29 Nov 2024
Closing Date20 Dec 2024
Tender Amount₹ 11,26,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M&L for WBM 150 mm thick compacted thickness in two layers of 75 mm each with course aggregate of grading II (63 to 40 mm) size spread, leveled and rolled and consolidated to required gradient and camber using granite trap or basalt stone complete all as specified and directed.

68

-

-

... More
M&L for preparing unsurfaced WBM surface by wire brushing with wire brushed for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dust etc on unsurfaced WBM complete all as specified and directed.

68

-

-

... More
M&L for applying evenly a priming tack coat with bituminous primer @ 10 Kg / 10 Sqm using paving bitumen on prepared WBM surface by mechancial sprayer complete all as specified and directed.

68

-

-

... More
M&L for premixed bituminous macadam using paving bitumen of VG-30 grade with binder content 4% by weight of total mix and complacted to required gradient and camber laid by mechanical paver (consolidated thickness 50 mm or less) with 8 to 10 tonne power vibrator road roller etc complete all as specified and directed. Note :- (a) Premix concrete shall be mixed in hot mix plant by using design mix and transported from plant to work site and laid / spread by means of mechanical paver. (b) Contractor shall quote his rate on this basis as metioned in Above item if there is any variation in the actual binder content used, the rate shall be adjusted lowerside of binder used however no price adjustment shall be made of the binder content percentage is more as specified above.

28.3

-

-

... More
Material & Labour for 30 mm thick (consolidated average thickness) bituminous premix asphaltic semi dense concerete with 5.5% % binder (of paving bitumen VG-30) content by weight of total mix, rolled & compacted with 08 to 10 tonne power road rolled to required camber and gradient complete all as specified and directed (Laying of bituminous premix asphaltic semi dense concrete with mechanical paver) complete all as specified and directed. Note :- (a) Premix concrete shall be mixed in hot mix plant by using design mix and transported from plant to work site and laid / spread by means of mechanical paver. (b) Contractor shall quote his rate on this basis as metioned in above item if there is any variation in the actual binder content used, the rate shall be adjusted lowerside of binder used however no price adjustment shall be made of the binder content percentage is more as specified above.

68

-

-

... More
M&L for continuous brick edging with width equal to the depth of the brick of whole sub class 'B' brick old size laid on end vertically complete all as specified and directed.

340

-

-

... More
Removing excavated material to a distance exceeding 50 m and not excedding 100 m & depositing where directed at a level n. exc. 1.5 M above the starting point complete all as specified and directed.

204

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.