Meerut Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Meerut Development Authority Tender

Works
Eprocure
Opening Date10 May 2018
Closing Date15 May 2018
Tender Amount₹ 3,72,93,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC WORK with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and bending, but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centring and shuttering etc. and supply of all materials, labour Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip coarse which shall be paid extra.

673.22

4443252

6600

... More
M.S. (TOR Steel or Plain) in Plain work such as R.C.C or R.B work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorised overlapping shall be measured and including cost of binding wire.

530

2968000

5600

... More
M.S. OR Iron work of grill & frame , small size and section such as holding down bolt hold fast tei rods grating etc. wrough to required from includind supply of steel bolt , nuts, wastage etc. and their fixing required for proper completion of the work as desired by engineering incharge

28

166600

5950

... More
Road work

-

-

-

... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20cm layers including remming and dressing the surface to required levels and slopes and also including 1.50 M lift and 30 M lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M distance as directed by the Engineer-Incharge. (Excluding royality)(Royality as per Govt. rate to be paid extra wherever applicable) for small works/Abadi area.(where machine cannot be move)

3932

283104

72

... More
Cartage or earth required for filling 8.0 km….sheet enclosed….

3932

853244

217

... More
Add to item no.253 for Mechinically compacted to achieve 95% proctors density including arrangement of water, settlement and all T&P including roller and its fuel etc.

3932

74708

19

... More
Granular Sub-Base with close graded material (Table:400-1)

-

-

-

... More
Providing, laying, spreading and compacting graded aggregate to Granular Sub-Base with close graded specification including premixing the material with water at OMC in mechanical mix plant carriage of mix material by tipper to site, laying in uniform on well prepared surface and compacting in vibratory roller to achive the desired density. complete as per close 401 (495 Tonne)

1929.79

6168766

3196.6

... More
Providing, laying spreading and compacting graded aggregate to wetmix macadam, specification including premixing the material with warer ai OMC in mechanincal mix plant carriage of mix material by tipper to site, laying in uniform layer with paver in sub base /base course on wall prepared surface and compacting with vibratory rollar to achieve the desired density.

1856.79

6031967

3248.6

... More
Bitumen emulsion 0.750 kg/sqm

-

-

-

... More
Providing and applying primer coat with bitumen emulsion slow setting using spray set including cleaning of road surface and spraying primer at the rate of 0.750 kg per sqm with mechanical mean

8073

209090

25.9

... More
Bituminous Macadam

-

-

-

... More
Providing and laying bituminous madcadam with 60-90 TPH. Hot mix plant producing an average output of 25 cum per hour using cruashed aggregate of specified grading premixed with bituminous binder @ 3.40% transported to site, land over a pre lously prepared surface with paver finisher to the required grade, level and slignment and rolled as per clauses, 501.6 and 501.7 to achieve the desired completion. page-125 unit=cum. Tacking output=205 cum (450 tonnes) (assuming density 2.20 cum)

645.84

4835404

7487

... More
Semi Dense Bituminous concrete

-

-

-

... More
Providing and laying bituminous madcadam with 60-90 TPH. Batch type HMP producing an average output of 25 cum per hour using cruashed aggregate of specified grading premixed with bituminous binder @ 5.00% by weight of total mix and filler transported to site, land over a preiously prepared surface laying with hydrostatic paver finisher to the required grade, level and alignment and rolled as per MORTH specification clauses, 508 to achieve the desired completion. page no.-135 unit=cum. Tacking output=195 cum (450 tonnes) (assuming density 2.20 cum)

322.92

2694767

8345

... More
Laying Sewer Line

-

-

-

... More
Excavation for depth upto 1.5m below ground level for laying sewer, manholes, gully pits, chambers,sumps etc. in ordinary soil (earth sand, loam and clay) including, dressing levelling,refilling of trenches in 20 cm layers watering sand ramming the same including removal of surplus earth of other dismantled materials upto a distance of 50 m from the centre of treanches.

-

-

-

... More
UP TO 1.5M DEPTH

3810

719328

188.8

... More
1.5 TO 3.0

3810

905827

237.75

... More
3.0-4.5

3810

1143000

300

... More
Concrete with 4cm guage brick ballast, Fine sand of 1.25 F.M and cement in proportion of 10:5:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work

209.55

576262

2750

... More
LAYING & CARTING RCC HUME PIPE INCLUDING

-

-

-

... More
Carting of 450 mm dia R.C.C. Hume pipes (NP-3 class) and specials from store to the site of work. Lowering the same into treanches in depth up to 1.5 m below ground level true to alignment, caulking the joints with necessary spun yarn soaked in bitumen and jointing with 1:2 cement mortar in coarse sand including excavation or earth below invert level of pipe , cost of all jointing materials, testing etc. complete but excluding of excavation and refilling of treanches from ground level to the invert level of pipes.

-

-

-

... More
A- 0 to 1.5 BGL

1210

538450

445

... More
A- 0 to 3.0 BGL

1210

573540

474

... More
Carting of 250 mm dia R.C.C. Hume pipes (NP-3 class) and specials from store to the site of work. Lowering the same into treanches in depth up to 1.5 m below ground level true to alignment, chaulking the joints with necessary spun yarn soaked in bitumen and jointing with 1:2 cement mortar in coarse sand including excavation or earth below invert level of pipe , cost of all jointing materials, testing etc. complete but excluding of excavation and refilling of treanches from ground level to the invert level of pipes.

-

-

-

... More
A- 0 to 1.5 BGL

60

16875

281.25

... More
A- 0 to 3.0 BGL

60

18570

309.5

... More
Construction of 1200mm dia brick circular manhole including excavation cutting of jointing pits, trimming dressing levelling refilling of trunches in 20 cm layers removal of surplus earth upto 50m, cement conc. 1:2:4 , Ist class brick work in 1:4 (1cement :4 coarse sand, 15mm plaster in CM1:4 (1cement :4 coarse sand) 12mm internal plaster (1cement :4 coarse sand) , PVC FOOT STEPS AT DISTANCE @ 300MM C/C IN THE WALL cost of cutting making good the same, RCC heavy duty 600 dia Mahole cover with locking arrangement, site clearance

44

1726428

39237

... More
Construction of 1200mm dia brick manhole regulatry shaft including excavation cutting of jointing pits, trimming dressing levelling refilling of trunches in 20 cm layers removal of surplus earth upto 50m, cement conc. 1:2:4 , Ist class brick work in 1:4 (1cement :4 coarse sand, 15mm plaster in CM1:4 (1cement :4 coarse sand) 12mm internal plaster (1cement :4 coarse sand) , PVC FOOT STEPS AT DISTANCE @ 300MM C/C IN THE WALL cost of cutting making good the same, RCC heavy duty 600 dia Mahole cover with locking arrangement, site clearance

44

443388

10077

... More
Construction of 600x600mm size brick manhole including excavation cutting of jointing pits, trimming dressing levelling refilling of trunches in 20 cm layers removal of surplus earth upto 50m, cement conc. 1:2:4 , Ist class brick work in 1:4 (1cement :4 coarse sand, 15mm plaster in CM1:4 (1cement :4 coarse sand) 12mm internal plaster (1cement :4 coarse sand) , PVC FOOT STEPS AT DISTANCE @ 300MM C/C IN THE WALL cost of cutting making good the same, RCC heavy duty 600 dia Mahole cover with locking arrangement, site clearance

5

64190

12838

... More
Construction of 600x600mm size brick manhole regulatry shaft including excavation cutting of jointing pits, trimming dressing levelling refilling of trunches in 20 cm layers removal of surplus earth upto 50m, cement conc. 1:2:4 , Ist class brick work in 1:4 (1cement :4 coarse sand, 15mm plaster in CM1:4 (1cement :4 coarse sand) 12mm internal plaster (1cement :4 coarse sand) , PVC FOOT STEPS AT DISTANCE @ 300MM C/C IN THE WALL cost of cutting making good the same, RCC heavy duty 600 dia Mahole cover with locking arrangement, site clearance

5

18185

3637

... More
Supply od RCC hume pipes NP3class Socket and spigot type 450 mm dia

1210

794970

657

... More
Supply od RCC hume pipes NP3 class Socket and spigot type 250 mm dia

60

19560

326



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.