Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Eprocure
Opening Date13 Nov 2021
Closing Date30 Nov 2021
Tender Amount₹ 16,50,952 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 25,500Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_KESCO_642749_1Bid Award Id
ViewTender No
23/Const./2021-22Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Grouting of ST Pole including cost of Civil Material as per standard specification.
12
-
-
Making of pole plinth including cost of Civil Material.
12
-
-
Erection of Earth Rod complete including cost of Civil Material.
12
-
-
Painting of ST Pole including cost of Paint.
12
-
-
Fixing of M.S. Channel on newly erected D/Pole.
28
-
-
Mounting of Pin Insulator on erected pole.
36
-
-
Erection of Cross bracing.
6
-
-
Shifting of 11KV S/G Panel from unloading point to control room or control to loading point.
1
-
-
Erection of New 11 KV switchgear panel in control room building in proper alignment, grouting of Anchor bolts matching of switchgear with each other matching of bus bar and related work and its earthing including cost of civil material.
1
-
-
Earthing of Panels at two points by M.S. Strip.
1
-
-
Testing and Comissioning of 11 KV Panel including internal wiring and connection.
1
-
-
Laying of control cable including digging of trench and back filling.
100
-
-
Supply of 40 mm dia class 'B' G.I. pipe 60' long along with all related materials required for power T/F 33 KV VCB, 11 KV VCB, 33 KV Control relay panel, 33 KV O/D Metering unit/pilfer proof metering cubical etc. earthing work.
1
-
-
Boring upto 60 feet & lowering of 40 mm dia 'B' class G.I. pipe & filling of coal, sand & Ganga sand around the G.I. pipe.
1
-
-
Connecting of main earthing of control room & jointing with switch gear panel by welding of M.S. flat including all materials.
1
-
-
Digging of Trench for laying of cable in different situations in size of 30 cm. wide and 1 to 1.2 meter deep.
-
-
-
Normal Soil
3600
-
-
Kharanja
400
-
-
Metallic Road
200
-
-
Laying of 11 KV 3x300 mm2 XLPE cable in above digged trench covering with bricks and back filling and proper ramming.
4950
-
-
Installation and commissioning of pilfer proof metering cubical.
1
-
-
Providing and Fixing concrete Stone Route marker of 300 mm width x 150 mm thick x 650 mm height in embedded in earth at least 300 mm below and 350 mm above ground level at the distance of approx 100 Mtr long the length of the cable with RCC concreting as per standard specification. Route marker should be with name of company, distance from marker to cable and cable depth with feeder name marked with Arrow singn.
20
-
-
Digging of suitable pit and making 11 KV St. Th. Joint Box.
4
-
-
Construction of RB Pit 3x1x1 Mtr. with 9 inch thick side wall and 6 inch thick RCC bed along with RCC trench cover in three parts duly plastered and finished for housing St. Th. Joint box.
4
-
-
Making indoor/outdoor joints of 11KV 3x70 sqmm. Cable where the cable is being laid. Jointing Kit will be provided by the Department.
30
-
-
Mounting of cable box on pole, Cable support structure with handling of concerning cable and its proper fixing. (With Pipe)
24
-
-
Mounting of cable box on pole, Cable support structure with handling of concerning cable and its proper fixing. (Without Pipe)
6
-
-
Laying, Stringing & Tensioning of ACSR Dog Conductor for making jumpers on riser.
50
-
-
Erection of Outdoor metering unit on erected pole.
1
-
-
Chopping of tree branches for clearing the route of 33/11 KV overhead line
10
-
-
Opening of 11 KV H.T. jumper for construction of line.
6
-
-
Making of 11 KV H.T. Jumper after construction of line.
6
-
-
Erection of Danger Board including related work.
12
-
-
Testing, commissioning and energisation of Newly constructed HT 11 KV network .
1
-
-
Preparation and submission of 03 Set Copy of complete layout drawing with GIS mapping as per actual cable routing, showing road crossing HDPE pipe/M.S. Pipe sleeving jointing locations, markers etc.
3
-
-