Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date4 Jan 2025
Closing Soon12 Feb 2025
Tender Amount₹ 2,03,15,00,000
AI Insights
Technical
Technical
Financial
Class Of Bidder
... View More
The class eligibility requirement to bid or participate in this tender includes classes "AA", "A", "B", "C", and "D", with a hierarchical structure where higher classes are eligible if a lower class is eligible. Specifically, if a "D" class contractor is eligible, then "AA", "A", "B", and "C" class contractors are also eligible; if a "C" class contractor is eligible, then "AA", "A", and "B" class contractors are also eligible; if a "B" class contractor is eligible, then "AA" and "A" class contractors are also eligible; and if an "A" class contractor is eligible, then "AA" class contractors are also eligible.
Bid Capacity
... View More
Bid Capacity = (2AN - B) Where, A = Maximum Value of Civil Engineering Works executed in any one year during the last Five (05) years (updated to Current Financial Year price level by enhancing @ simple rate of 7% per annum) taking into account the completed as well as works in progress. N = Number of years prescribed for completion of the works for which bids are invited. B = Value of existing commitments and ongoing works to be completed during the period of completion of the project for which tenders are invited. The Bidder should have the Assessed available Bid capacity as per this formula, which should be greater than the Estimated Value of the work.
Technical Capacity
... View More
The bidder is required to have prior work experience in executing Civil Engineering Projects. The specific requirements include: * General Construction Experience of executing Civil Engineering Projects in the last seven years.
* Successful experience of having successfully completed or substantially completed, during the last 07 years: + Three Civil Engineering Projects with a cost of executed works not less than 40% of the Estimated Cost of work. + Two Civil Engineering Projects with a cost of executed works not less than 50% of the Estimated Cost of work. + One Civil Engineering Project with a cost of executed works not less than 80% of the Estimated Cost of work.
* Specific Experience in: (a) Canal Lining: Experience of completion of combined canal cement concrete lining not less than 25% of estimated CC lining quantity. (b) Concrete Work: Experience of completion of combined CC/RCC work not less than 25% of estimated CC/RCC quantity. The bidder should also have an average annual turnover certificate in Civil engineering works of not less than 30% of the estimated value of work during the last Three Financial years. Mentioned values and percentages include:
- 40% of the Estimated Cost of work
- 50% of the Estimated Cost of work
- 80% of the Estimated Cost of work
- 25% of estimated CC lining quantity
- 25% of estimated CC/RCC quantity
- 30% of estimated value of work
- 7% per annum simple rate for updating the value of works to Current Financial Year price level
- 80 percent payments of the contract value for substantially completed works.
Costs
EMD
₹ 4,06,30,000Document Cost
₹ 7,354Tender Fee
Refer Documents
Summary
Restoration Of Banda Branch From Km. 0.000 To 40.225, Aliha Dy From Km. 0.000 To Km. 28.654
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_989952_4Tender No
03/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth Work in excavation For Lining Work in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m including cost of all labour, T&P etc.
217250
-
-
... More
Earth Work in excavation of foundation in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m from the foundation trenches including cost of all labour, T&P etc.
24435
-
-
... More
Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
4896
-
-
... More
Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.
207303
-
-
... More
Centering & shuttering for R.C.C. slabs, lintels & simple beams work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.
38325
-
-
... More
Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc.
862.5
-
-
... More
Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc.
5305
-
-
... More
Laying C.C A40, M-10 in foundation of all structures with cement, coarse sand of F.M. not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.
2683
-
-
... More
Laying C.C. A20, M-15 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.
27146
-
-
... More
Laying C.C. A20, M-20 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.
186
-
-
... More
Laying R.C.C. A20, M-25 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.
12938
-
-
... More
Dewatering with all cost of power/P.O.L, machines, pumps, well point system and operator with boring, assembling and dismantling of equipments etc. required for completion of work.
123200
-
-
... More
Supplying and laying rubber seal 225 mm width and 10 mm thickness at joints required for proper completion of work including cost of all materials, labour, T&P etc.
55
-
-
... More
Laying and fixing joint filler board 18mm. thick as specified locations in different structures required for proper completion of work including cost of all materials, labour, T&P etc.
260
-
-
... More
Two coats of bitumen painting with two layers of tarfelt again followed by two coats of bitumen painting before laying R.C.C. slab required for proper completion of work including cost of all materials, labour, T&P etc.
576
-
-
... More
Providing expansion joint in R.C.C. slab including placing and fixing of angle iron & MS Plate and filling with sealing compound as per drawing required for proper completion. of work, including cost of all materials, labour, T&P etc.
529
-
-
... More
S/F Drainage spout pipe 100 mm dia In RCC slab required for proper completion of work including cost of all materials, labour, T.& P etc.
6854
-
-
... More
Supplying and fixing 1200 mm dia NP-3 hume pipe required for proper completion of work including cost of all materials, labour, T&P etc.
1605
-
-
... More
Supplying and driving "Z" "type sheet piles of required size in different structures with cutting, welding including cost of all materials, labour, T&P etc.
34.7
-
-
... More
Brick on Edge Soling on approach road, diversion and ramp with preparation of subgrade and filling joints with local earth required for proper completion of work including cost of all materials, labour, T&P etc.
6525
-
-
... More
Dismantling Brick on Edge Soling on diversion including stacking required for proper completion of work with cost of all materials, labour, T&P etc.
6250
-
-
... More
Brick on Edge Soling on approach road/ ramp with preparation of subgrade and filling joints with local earth required for proper completion of work including cost of all materials, labour, T&P etc.
-
-
-
... More
For Making Apr. Road Taking 20% Old Brick From Dismelted Diversion
1250
-
-
... More
Net New Brick Soling Qty.
1350
-
-
... More
Brick work in 1:4 cement mortar with 1st Class Brick, coarse sand of F.M. not less than 2.0 required for proper completion of work including cost of all materials, labour, T&P etc.
90
-
-
... More
Providing & Laying R.C.R. 1 : 4 Cement Sand Mortar required for proper completion of work including cost of all materials, labour, T&P etc.
84
-
-
... More
Struck Raised Pointing on stone masonry in C.M. 1 : 2 required for proper completion of work including cost of all material T&P, labour etc.
523
-
-
... More
Struck Deep Pointing on Brick masonry in C.M. 1 : 2 required for proper completion of work including cost of all materials, labour, T&P etc.
301
-
-
... More
Laying stone grit 10-20 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.
198
-
-
... More
Supply & laying of stone grit 20-40 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.
201
-
-
... More
Providing & Laying Boulder Apron for Bed protection with stone boulder required for proper completion of work including cost of all materials, labour, T&P etc. Taken 80% Qty.of New Boulder And 20% Qty. from old dismelted Structure
1162
-
-
... More
Laying Boulder Apron for Bed protection with old stone boulder taken 20% Qty. from old dismelted structure required for proper completion of work including cost of all materials, labour, T&P etc.
300
-
-
... More
Preparation of Subgrade required for proper completion of work including cost of all materials, labour, T&P etc.
825790
-
-
... More
Filling/Laying Coarse sand as a filter material below lining required for proper completion of work including cost of all materials, labour, T&P etc.
111752
-
-
... More
Cement plaster 12.50 mm thick in 1:6 Cement Sand mortar required for proper completion of work including cost of all materials, labour, T&P etc.
754012
-
-
... More
Supplying/Laying two coat Bitumen painting on sleeper top required for proper completion of work including cost of all materials, labour, T&P etc.
114022
-
-
... More
Supply & laying of 200 micron L.D.P.E film over plaster work required for proper completion of work including cost of all materials, labour, T&P etc.
908369
-
-
... More
Providing & Laying 100 mm thick Cement Concrete Lining in A20, M-20 with 4.75 mm to 20 mm hard stone grit and coarse sand of F.M. not less than 2.0 by Paver Machine on Bed and Side Slope required for proper completion of work including cost of all materials, labour, T&P etc.
825790
-
-
... More
Making construction joint in lining & filling sealing compound in joint required for proper completion of work including cost of all materials, labour, T&P etc.
254478
-
-
... More
Dismentling of existing Grouted stone pitching/Lining including disposal of unserviceable material and stacking the serviceable material etc.
2438
-
-
... More
Demolishing Stone rubble masonry in cement mortar manually/ by mechanical means Including disposal of material within 50 metres lead as per direction of Engineer-in-charge
3193
-
-
... More
Demolishing R.C.C. work manually/ by mechanical means Including disposal of material within 50 metres lead as per direction of Engineer-in-charge
141
-
-
... More
12.50 mm thick Cement Plaster in Brick Work in C.M. 1 : 4 in coarse sand for Structure
68
-
-
... More
Earth Work in Dismantling of Diversion/Approach Road/Ramp required for proper completion of work including cost of all labour and T&P etc.
3750
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%