Irrigation Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date27 Feb 2025
Closing Date20 Mar 2025
Tender Amount₹ 44,03,39,999
AI Insights
Technical
Technical
Additional Eligibility
Bid Capacity
... View More
The bid capacity required in the given tender to bid having value can be calculated using the formula: Bid capacity = (A*N*M-B), where A = Maximum turnover in construction works executed in any one year during the last five financial years, N = Number of years prescribed for completion of the works for which bids are invited, M = 2.0, and B = Value, at the current price level, of existing commitments and ongoing works to be completed during the period of completion of the works for which bids are invited. Additionally, the bid capacity can also be determined based on the completion of similar works, with options including: - Three similar completed works costing not less than 40% of the estimated cost, - Two similar completed works costing not less than 50% of the estimated cost, - One similar completed work costing not less than 80% of the estimated cost. The Earnest Money Deposit (EMD) and a receipt of Rs. 01/- on a non-judicial stamp paper of Rs. 100/- are also required as part of the bidding process.
Technical Capacity
... View More
The required prior work experience for the bidder includes experience in similar works such as earthwork in constructing canal, excavation, filling, blasting, and constructing hydraulic structures. The bidder should have completed works within the last 7 years, with specific requirements as follows:
- Three similar completed works costing not less than 40% of the estimated cost, - Or two similar completed works costing not less than 50% of the estimated cost, - Or one similar completed work costing not less than 80% of the estimated cost. Additionally, the average annual turnover of the bidder should be at least 30% of the estimated cost of the work. The value of completed works shall be brought to current costing level adding 8% simple interest every year. The bid capacity will be calculated based on the bidder's maximum turnover in construction works executed in any one year during the last five financial years.
Costs
EMD
₹ 88,07,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Construction Of Balance Ew Of Rkc.from Km0.102 To Km24.025, From Km25.800 To Km26.700, Bs At Km1.81, Km.9.225, Km15.365, Box Culvert At Km6.1, Km14.800, Ps
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_1011802_1Tender No
01/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavating other rocks by blasting removing muck and stacking including all lift, lead upto 210 m, labour and T & P etc required for proper completion of work.
16482.85
-
-
... More
Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 1.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work .
322991.58
-
-
... More
Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 2.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work .
112435.2
-
-
... More
Earth filling with useful quantity of excvavated earth in making canal section including cost of mechanical compaction, labour and T&P etc required for proper completion of work.
120635.16
-
-
... More
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
2313.91
-
-
... More
Providing and laying of 600 mm dia hume pipe at crossing of SUKHARA minor at km 25.850 in R.K.C. Including RCC M-25 color joint 50 cm thick surrounding of pipe, 8 cm thick filling of sand in bottom of pipe , 60cm width , 3 mtr length and 1.5 m height of RRM wall 1:3 stone masonary with pointing at end and out of crossing of canal including cost of steel.shuttering, labour , T&P royalty etc for proper completion of work.
80
-
-
... More
Providing and laying boulder in rock toe in canal filling including cost of boulder, labour, T&P etc required for proper completion of work.
3960.4
-
-
... More
Providing and laying boulder in rock toe in canal filling including cost of boulder, labour, T&P etc required for proper completion of work.
1344.55
-
-
... More
Providing and laying of stone ballast 4.75 mm to 20 mm in rock toe in canal filling including cost of stone ballast, labour, T&P etc required for proper completion of work.
1234.75
-
-
... More
Providing and laying boulder stone ballast 25 to 75 mm in rock toe in canal filling including cost of stone ballast, labour, T&P etc required for proper completion of work.
1153.73
-
-
... More
Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work.
25549.95
-
-
... More
M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material but excluding cost of cement, labour, T&P, lead & lift, mixing & placing with batching plant and concrete pump, roylity and all taxes etc. for proper completion of work.
2112.62
-
-
... More
Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material but excluding cost of cement, labour, T&P, lead & lift, mixing & placing with batching plant and concrete pump, roylity and all taxes etc. but excluding cost of steel reinforcement for proper completion of work.
4243.77
-
-
... More
Centering and shuttering for RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work.
8064.05
-
-
... More
Centering and shuttering for CC work including cost of labour, material, T&P, staging etc. required for proper completion of work.
1391.45
-
-
... More
Cutting, bending, placing and binding of steel reinforcement including cost of all material but excluding cost of steel,labour, T&P, M.S. binding wire for proper completion of work.
229.7
-
-
... More
Providing and fixing of G.P. Sheet seal of 20 SWG 300mm. wide including cost of all materials, labour, T&P, cutting, bending, brazing, crimping etc. required for proper completion of work.
1450.9
-
-
... More
Providing and fixing of U type make from 22SWG 450mm. Wide copper seal including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work.
249.71
-
-
... More
Providing and fixing of diamond seal with 2No ISA size 75x75x10 iron flat 150x25x6@200mm. c/c for fixing anhle sheet of 16 SWG 510mm. MS sheet 1.63 mm wide 40-80 grade sealing compound including cost of brazing,cutting, bending, brazing, crimping etc. required for proper completion of work.
135.74
-
-
... More
Providing and fixing of PVC water stop seal 225 mm. wide including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work.
185.97
-
-
... More
Providing and fixing of PVC water stop seal 300 mm. wide including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work.
50
-
-
... More
Providing and fixing joint filler board (18mmThick in expansion joint including cost of all labour, material, T&P etc. .required brazing, crimping etc. for proper completion of work.
162.75
-
-
... More
Laying corse sand including cost of all materials, labours, T&P etc. required of all proper completion of work as per direction of Engineer-in-Charge.
618.81
-
-
... More
Supplying and laying of local sand in back filling including cost of all materials, labours, T&P etc. required for proper completion of work.
1445.6
-
-
... More
Suppling and laying hard stone dalla grit 4.75 mm. To 10mm size in filters and in gaps of C.C. block including costv of all material, , T&P lead etc. required for proper completion of work.
60.67
-
-
... More
Suppling and laying hard stone dalla grit 10 mm. To 20mm size in filters and in gaps of C.C. block including costv of all material, , T&P lead etc. required for proper completion of work.
65.97
-
-
... More
Supplying and Laying inverted coarse grain 20-40 mm in filter below C.C. block including cost of all materials, labours, T&P etc./Cum.
5.3
-
-
... More
Providing and fixing Tarfelt in expansion joint including cost of all labour materials and T&P etc. required for proper completion of work.
80.45
-
-
... More
Proviniding and fixing 100mm dia PVC pipe including cost of all material, labours, T&P, etc. required for proper completion of the work.
621.75
-
-
... More
Providing and fixing of drainage G.I.Pipe 50 mm dia including cost of labour materials and T&P etc. required for proper completion of work
303.2
-
-
... More
Random Rubble Masonery work in cement sand mortar (1:3) in wings wall and parapet wall including cost of all materials, labour, T&P etc required for proper completion of work.
1273.14
-
-
... More
Struck deep Pointing work for exposed surface of stone masonry in 1:2 CM with cement OPC-43 grade, sand etc. including cost of all material, labour and T&P etc required for proper completion of work.
596.92
-
-
... More
Earth work in filling back filling including all labours, T&P, taxes etc. for proper completion of the work.
9347.1
-
-
... More
Earth work In making drain diversion work to facilitate proposed work on site properly with manual compaction including all labours, T&P, taxes etc. for proper completion of the work.
1750
-
-
... More
Stone boulder for pitching in launching apron side pitching beyond L.A. bed pitching including cost of all materials labours T&P and taxes required for proper completion of the work.
891.9
-
-
... More
Dewatering of Foundation by hiring diesel pump 5 HP/Electric motor of same capacity including operator cost, cost of dewatering equipment and its accessories, labour etc.
4800
-
-
... More
Providing & Fixing 1200mm. Ø HUME PIPE including cost of all material, labour, T&P etc. required for proper completion of work.
120
-
-
... More
Providind & fixing NP-3, 1500 mm.Dia HUME Pipe including cost of all materials,carraige, labour,t&p etc required for proper completion of work.
25
-
-
... More
Febrication of Steel Gate and Hosting Arrangement including cost of all materials, labour, T&P, etc. required for proper completion of work.
59.9
-
-
... More
Poviding & Fixing of Angle Iron post (75xx75x10mm.) including cost of all material, labour and T&P etc. required for proper completion of work per Kg.
919.08
-
-
... More
Providing and Fixing, Febrication Erection Trash Rack including cost of all materials, labour, T&P, etc. required for proper completion of work.
1138.29
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%