Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Eprocure
Opening Date8 Mar 2021
Closing Date15 Mar 2021
Tender Amount₹ 3,14,12,754 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 6,72,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UPIDC_565030_1Bid Award Id
ViewTender No
03/SE/ICCM/2020-21Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in back filling including lead and lift, all cost of material, labour and T&P etc. Proper completion of the work.
134416
-
-
Earth work in foundation in M.K.R. & Kanker mixed soil and saturated soil with 30mm lead 1.50m lift.
33604
-
-
Earth work in excavation of hard rocks by blasting including cost of drilling explosivs and proper stacking
6721
-
-
Earth work in back filling including lead and lift, all cost of material, labour and T&P etc. Proper completion of the work.
2582
-
-
Earth work in foundation in M.K.R. & Kanker mixed soil and saturated soil with 30mm lead 1.50m lift.
2918
-
-
Excavation of foundatin in all type of strata excluding hard rock including disposal with all leads and lift & T&P etc. for proper completion of job as per direction of Engireer-in-Charge.
3508
-
-
C.C. in 1:3:6 in foundation with stone ballast including cartage all labor and material. Complete.
1596
-
-
C.C. in 1:2:4 in toe wall including all cost of all material, labour and T&P etc. Proper completion of the work.
532
-
-
R.C.C. in 1:1½:3 in slab with cost of stone grit all cost of material and labor T&P etc.
262
-
-
Reinforcement steel cutting bending binding with cost of all labor & material.
14.7
-
-
Centeriang & Shuttering for R.C.C. work cost of all labor and material complete.
2580
-
-
P/F P.V.C. pipe 100mm dia including all cost of material labor T&P. etc.
8
-
-
S/L stone boulder pitching including cost of material, carriage loading and unloading including cost of labour etc.
18
-
-
Laying of NP3 R.C.C. Pipe 1600mm dia
1000
-
-
Coarse Sand filling in foundation including supply of all material, labour and T&P etc. required for proper completion of work .
95
-
-
S/L stone boulder 40-63kg. (Min 23cm size) pitching in filter including cost of material, labor laying complete.
240
-
-
Random rubble stone Masonry in 1:4 cement -sand mortar including cost of all mateial, labour and T&P with all leads and lifts for proper completion of Job as per direction of Engineer-in-Charge.
94
-
-
Supply and Laying R.C.C. pipe 0.9 M Ø NP-3 with R.C.C. coller including all cost of all material, labour and T&P etc. Proper completion of the work.
100
-
-
First class brick work in 1:4 cement and coarse sand mortar including supply of all material, labour and T&P etc. required for proper completion of the work.
25
-
-
Raised or struck pointing in 1:2 cement sand mortar including cost of all material, labour T&P etc. for proper completion of Job as per direction of Engineer-in-charge.
799
-
-