Indian Oil Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Indian Oil Corporation Limited - IOCL Tender

Works
Civil And Construction
Excavation
Pipe Line Project
Eprocure
Opening Date21 Nov 2024
Closing Date5 Dec 2024
Tender Amount₹ 1,42,11,907.75 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
TCP Works Specifications
General Conditions of Contract
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of RCC Transition Pit with lid as per tender specifications and drawings

4

8356

9860.08

... More
Supply of 89 mm OD, Schedule 80, API 5L Grade-B/ ASTM A106 Gr.B MS pipe for Optical Fibre Cable conduit as per tender specifications

460

923

1089.14

... More
Supply of pit markers at RCC Transition pit/ Joint pit location as per tender specifications /drawings.

4

2992

3530.56

... More
Supply of OFC Jointing kits as per tender specifications for 48F

4

9082

10716.76

... More
Supply of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications

4

10286

12137.48

... More
Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications

4

1817

2144.06

... More
#Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other re sources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordanc e with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretatio n of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, S H, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required f or collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparatio n of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detail ed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, inc luding arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Compl ete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repai ring damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive te sting of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's repres entative(s) for examining radiographs, repair of defects in the.........Continued

-

-

-

... More
....in Continuation of previous.......welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approv ed make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sle eves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M /s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wher ever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-in stallation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-ins tallation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating surve y as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Tran sportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD inst allation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases.

-

-

-

... More
101 - 300 METERS (with OFC conduit)

-

-

-

... More
12.75" in Normal Soil

460

17201

20297.4

... More
Carrying out Calliper survey for ascertaining the internal geometry of the installed pipeline sections including mobilization/ demob ilization of pigging tools, tackles, consumables, accessories and personnel by contractor at work site including magnetic pig, elect ronic geometry pig, preparation and cleaning of the pipeline sections by running series of foam pigs for cleaning the line from debr is, water & making it dry for launching calliper pigs, running of magnetic pig for cleaning of ferrous residue, launching and receiv ing the electronic & standard calliper pigs, data retrieval, interpretation of data and submission of reports in the form acceptable to the Owner, rectification of defects observed from calliper survey (if HDD is executed by the same contractor), including supply of all labour, materials, equipment & instruments, calliper pigs, fabrication of launching & receiving barrels, all complete as per specifications and directions of Site Engineer / Engineer-in-Charge.

-

-

-

... More
DIAMETER

-

-

-

... More
12.75"

2

305295

360248.71

... More
Fixing of temporary header / facility at both ends of the old/new pipeline section, inserting the bi-di pig and carrying out produc t evacuation by nitrogen purging, as per specification and direction of Engineer-in-Charge including supply of all labour, materials , equipments, instruments, pigs, barrels etc. Complete in all respects.

-

-

-

... More
DIAMETER

-

-

-

... More
12.75"

660

772

911.55

... More
Carrying out tieing-in and hook-up of the installed HDD sections including laying of transition piping upto 12 m for hook-up with ex isting Mainline on either side of HDD crossing including all excavation/ trenching in all kinds of soil including rock,transportatio n of coated pipe from owner's stackyard, cutting of pipe, pre-testing of pipe sections before hook-up, making field bends out of pre -tested pipes (pipes shall be supplied by Owner) to match the site requirement, welding, carrying out 100% radiography, field joint coating, holiday detection, repair of damaged coating, backfilling and making through the pipeline etc. complete in all respects as per specifications and directions of Engineer-in-Charge.

-

-

-

... More
DIAMETER

-

-

-

... More
12.75"

2

214139

252684.57

... More
Retrieval of cross country mild steel pipeline section by excavation up to bottom level of pipe which is normally at 1.5 to 2 m dept h, by cutting at every 10 to 12 meters by suitable safe method as approved by EIC / Site Engineer (pipe to be cut near to old girth weld of pipe and at some places cutting may be required at lesser length as per site requirement), removal of pipes from trench, loa ding, unloading and transportation to owner's installation with all labours, vehicles, tools and tackles, equipment as directed by E IC / Site Engineer including backfilling of excavated trench with excavated earth along with additional appropriate quantity of soil (to be arranged by the contractor) after removal of pipe, compacting the backfilled earth and restoring to original level and condi tion.

-

-

-

... More
DIAMETER

-

-

-

... More
12.75"

660

1163

1373.41

... More
Excavation up to bottom level of pipe which is normally at 1.5 to 2 m depth for lengths upto 30m, removing the coating, creating acc ess for carrying out hot-tapping operation, applying the coating again after completion of Hot-Tapping Works and backfilling the exc avated trench with excavated earth along with additional appropriate quantity of soil (to be arranged by the contractor), compacting the backfilled earth and restoring to original level and condition with all labours,materials, tools and tackles, equipments etc. a s directed by EIC / Site Engineer

-

-

-

... More
DIAMETER

-

-

-

... More
12.75"

2

271263

320091.43

... More
Collecting any oil and/or oil water mix accumulated in the pit after evacuation of product from the old pipeline section & transport ing the same in oil tankers to the nearest IOCL installation without any spillage, complete in all respect & as per the directions o f EIC / Site Engineer.

2

226891

267731.39

... More
#Laying of Owner-supplied pre-coated mild steel line pipes, including arranging all additional land/construction corridor, beyond Ow ner's ROW, required for Contractor's storage, fabrication, access for construction site, movement of construction equipment etc., re ceiving and taking over Owner-supplied materials, handling, transportation etc. from Owner's issue point to work site, stringing alo ng Right of Way (ROW)/ pipeline corridor, providing labour, equipment and supply of other inputs & materials/ consumables necessary to perform and complete the work in all respects in accordance with the contract including, but not limited to, the following works: #Taking delivery and transportation of Owner-supplied coated pipes to the work site from designated Stockpile location, inspection o f the coated pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area required thereo f till the pipes are installed in permanent position;#Clearing and grading of ROW/ pipeline corridor, cutting of trees, vegetation e tc. including keeping record of trees cut, including de-watering etc.;#Stringing of pipes along ROW including providing straw bags/ soft padding below pipe;#Trenching to all depths to maintain clear earth cover as per specification and to fit minimum bend radius, by excavation in all kinds of terrain & soil, including stripping top soil to a depth of 30cm to the full anticipated width of the d itch and storing this material separately along the ROW to allow re-depositing of the same on top of the backfilled ditch (in cultiv able and other areas specially designated by Owner);#Carrying out repair of pipe & coating defects for defects occurring after "taki ng over" of pipes from Owner, replacement in the case of non-repairable defects and repairing damages to pipe coating including defe cts/ damages occurring during transportation & handling;#Carrying out 100% radiographic inspection (by X-Ray) of all field weld join ts as per Specifications and Special Conditions of Contract (SCC) and destructive testing of one weld joint as per specification and direction of Site Engineer, including providing Crawler type Automatic X-Ray machine and/ or external X-Ray machine and all other r equisite equipment, labour, supervision, materials, approved films, approved consumables, all facilities and personnel to process, d evelop, examine and interpret radiographs (by qualified and experienced Radiography Inspector), providing all facilities to Owner's representative(s) for examining radiographs and other tests as required, carrying out repair of weld-joints found defective, carryin g out re-radiography and other tests as required on repaired joints, etc.;#Carrying out coating of all field weld joints, by specifi ed coating insulators, including supply of approved joint coating materials, providing all equipment, materials and consumables nece ssary to carry out the job as per manufacturer's recommendation;#Carrying out holiday detection at specified voltage level correspon ding .......Continued

-

-

-

... More
.....in Continuation of previous.... to coating type as per specifications, and repair of coating, if any;#Laying pipeline by open- cut method at crossings viz., cart-track, village road, metalled/ un-metalled roads, minor water courses (MWC) and restoration of th e site to original condition;#Lowering the pipeline in trench, tieing-in, backfilling with excavated earth and/or other suitable soi l (top soil stored separately during trenching shall be backfilled on top of the ditch) as directed by Site-Engineer;#Carrying out a ir cleaning, gauge pigging and hydrostatic testing (to specified pressure) of the complete pipeline including providing pre-testing of designated sections as approved by Engineer-in-Charge, providing all equipment, pumps, fittings, instruments, dead weight tester etc. and services, supervision, labour, consumables, testing of water, supply & injection of corrosion inhibitor, locating leaks, if any, and rectification of defects attributable to Contractor, re-testing after rectification etc. and cleaning the pipeline section after successful hydrotesting;#All tie-ins, including tieing-in with HDD section;#Obtaining work permits/ NOC from various authorit ies, having jurisdiction, before execution of work and complying with all stipulations/ conditions/ recommendation of the authoritie s;#Final clean-up and restoration of ROW/ construction corridor, field bunds etc. and obtaining NOC from statutory authorities (as r equired), and obtaining NOC from respective landowners in respect of final restoration of their land etc., disposal of debris and re turning surplus material to designated disposal areas/ storage location, as directed by Engineer-in-Charge, restoration of land, fac ilities and boundary wall etc. for facilities dismantled/ damaged by Contractor during construction;#Preparation of As-Built drawing s, Pipe book and other records as per specifications etc.;#Supply of all materials (other than those specifically undertaken to be s upplied by the Owner under the contract);#All other acts, deeds, matters and things necessary to make the pipeline ready for commiss ioning and completing the works in all respects as per drawings, specifications and instructions of Site Engineer/ Engineer-in-Charg e. Note: Liability of Owner to provide ROW to contractor shall be limited to the extent between the hook-up points with existing pipeli ne including for laying transition pipeline section. Additional space required by contractor beyond the above limits, including for access to site, shall be arranged by contractor at his own cost & initiative. Payment under this item shall be made only for the tra nsition pipe laid more than 12 m length on both sides. Transition Pipe laying upto 12 m length on both sides is included in the SOR item for Tie-In and Hook up.

-

-

-

... More
DIAMETER

-

-

-

... More
12.75"

200

5356

6320.15

... More
Taking delivery and transportation of bare pipes from owner's stockpile, transportation, unloading the pipes at manufacturer's work s and fabrication of Long Radius (R=6D) Hot pulled induction bends having tangent length of approximately 1000m at both ends as per specification and delivery of hot pulled bends to site including visual examination, manual U.T. on the entire weld seam, bevelling of ends as per API 5L, supply of all materials, consumables, labour etc. as per specifications and direction of Site Engineer / Engi neer-in-Charge.

-

-

-

... More
12.75"

4

163836

193327.48

... More
Supply of all materials necessary for fabrication and installation of kilometre posts, direction markers and warning signs at the lo cations as per specifications, excavating & grouting in cement concrete 1:3:6, and all other works necessary for fabrication & insta llation of the markers including cleaning, priming & applying two coats of coal tar based epoxy paint on underground portions, suppl y and application of one coat of primer and two coats of epoxy paint of approved colour and quality on overground portion, stencil l etter cutting for number, direction, chainage etc. and restoration of site to original condition and all other acts, deeds, matters and things and work, labour, inputs and materials/ consumables necessary to perform and complete the work in all respects as per app roved drawing & specifications and as per direction of Site Engineer / Engineer-in-Charge.

-

-

-

... More
KILOMETER POST

4

7969

9404.39

... More
DIRECTION MARKER

4

7742

9135.69

... More
WARNING SIGN

4

9180

10833.37

... More
Providing and installing RCC (1:1.5:3) boundary pillars as per drawings on both edges of the ROW at 250 metres interval and at every turning point and/or as directed, including supply of all materials necessary for the fabrication of the pillars, casting and inscr ibing the pillars, excavation of earth, fixing the pillars & backfilling, applying two coats of oil paint over one coat of cement ba sed primer on exposed surface and work, labour, inputs & materials/ consumables necessary to perform and complete the work in all re spect under the contract and as per directions of Site Engineer.

8

1728

2039.65

... More
Taking delivery from Owner's Store, loading, transportation and unloading of Owner supplied 1 drum (4 KM) unarmoured Optical fibre c able (OFC) to respective HDD crossing locations, pre laying testing of the cable drum for each fibre and maintaining the OTDR traces .

1

12914

15238.52

... More
Blowing of OFC through laid HDPE, post installation testing of OFC for each fibre for drum laid & maintaining OTDR traces as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

660

40

47.2

... More
Installation of RCC Transition pit/ Joint pit at HDD crossings as per specifications, drawings and directions of Engineer-in-charge / Site Engineer

4

3504

4134.72

... More
Installation of pit marker at RCC Transition pit/ Joint pit location as per drawings, specifications and direction of Engineer-in-ch arge/ Site Engineer.

4

2064

2435.52

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable str aps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers , end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspectio n of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after la ying as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engine er and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportation , loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end sealing plugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-char ge/ Site Engineer

0.2

8868

10464.24

... More
Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer

4

5520

6513.6

... More
Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Elec tronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer.

4

451

532.18

... More
Installation of OFC Joint pit markers at every joint location as per specifications, drawings and directions of Engineer-in-charge/ Site Engineer

4

673

794.14

... More
Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications, drawings and directions of Engineer-i n-charge/ Site Engineer.

4

1593

1879.74

... More
Magnesium Anode : Supply, Installation , testing and commisioning of Magnesium anode (minimum 5 Kg each) including its tail cable o f size of 1c x 10 sq.mm. XLPE/ PVC insulated stranded copper cable of total length 10 meter including PVC cap, special back-fill mat erial ( filled in cotton sack) with sealing compound complete in all respect including its excavations, back filling etc. as per spe cifications and drawings. The work complete in all respect shall include supply of all labour , tools etc. and shall be carried out as per the directions of the EIC/ Site Engineer and as per AFC drawings.

4

6716

7925.93

... More
Type A (With Ingress Protection IP:55)

4

15958

18831.21

... More
48 Fibre Single Mode Composite Metal Fr

660

79

94.26

... More
Mobilization of Equipments, Hot Tapping/stopple machine, Cold cutting machine, sandwich valves, welding machine & consumables, cutte r housing, stopple housing, stopple head, stopple cutter, pilot drill, cutter holder, Lock O-Ring plugs, LOR plug holder, required s killed, semiskilled, unskilled manpower, including Supply and Delivery of Line stopple fittings, Line Stopple Plug with scarfed n ipple/Lock O-Ring plugs, Hot Tap bypass fitting, Hot Tap Plug with Scarfed Nipple/Lock O-Ring, Buna N Sealing Elements, 2" pressu re equalization fittings, Lock O-Ring plugs, Sealing elements, guide bar, Flanges, other tools, fixtures of 600# for 4 nos. hot tap/ stoppling, creation & pre-testing of temporary bypass line at both ends with double-double stopple and by-pass and hook-up with newl y laid HDD line at both ends, with all accessories, fittings, flanges, gaskets, fasteners, blind flanges etc. required to complete t he job, in line with enclosed tender specification and drawing, cleaning and removal of the coating if required , installation of th e cutter housing, carrying out Hot tapping, stoppling, cutting, welding, radiography of weld joints etc. Hot tapping and insertion o f the stopple plug and blocking flow in the pipeline section for required duration including operation of sandwich valve etc. to fac ilitate flushing/purging operation, installation of LOR plug, supply of N2 for testing, air bleeding and filling the section with p roduct and welding of end cap/blinds. Clearing the area, machines, tools & tackles etc., completing the work in all respect with al l materials, consumables, tools, tackles, labour etc. to restore normal operation in line with specification of hot tapping given in Work specifications (IOCL-BKPL-MECH-HOT-TAPPING-WORKSPEC)& as per tender drawings under close supervision and as per the direction of the Site-Engineer / Engineer-in-charge.

2

10706252

12633378.02



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.