Indian Oil Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Indian Oil Corporation Limited - IOCL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date19 Oct 2023
Closing Date8 Nov 2023
Tender AmountRefer Documents
Costs
EMD
₹ 1,97,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PLHO_171884_7Bid Award Id
ViewTender No
PLCGD/WORKS/23/12Tender Authority
Indian Oil Corporation Limited ViewPurchaser Address
-Website
http://https://www.iocl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Bidders_help_Document_for_Preferencial_ Bidding_20230207_v1
Special_Instructions_to_the_Bidders_20230207_version_1a
BOQ Items
... More
Soil Chemical analysis as per specification
5
163879
-
... More
Design
-
-
-
... More
Design, Detailed Engineering for Permanent Cathodic Protection system as per the specification
1
167305
-
... More
Transformer Rectifier Unit
TRU
-
-
-
... More
Supply, Installation,Testing & Commissioning of the below rated dual input (230 V AC & 48 V DC) type Cathodic Protection Smart Transformer Rectifier Unit with built in GSM Modem, RTU and display unit of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation: Transformer Rectifier Unit - 25V/25A , single phase or three phase, Air cooled, Indoor type with remote monitoring through Pipeline’s SCADA facility.
1
497554
-
... More
Supply, Installation,Testing & Commissioning of the below rated input (230 V AC) type Cathodic Protection Smart Transformer Rectifier Unit with built in GSM Modem, RTU and display unit of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation: Transformer Rectifier Unit - 25V/25A , single phase or three phase, Air cooled, Indoor type with remote monitoring through Pipeline’s SCADA facility.
4
1774665
-
... More
Anode Ground Bed-Deep Well Type AGB
-
-
-
... More
Supply and Installation of Anode Ground Bed including terminating the cables in the AJB box with cable lugs, sealing material, laying of cable, testing & commissioning of Anode Ground Bed with chain link fencing,etc. all complete with required material, excavation, backfilling etc. as per specification and directions of Site Engineer / Engineer-in—Charge.
-
-
-
... More
Deep well type anodeground bed using MMO tubular anode (16 mm dia. x 1000mm long) of each 5 A , minimum 8 to 10 Nos , with individual anode tail cables of 1c x 10 sq mm KYNAR/HMWPE, unarmoured of minimum length to reach the anode junction box without any splicing , including calcined petroleum coke breeze of bulk density 900 kg/ m3. Depth of the Deep well shall be min 50mtr or as per design and diameter of the MS casing pipe shall be min 250 mm. The anode shall be supplied complete with vent pipe and HDPE pipe shield for inactive length .
4
5902925
-
... More
Horizontal Shallow type anodeground bed using MMO tubular anode (16 mm dia. x 1000mm long) of each 5 A , minimum 8 to 10 Nos , with individual anode tail cables of 1c x 10 sq mm KYNAR/HMWPE, unarmoured of minimum length to reach the anode junction box without any splicing , including calcined petroleum coke breeze of bulk density 900 kg/ m3. Depth of the Horizontal Shallowshall be min 1-6 mtr or as per design and - Individual MMO anodes shall be supplied with sheet steel canisters prepacked with calcined petroleum coke breeze.
1
1034925
-
... More
Junction Boxes
-
-
-
... More
Supply,Installation & Testing of Junction Boxes of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation
-
-
-
... More
Anode Junction Box (weatherproof, IP-55)
AJB
5
221710
-
... More
Cathode Junction box (weatherproof, IP-55)
CJB
5
221710
-
... More
Reference Electrode Junction Box-REJB (weatherproof, IP-55)
11
263291
-
... More
Test Station (TS) / Test Lead Point (TLP)
-
-
-
... More
Supply, Installation & Testing of Test Station (TS) / Test Lead Point (TLP) of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation
-
-
-
... More
Type H - for HT Line Crossing and SV, this TLP shall be vandal proof type and the size should be suitable to install solid state dc decoupling device(SSD) in it. There are two cables one of 1c x 6 sq mm and other of 1c x 25 sq mm from the pipeline into the TLP, one end of the 25 sq mm cable is connected to DC decoupling device and to the other connection of the device Zinc grounding Cell with 1c x 25 sq mm cable are connected for grounding the AC current, pin brazing connection encapsulation kit etc. Note: This type of TLP is already available at all HT line crossing location. The same shall be used for AC interference mitigation. In case the same is not in usable condition, these new H type TLP shall be installed.
1
61778
-
... More
Type A for Potential Measurement with minimum two cables of 1Cx06 Sq.mm Cu XLPE armoured Potential measurement cables, pin brazing connection encapsulation kit etc., Note: Possibility of using installed similar type TLP at the time of TCP will be explored first. If the condition of the existing similar type TLP are not in usable condition, new one shall be installed.
4
73372
-
... More
Type A1 for Current Measurement with minimum four cables of 1Cx06 Sq.mm (2 nos) & 1Cx10 Sq.mm (2 nos) Cu XLPE armoured Current and Potential measurement cables, pin brazing connection encapsulation kit etc., Note: Possibility of using installed similar type TLP at the time of TCP will be explored first. If the condition of the existing similar type TLP are not in usable condition, new one shall be installed.
1
44934
-
... More
Type B for Galvanic Anode to Pipe Connection with minimum two cables of 1Cx06 Sq.mm & 1Cx10 Sq.mm Cu XLPE Potential measurement cable & 1Cx10 Sq.mm Cu XLPE armoured galvanic anode connection, pin brazing connection encapsulation kit etc. Note: Possibility of using installed similar type TLP at the time of TCP will be explored first. If the condition of the existing similar type TLP are not in usable condition, new one shall be installed.
1
44168
-
... More
Type F for Foreign Pipeline Crossing with minimum four cables including two cables of 1Cx6 Sq.mm Potential measurement cable & two cables of 1Cx25 Sq.mm armoured for bonding, pin brazing connection encapsulation kit etc., Note: Possibility of using installed similar type TLP at the time of TCP will be explored first. If the condition of the existing similar type TLP are not in usable condition, new one shall be installed.
2
54288
-
... More
Type E for insulating joint with minimum four cables including two cables of 1Cx06 Sq.mm Cu XLPE armoured Potential measurement cables & two cables of 1Cx25 Sq.mm Cu XLPE armoured galvanic anode connection, pin brazing connection encapsulation kit etc., Note: Possibility of using installed similar type TLP at the time of TCP will be explored first. If the condition of the existing similar type TLP are not in usable condition, new one shall be installed.
2
108097
-
... More
Type D TLP with 1 no. 20 kg Mg anode. Note: Possibility of using installed similar type TLP at the time of TCP will be explored first. If the condition of the existing similar type TLP are not in usable condition, new one shall be installed. However, Mg anodes shall be installed everywhere. Note: Possibility of using installed similar type TLP at the time of TCP will be explored first. If the condition of the existing similar type TLP are not in usable condition, new one shall be installed. However, Mg anodes shall be installed everywhere.
-
-
-
... More
Type D for Cased Crossing with minimum four cables including two cables of 1Cx06 Sq.mm Cu XLPE Potential measurement cable & two cables of 1Cx10 Sq.mm Cu XLPE armoured anode connection, pin brazing connection encapsulation kit etc.
2
41908
-
... More
Supply & Installation of pre-packed Mg (Zn??) Anode (20.0 Kg) with one cable including 1Cx10 Sq.mm Unarmoured cable (with sufficient length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. complete in all respects as per direction of Engineer-In-Charge.
2
61767
-
... More
Polarization Coupon
-
-
-
... More
Supply Installation,Testing of Polarization Coupons complete with reed switch and permanent reference cell of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation
-
-
-
... More
Polarization Coupons with two cables of 1c x 6 sq mm and 1c x 10 sq mm XLPE/PVC unarmoured of suitable length such as to reach Test Station connected to the coupon
5
43810
-
... More
Cables
-
-
-
... More
Supply, Laying, Installation,Testing & Commissioning of Cables of approved make with all its accessories to ensure trouble free operation Laying of anode header / cathode header / monitoring/ reference cell cables at a minimum depth of l meter and connection to the CP unit / pipeline / half cell etc. The work includes excavation, installation, supply of all required materials such as sealing materials, lugs, PVC sleeve, repair materials etc., and carrying out all works such as exposing pipe, coating repair, cad welding / pin brazing, backfilling etc.,; in all types of strata and soil (including rock) by making the trench, back filling the trench,cable terminations, work complete in all respects including cost of all labour, material, tools etc. as per specification and instruction of site Engineer / Engineer—In—Charge and approved drawings. PCP - Cables shall be annealed high conductivity, stranded copper conductor, 650/1100V grade
-
-
-
... More
1 core x 6 mm2 -Reference electrode, monitoring cable- XLPE insulated,PVC sheathed, un-armoured
550
144295
-
... More
1 core x 35 mm2 -Anode & Cathode header Cable- XLPE insulated and PVC sheathed, armoured
( From TRU to AJB/CJB)
1000
677370
-
... More
1 core x 25 mm2 - Cathode Cable- XLPE insulated and PVC sheathed armoured ( From pipeline to CJB)
1000
491639
-
... More
3C X 25mm2 TR unit AC incomer cable-XLPE insulated and PVC sheathed, armoured
500
365998
-
... More
2C x 6 mm2 - Reference electrode and monitoring cable ,XLPE insulated and PVC sheathed, armoured
(From REJB to TRU)
500
232698
-
... More
1 core x 25 mm2 - Bonding, Earthing, HT line, etc- XLPE insulated, PVC sheathed, un-armoured
100
51255
-
... More
Permanent Reference Electrode
-
-
-
... More
Supply and Installation of Permanent Reference Electrodes of approved make with all its accessories to ensure trouble free operation Installation of permanent half cells including connecting the cable in the Test Station etc. with cable lugs, sealing material, laying of cable, testing& commissioning of cell etc. all complete with required material, excavation, backfilling etc. as per specifications, recommendation of cell supplier and directions of Site Engineer / Engineer-in-Charge.
-
-
-
... More
Prepackaged Cu/CuSO4 electrode with chemical backfill and 1c x 6 mm2 XLPE/PVC cable, unarmoured of suitable length upto reference electrode junction box without any splicing
31
618512
-
... More
Thermit welding or Pin Brazing
-
-
-
... More
Supply & Installation of Thermit welding or Pin Brazing of approved make with all its accessories to ensure trouble free operation Installation of Thermit welding or Pin Brazing including connecting the cable to the P/L for all sizes
(Upto 1C x 35mm2) etc. with cable lugs, sealing material, laying of cable, testing& commissioning, etc. all complete with required material, excavation, backfilling etc. as per specifications, recommendation of cell supplier and directions of Site Engineer / Engineer-in-Charge.
5
48481
-
... More
Computerized Test Station with Readers
-
-
-
... More
Supply, Installation,Testing & Commissioning of Computerized Test Station of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation Computerized Test Station comprising of GSM based digital data logger inside Test station unit along with reference cell.
5
515606
-
... More
Supply of Computerized Test Station Reader of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation Computerized Test Station Reader
5
277487
-
... More
AC/HVDC INTERFERENCE STUDY
-
-
-
... More
AC/HVDC Interference study and preparation of bill of material for mitigation shall be carried out by a specialist agency having relevant experience of conducting/ designing proven mitigation systems by computer modelling. The AC interference study shall have to be completed within 4 months of the award of the contract to facilitate the implementation during construction phase. 3 months will be utilized for data collection and physical survey and rest 1 month shall be used for data interpretation and proposition of mitigation measures in software.The scope is as per tender specification. The work shall be completed in all respects including survey recommending mitigation measures & post mitigation survey. The work includes all tools, tackles,consumables etc. all complete, required for survey / test as deemed necessary and as per the directions of the site engineer /Engineer-in-Charge.The scope includes conducting AC/DC data logging at installed TLP's with AC corrosion coupons/Polarisation coupons for 24 hours.
81.5
1195441
-
... More
AC INTERFERENCE MITIGATION
-
-
-
... More
Solid State Decoupler
-
-
-
... More
Supply, Installation &Testing of Solid State Diode Decoupling Device of approved make including required length of cable as per specifications for protection of MOVs and at HT line crossing locations Installation of solid state decoupling device as per specifications including terminating the cables in the Test Station box with cable lugs, sealing material, laying of cable, testing & commissioning of Zinc anodes etc.all complete with required material, excavation, backfilling etc. as per specification and directions of Site Engineer/ Engineer—in-Charge.
-
-
-
... More
5KA Solid state decoupler of suitable rating with threshold voltage of +2V / -2V Note: SSD is already available at all HT line crossing location. The same shall be used for AC interference mitigation. In case the same is not in usable condition, these new SSD's shall be installed.
4
355460
-
... More
Grounding Cell
-
-
-
... More
Supply and installation of Zn Grounding cells (with prepackaged backfill material)including required length of cable (minimum 10 m) of approved make & asper specification in accordance with dwg no. Installation of grounding cells including terminating the cables in theTLP box with cable lugs, sealing material, laying of cable, testing &commissioning of grounding cell etc. all complete with required material, excavation, backfilling etc. as per specification and directions of Site Engineer / Engineer-in—Charge.
-
-
-
... More
Pre-packaged Zinc grounding cell- 20 kg with 1c x 25 sq mm XLPE/PVC unarmoured cable terminated at TLP Note: Grounding Cell is already available at all HT line crossing location. The same shall be used for AC interference mitigation. In case the same is not in usable condition, these new Grounding Cell's shall be installed.
4
121469
-
... More
Zinc ribbon anode
250
402576
-
... More
AC Corrosion Coupons
-
-
-
... More
Supply and Installation of AC Corrosion Coupons of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation
-
-
-
... More
AC corrosion coupons with 1c x 6 sq mm XLPE/PVC unarmoured of suitable length such as to reach test station
4
30578
-
... More
Electrical Resistance (E.R.) Probes with Readers
-
-
-
... More
Supply, Installation & Testing of E.R. Probes of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation E.R. Probe for external corrosion measurement of the pipeline
1
76325
-
... More
Supply of E.R. Probe Reader of approved make, complete in all respects as given in the specification and directions of Site Engineer/ Engineer—in-Charge with all its accessories to ensure trouble free operation E.R. Probe Reader
2
850486
-
... More
Spares
-
-
-
... More
Instruments, tools and tackles necessary for proper operation and maintenance of complete cathodic protection system and associated equipment
1
272591
-
... More
Spares ( all components of each type & rating ) for TR units necessary for proper operation and maintenance of TR units
1
223969
-
... More
Testing and Commissioning of permanent cathodic protection system
1
101116
-
... More
Post Commissioning Surveys
-
-
-
... More
Foreign Line Interference Study/Survey and Mitigation Conducting Mutual interference survey among the new and existing pipelines / facilities(foreign) by taking PSP survey of all the pipelines as per approved procedure to determine level of interference at different places along the pipeline and at point of crossing in common ROW including identifying points and providing the data/ recordin graphical form and carrying out all necessary work for mitigating the interference observed among the pipelines , including retesting the same to ensure efficacy of the remedial measures undertaken. The contractor shall submit a full final report with detailed PSP readings at all TLPsalong with graphs in six sets.The item should be complete in all respect including survey, work for mitigating the interference and post mitigating survey as per specifications/directions of site engineer /Engineer—in—Charge.
1
9299
-
... More
Close Interval Potential Logging (CIPL) survey Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost ofall expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc.,required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required along with suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner' scomments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer—in-Charge.
81.5
391123
-
... More
Current Attenuation test (CAT) survey of the entire pipeline to check the condition of the coating and classify the health of the coating, identify sections with high decibel loss which could be due to coating faults or shorted casings. Note : Will be done at interval of 50 mt
81.5
624912
-
... More
Direct current Voltage gradient (DCVG) at locations identified by CIPL survey to locate holidays, size the holidays and determine whether the holidays are anodic or cathodic. Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required along with suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colourprint and complete in all respects as per directions of Site Engineer /Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.
16.3
90861
-
... More
Coating conductance survey at every 10 km at Type A1 TLP and HDD locations Conducting " Coating-Resistance Survey" for calculation of effective coating resistance of the pipeline in ohms-sq.m. along the entire pipeline and plotting on SEMILOG or X-Y GRAPH & submitting the reportin graphical form as well as soft copy as per Specification / approved procedure and directions of Site Engineer / Engineer-in-Charge
9
17501
-
... More
Bonding ( Alongwith Test Stations )
-
-
-
... More
Bonding shall be done at IJ locations as per requirement
2
65540
-
... More
Survey & Identification of Land for AGB Applicable only for Horizontal Shallow type anodeground bed
-
-
-
... More
Survey & Identification of Land for AGB Applicable if Land is not available within the existing CGS/CNG Stations ( Includes liasoning with the Land Owner , concerned govt authority , feasibility wrt TRU installed in the CGS/OLS location , Pipeline ) (Shall not include - soil resistivity survey as its covered in the beginning , Land Acqusition shall be done only after liasioning with the Owner , checking the feasabilty wrt TRU installed/tobe installed in the CGS/OLS location , Pipeline )
1
71460
-
... More
*Vendor to note that the scope shall also include Land acquisition of Anode Bed including anode header cable route land upto CP Station in the name of IOCL by bidder. The reimbursement of Land acquisition shall be made by IOCL on submission of original documents. -- Applicable if Land is not available within the existing CGS/CNG Stations
-
-
-
... More
Supply & Installation of Spark Gap Arrester for Insulating Joint complete in all respects as per direction of Engineer-In-Charge including the cost of all labour, materials, tools and tackles etc.
1
23520
-
... More
Monitoring
-
-
-
... More
Supply and commissioning of CP monitoring system including measuring, recording and submitting the cathodic protection readings along the entire pipeline by repeated adjustments of the settings of the CP TRU units etc as per specifications for achieving full/maximum protection of all the stretches as per the criteria of protection mentioned in the specifications. Measuring the relevant readings at the cathodic protection stations and "pipe to soil potential" readings at all the test lead locations along the pipeline including the CP station parameters like current(AC/DC), voltage(AC/DC), circuit resistance, battery voltage/current etc.,preparing and submitting pipe to soil potential profile, graphs and other data pertaining to the cathodic protection of the pipeline, job complete in all respects as perspeclfication and instructions of Site Engineer/Engineer-in-Charge, including cost of all labour, instruments and services rendered. Note : CP monitoring system including measuring, recording and submitting the cathodic protection readings along the entire pipeline by repeated adjustments of the settings of the CP TRU units etc as per specifications for achieving full/maximum protection of all the stretches as per the criteria of protection mentioned in the specifications.shall be done quaterly/as per instructions of the EIC
4
283686
-
... More
Final Acceptance/Handover
-
-
-
... More
Final Commissioning of CP system Final Commissioning of the impressed current cathodic protection system for the mainline for achieving full protection as per protection criteria as mentioned in the specifications through repeated adjustments of the CP units after installation of galvanic anodes for hot spot protection and mitigation of AC/ DC interference, if any and submission of the resultant data to the owner and testing, measuring, recording and submitting all these data once again after the lapse of a period as per specifications / directions of the Site engineer /Engineer-in-Charge, including the cost of all labour tools and materials as required, complete in all respect.
1
81155
-
... More
Supply and Installation of Cu/CuSo4 portable reference cell
2
12836
-
... More
p014508
-
-
-