Indian Oil Adani Gas Private Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Indian Oil Adani Gas Private Limited - IOAGPL Tender
Eprocure
Opening Date26 Sep 2024
Closing Date3 Oct 2024
Tender AmountRefer Documents
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Annual Rate Contract For Lmc Installtion And Associated Works At Prayagraj Ga
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_AGPL_209439_1Tender No
IOAGPL/PE/OPEN/2024-25/45Tender Authority
Indian Oil Adani Gas Private Limited ViewPurchaser Address
-Website
http://https://ioagpl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Preparation and approval of schedules, execution procedures, sketches
-
-
-
... More
Finalization of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. A tentative sketch shall be prepared and shall be signed by customer, contractor & SIC/ TPIA
-
-
-
... More
Making temporary but stable platforms/ scaffolding / rope ladders and all other safety devices
-
-
-
... More
Installation of Powder Coated GI Pipes & Fittings, Isolation & Appliance Valves including NPT/BSPT threading, Anaconda, Suraksha Hose etc.. painting as specified including installation of regulators and meters.
-
-
-
... More
Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through wall /tiles / wood/ marble/ Granite etc jointing of PE to aboveground service GI pipes, testing, purging and commissioning of the complete installation.
-
-
-
... More
Touchup/ Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original by cleaning/ touching of corresponding paint to original as per instructions & to satisfaction of the owner. Preparation of laying records, meter reading etc. Reconciliation of free issue material.
-
-
-
... More
Drilling of holes through walls with proper heavy duty hammer drill Machine, tools & tackles, using proper sealant/ grout material & colours to match original, replacement of damages during drilling, restoring the area to original condition to the satisfaction of Owner/ EIC & as per specification for 1/2" & 1" NB in brick wall and RCC wall. PVC sleeve with proper sealant to be provided in the drilled section to protect GI pipe.
-
-
-
... More
All above activities to be carried out as per scope of work, specifications and to the complete satisfaction of consumer & EIC/ SIC.
-
-
-
... More
Handing over the completed works to owner for their operation/ use, returning of all free issue surplus material to owner stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from owner/ EIC/ SIC/ TPIA
-
-
-
... More
Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule at no extra cost to owner
-
-
-
... More
Arrangement of all tools, tackles and consumables required to execute the work in an efficient manner.
-
-
-
... More
In case of independent house with single connection, Riser isolation valve can be considered as lateral isolation valve.
-
-
-
... More
NON LMC
-
-
-
... More
Installation, testing & commissioning of powder coated GI riser of 1” & ½” from TF to Riser Isolation Valve, from Riser Isolation Valve upto lateral Isolation Valve by providing plug at all levels upto all floors including supply and fixing of all type of pipe supports/ clamps/ brackets.
-
-
-
... More
Installation of Common Ring/ Header of Powder coated GI Pipe/MS Pipe in Basement/ Terrace of the High Rise Building.
-
-
-
... More
Installation of powder coated GI pipe/MS Pipe (Horizontal/ Vertical) in Flats & Bulidings.
-
-
-
... More
Installation of 1/2" powder coated GI pipe(Threaded)
33500
-
-
... More
Installation of 1" powder coated Gl pipe (Threaded)
2750
-
-
... More
Installation/Fixing of Commercial/Non-Commercial meter and regulator with associated inlet & outlet connections fittings,anaconda,valves. Using approved meters & regulator brackets and other supports by proper scaffolding/grouting. Restoring the area/walls to original condition as per specification and to complete satisfaction of consumer and EIC.
25
-
-
... More
LMC
-
-
-
... More
Installation, testing & commissioning of 1/2" Powder Coated GI pipe & Fittings with Installation of lateral isolation valve (included) at all length after lateral isolation valve along with installation of regulator, meter with associated inlet & outlet connections/ fittings/ anaconda, supply and fixing of approved meter brackets and other supports upto Appliance Valve (excluded). Installation of Appliance Valve is covered in Conversion of Domestic Appliances.
-
-
-
... More
Installation of 1/2" Powder Coated GI pipe & Fittings at all length from lateral isolation valve up to appliance valve/gas tap along with meter & regulator installation at domestic household for connecting PNG connection with GI Riser network with end Blind/cap/plug/ (included).
Note:- SOR can only be claimed if the complete work is done from LIV(RIV incase of single connection) to appliance valve including installation of meter and regulator)
60000
-
-
... More
Conversion of Domestic Appliance
-
-
-
... More
Conversion of all types of LPG kitchen appliances to NG based appliances by installing appliance valve, suraksha hose of 1 meter, changing/ converting nozzles, jets and associated controls for domestic & imported appliances with proper tools & tackles.
-
-
-
... More
Cleaning and performing minor maintenance, greasing etc of appliance, testing/ showing performance to the customer, signing of joint meter records (JMR) and instructing customer on use & safety norms, complete as per scope of work, specifications & to the satisfaction of owner/ EIC/ SIC.
-
-
-
... More
2 Burner Stove
3850
-
-
... More
3/4 Burner Stove
1650
-
-
... More
Geyser
15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements