Hapur Pilakhua Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Hapur Pilakhua Development Authority - HPDA Tender
Eprocure
Opening Date12 Aug 2021
Closing Date17 Aug 2021
Tender Amount₹ 1,46,44,347
Costs
EMD
₹ 5,92,100Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_HPDA_607425_6Bid Award Id
ViewTender No
172/CE/HPDA/2021 DT 27/07/2021Tender Authority
Hapur Pilakhua Development Authority ViewPurchaser Address
-Website
http://https://hpdaonline.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Preparation and consolidation of sub grade with power road roller of
8 to 12 tonne capacity after excavating earth to an average of 22.5
cm depth, dressing to camber and consolidating with road roller
including making good the undulations etc. and re-rolling the sub
grade and disposal of surplus earthwith lead upto 50 metres.
1852
-
131.17
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401, MORT&H - 401.
286
-
3214
... More
Providing & laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layer with paver in sub-base/base coarse on well prepared surface and compacting with vibratory roller to achieve the desired density, MORT&H - 406.
280
-
3520.1
... More
Brick edging on both side of the road of M-150 brick 7cm wide & 11 cm deep laid with mud mortar i/c labour & supply of bricks finished to the required template and in proper alignment and also stacking dressing & ramming the excavated earth as directed byE/I
1600
-
58.5
... More
Providing and applying primer coat with 80/100 bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 Kg/sqm. using mechanical means, including supply of all materials, labour, T&P etc required for proper completion of the work as per Clause- 502 of MORT & H specifications and as per direction of the Engineer-in-charge. (A.R.)
1860
-
18.5
... More
Providing and applying tack coat with 80/100 bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg. per sqm. on the prepared bituminous/ granular surface cleaned with mechanical broom, including supply of all materials, labour T&P etc. required for proper completion of the work as per Clause - 503 of MORT & H specifications and as per direction of the Engineer-in-charge. (A.R.)
1860
-
11.85
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen 80/100(VG10) required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.
1860
-
154.1
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified level grade and cross fall using Type B seal coats as per clause 513 of MOSRT&H specification and as per dierction of the E/I (A.R.)
1860
-
57.4
... More
Brick on edge pavement with straight overburnt brick on patries with bricks, laid dry joints filled with local sand including preparation of base to proper slope , and its raming ,spreading layer of 1cm. depth of local sand over the subgrade and including cost of material, labour, T&P etc.required for proper completion of the work.
885
-
345
... More
PART (B) :-- DRAIN WORK
-
-
-
... More
Excavation in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.
200
-
95
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
150
-
3250
... More
M-150 Brick work in 1:4 ( 1cement : 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.
500
-
4950
... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.
1160
-
165
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
31
-
7000
... More
RCC work in ratio 1:1.5:3 with cement and coarse sand and 200mm stone grit………completion of work.
32
-
8750
... More
M.S (Tor steel or plain) work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized over lapping shall be measured and including cost of binding wire.
50
-
5600
... More
M-150 brick work in 1:4 cement and coarse sand of 1.25 F.M.mortar in superstruture including necesssary thickness of brick as reqruired cutting & moulding of brick as equried thickness of walls not to be less than one brick including supply of all materieals labour tools& plants etc. reqruired for proper completion of the work.
20
-
5540
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50m and lead upto 30M and lead upto 30m and including filling watering and ramming or excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30M from the foundation trenches.
20
-
95
... More
Concrete with 4cm. gauge brick ballast, fine sand of 1.25 FM & cement in the proportion 12:6:1 in foundation & under floors including supply of all materials labour T&P etc. required for proper completion of the work.
13
-
3250
... More
M-150 class brick work in 1:4 cement and coarse sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all materials labour T&P etc. required for proper completion of the work.
154
-
4950
... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.
515
-
165
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
3
-
7000
... More
Supply & Fixing of R.C.C.Grill work ( Jali ) of approved pattern & make at site of work in cement concrete consisting of cement, approved coarse sand and 6 mm nominal size stone grit in the proportion of 1;2:4 & reinforced with 6 mm dia M.S. wire / bar including cutting & finishing with 1;3 cement & fine sand of 1.25 fineness modulus mortar including including supply of material, labour, T&P required for proper completion of work (1) 5.00 cm thick
80
-
735
... More
PART ( C ) :-- SEWER WORK
-
-
-
... More
Excavation for depth upto 1.5 MBGL for laying sewer line, manhole, gully traps etc. in ordinary soil (loam, clay& sand ) i/c cutting of joints pits, trimming, dressing, levelling & refilling of trenches in 20 cm layers, watering sand ramming the same i/c removel of surplus earth or other dismentled materials, upto a distance of 50M from the center of trenches
-
-
-
... More
(a) 0-1.5 MBGL
443
-
214.22
... More
(b) 1.5 - 3.0 M BGL
102
-
269.8
... More
Supply,Carting Laying & Jointing of NP-3 RCC humepipe of different dia , & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 150 mm dia pipe (I) 0-1.5 MBGL
740
-
521.5
... More
(A) Supply,Carting Laying & Jointing of NP-3 RCC humepipe of different dia , & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 250 mm dia pipe
-
-
-
... More
(a) 0-1.5 MBGL
245
-
767.8
... More
(b) 1.5-3.0 MBGL
185
-
797.18
... More
(c) Same as above but for 300 mm dia NP-3 RCC hume pipe (a) 0-1.5 MBGL
20
-
959.17
... More
(d) Same as above but for 300 mm dia NP-3 RCC hume pipe (b) 1.5-3.0 MBGL
67
-
995.31
... More
Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials , labour, tools & plants etcc required for proper completion of the work.In bedding of RCC pipes,including cost of form work in the trenches
37
-
5820
... More
Construction of brick masonry chamber of different internal size i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.) (A) 600x600x600 mm
124
-
4745.3
... More
Construction of brick masonry chamber of 560 mm internal dia with F.P.S. bricks i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.)
-
-
-
... More
A. 900mm deep
75
-
7627
... More
B 1200mm deep
7
-
14024
... More
Addition or subtraction of ht of M.H. ofof different internal size manhole M-150 class B/W, 1:6 cement mortar, int. plaster 1:212, neat cement finished & 3 No. foot rest i/c s/o all mat lab. T&P etc. complete (A.R.)
-
-
-
... More
(A) Bottom dia 900 mm dia (beyond 900 to 1650 mm BGL)
4.5
-
5906
... More
(B) Bottom dia 1200 mm dia (beyond 1650 to 2250 mm BGL)
2.8
-
7933
... More
(C) Bottom dia 1500 mm dia (beyond 2250 to 3000 mm BGL)
1.2
-
9613
... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -560 mm internal dia
90
-
2785.92
... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -600x600 mm internal size
124
-
2785.92
... More
PART ( D ) :-- WATER SUPPLY WORK
-
-
-
... More
Excavation for depth upto 1.5 MBGL for laying sewer line, manhole, gully traps etc. in ordinary soil (loam, clay& sand) i/c cutting of joints pits, trimming, dressing, levelling & refilling of trenches in 20 cm layers, watering sand ramming the same i/c removel of surplus earth or other dismentled materials, upto a distance of 50M from the center of trenches.(A.R.)
166
-
214.2
... More
Supply carting & laying of H.D.P.E. pipe of different dia ISI marked with and including all freight taxes etc. all complete.
-
-
-
... More
(A) 110 mm dia OD 6 kg /sqcm Pressure
521
-
768
... More
(B) 160 mm dia OD 6 kg /sqcm Pressure
60
-
1596
... More
Supply carting & laying of H.D.P.E. pipe of different dia ISI marked with and including all freight taxes etc. all complete. (A) 25 mm dia
1325
-
82
... More
Making connection of drain or sewer line with existing M.H. s/c breaking into & making good the walls floors with cement concrete 1;2:4 mix, cement plaster on both sides with cement mortar 1:3 cement & coarse sand finished with a floating coat of neat cement & making necessary channeles for the drain etc. complete for 250+ 300mm dia pipe
-
-
-
... More
(A) 110x25 mm
110
-
529.92
... More
(B) 160x25 mm
26
-
1063.68
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements