Hapur Pilakhua Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Hapur Pilakhua Development Authority - HPDA Tender

Works
Eprocure
Opening Date12 Oct 2019
Closing Date2 Nov 2019
Tender Amount₹ 34,62,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M-150 Brick work in 1:4 ( 1cement : 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.

127

-

4430

... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.

438

-

165

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

21

-

6250

... More
Disposal of surplus earth available from cutting including cartage upto 0.5 km as per direction of E/I.

423

-

35

... More
R.C.C work with cement , approved coarse sand & 2cm gauge approved slone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement andits bending , but including its fixing and binding the same with 24 B.W. G.G.I binding wire and shuttering tetc and supply of all materials labour tools & plants etc required for proper completion of the work including cost of binding wire . the rate excludes maing of drip course which shall be paid extra.

13

-

7700

... More
M.S (tor steel or plain ) in work such as RCC or RB work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authories overlaping shall be measured and including cost of binding wire.

16

-

5600

... More
SEWER WORK

-

-

-

... More
Excavation for depth upto 1.5 MBGL for laying sewer line, manhole, gully traps etc. in ordinary soil (loam, clay& sand ) i/c cutting of joints pits, trimming, dressing, levelling & refilling of trenches in 20 cm layers, watering sand ramming the same i/c removel of surplus earth or other dismentled materials, upto a distance of 50M from the center of trenches. (a) 0-1.5 MBGL

551

-

183.1

... More
(b) 1.5 - 3.0 M BGL

269

-

230.7

... More
(A) Supply,Carting Laying & Jointing of NP-3 RCC humepipe of different dia , & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 250 mm dia pipe (I) 0-1.5 MBGL

258

-

584

... More
(II) 1.5-3.0 MBGL

20

-

602

... More
(c) Same as above but for 300 mm dia NP-3 RCC hume pipe (II) 0 - 1.5 m BGL

10

-

792

... More
(c) Same as above but for 300 mm dia NP-3 RCC hume pipe (II)1.5-3.0 MBGL

10

-

813

... More
Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials , labour, tools & plants etcc required for proper completion of the work.In bedding of RCC pipes,including cost of form work in the trenches

27

-

5200

... More
Construction of brick masonry chamber of different internal size i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.) (A) 600x600x600 mm

70

-

4379.8

... More
(B) 600x600x900 mm

1

-

5735

... More
Addition or subtraction of ht of M.H. ofof different internal size manhole M-150 class B/W, 1:6 cement mortar, int. plaster 1:212, neat cement finished & 3 No. foot rest i/c s/o all mat lab. T&P etc. complete (A.R.)(0.60x0.60x1.00) m.

2

-

4326

... More
Construction of brick masonry chamber of 560 mm internal dia with F.P.S. bricks i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.) (A) 900 mm deep

20

-

4326

... More
(B) 1200 mm deep

1

-

12562

... More
(C) 1500 mm deep

1

-

18627

... More
Addition or subtraction of ht of M.H. ofof different internal size manhole M-150 class B/W, 1:6 cement mortar, int. plaster 1:212, neat cement finished & 3 No. foot rest i/c s/o all mat lab. T&P etc. complete (A.R.) (A) Bottom dia 900 mm dia (beyond 900 to 1650 mm BGL)

2

-

5247

... More
(B) Bottom dia 1200 mm dia (beyond 1650 to 2250 mm BGL)

1

-

6900

... More
(C) Bottom dia 1500 mm dia (beyond 2250 to 3000 mm BGL)

1

-

8343

... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -560 mm internal dia

22

-

2785.92

... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -600x600 mm internal size

71

-

2785.92

... More
WATER SUPPLY WORK

-

-

-

... More
Excavation for depth upto 1.5 MBGL for laying sewer line, manhole, gully traps etc. in ordinary soil (loam, clay& sand) i/c cutting of joints pits, trimming, dressing, levelling & refilling of trenches in 20 cm layers, watering sand ramming the same i/c removel of surplus earth or other dismentled materials, upto a distance of 50M from the center of trenches.(A.R.)

184

-

183.1

... More
Supply carting & laying of H.D.P.E. pipe of different dia ISI marked with and including all freight taxes etc. all complete. (A) 110 mm dia OD 6 kg /sqcm Pressure

408

-

768

... More
Cement concrete with 2cm gauge approved stone ballast, coarse sand cement in the proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. For pipe thrust block

1

-

6250

... More
P/F C.I. sluice valves (with cap) complete with bolts nuts, rubber insertions etc. (the tail pieces if required will be paid saparately) (A) 100 mm dia

1

-

3184.85

... More
Construction of brick masonry chamber of different internal size i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.) (A) 600x600x900 mm

1

-

5735

... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -600x600 mm internal size

1

-

2785.92

... More
SERVICE CONNECTION WORK

-

-

-

... More
Earth work in cutting or in embankmetn form of reguar pits nt exceedding 0.50 M in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to reqquried levels and slopes and also including 1.50 M lift and 30 M lead the earth from cutting to deposited as spoil banks with in 30 M distance as directed by the engineer incharge excluding royality

214

-

183.1

... More
Supply carting & laying of H.D.P.E. pipe of different dia ISI marked with and including all freight taxes etc. all complete. (A) 250 mm dia

474

-

82

... More
Making connection of water line with existing line s/c breaking into & making good the walls floors with cement concrete 1;2:4 mix, cement plaster on both sides with cement mortar 1:3 cement & coarse sand finished with a floating coat of neat cement & making necessary channeles for the drain etc. complete (A) 110x25 mm

79

-

552

... More
(B) 160x25 mm

1

-

1108

... More
Providing & Fixing of P.F.R.C. Drain cover System of heavy duty & 125 mm thickincluding supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

15

-

920.98

... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 19.6.2 150 mm dia. R.C.C. pipe

474

-

440

... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -600x600 mm internal size

2

-

2785.92

... More
Providing and fixing Chlorinated Poly vinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement ,trenching ,refilling & testing of joints complete as per direction of Engineer in Charge. External work 18.9.3 25 mm nominal outer dia Pipes

474

-

183.98

... More
Making connection of drain or sewer line with existing M.H. s/c breaking into & making good the walls floors with cement concrete 1;2:4 mix, cement plaster on both sides with cement mortar 1:3 cement & coarse sand finished with a floating coat of neat cement & making necessary channeles for the drain etc. complete for 250+ 300mm dia pipe (A) For pipes 250 to 300 mm diameter

79

-

577

... More
Construction of brick masonry chamber of different internal size i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.) (A) 300x300x380 mm

79

-

2095

... More
Addition or subtraction of ht of M.H. ofof different internal size manhole M-150 class B/W, 1:6 cement mortar, int. plaster 1:212, neat cement finished & 3 No. foot rest i/c s/o all mat lab. T&P etc. complete (A.R.)(0.30x0.30x1.00) m.

4

-

4326



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.