Greater Noida Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Greater Noida Industrial Development Authority - GNIDA Tender

Works
Eprocure
Opening Date14 Mar 2024
Closing DateCancelled
Tender Amount₹ 6,06,86,680 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dewatering polymer @1.2kg/ton of dry Solids

1314.88

471515

358.6

... More
Chlorine @5mg/L

27393.25

443496

16.19

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

961.7

122905

127.8

... More
B-Fix Cost For 1st Year

-

-

-

... More
Civil, E&M Maintenance work

1

5557556

5557556.89

... More
Operational Staff (Detail Required)

1

4660714

4660714.28

... More
Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining,

-

-

-

... More
A-Variable cost for 2nd Year

-

-

-

... More
Dewatering polymer @1.2kg/ton of dry Solids

1447.15

518947

358.6

... More
Chlorine @5mg/L

30149

488112

16.19

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

1057.86

135194

127.8

... More
B-Fix Cost For 2nd Year

-

-

-

... More
Civil, E&M Maintenance work

1

5557556

5557556.89

... More
Operational Staff (Detail Required)

1

4660714

4660714.28

... More
Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining,

-

-

-

... More
A-Variable cost for 3rd Year

-

-

-

... More
Dewatering polymer @1.2kg/ton of dry Solids

1591.69

570780

358.6

... More
Chlorine @5mg/L

33160.25

536864

16.19

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

1163.52

148697

127.8

... More
B-Fix Cost For 3rd Year

-

-

-

... More
Civil, E&M Maintenance work

1

5557556

5557556.89

... More
Operational Staff (Detail Required)

1

4660714

4660714.28

... More
Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining,

-

-

-

... More
A-Variable cost for 4th Year

-

-

-

... More
Dewatering polymer @1.2kg/ton of dry Solids

1750.25

627639

358.6

... More
Chlorine @5mg/L

36463.5

590344

16.19

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

1279.42

163509

127.8

... More
B-Fix Cost For 4th Year

-

-

-

... More
Civil, E&M Maintenance work

1

5557556

5557556.89

... More
Operational Staff (Detail Required)

1

4660714

4660714.28

... More
Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining,

-

-

-

... More
A-Variable cost for 5th Year

-

-

-

... More
Dewatering polymer @1.2kg/ton of dry Solids

1752

628267

358.6

... More
Chlorine @5mg/L

36500

590935

16.19

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

1280.7

163673

127.8

... More
B-Fix Cost For 4th Year

-

-

-

... More
Civil, E&M Maintenance work

1

5557556

5557556.89

... More
Operational Staff (Detail Required)

1

4660714

4660714.28

... More
OCEMS Work (PART-A) "Supply, Installation, Testing & Commissioning of Effluent Quality Monitoring System at Designated Location for Real Time based continuous measurement using chemical free common / separate sensors for following parameters within their specified measuring ranges. COD, BOD, TSS,Nitrate, Total Nitrogen Total Phosphorus, pH and temperature as per the attached Annexure ""A"". Complete all work, including one year Operation and Maintenance.Online Effluent monitoring data to be connect with servers of the concerned SPCB/PCC and CPCB in a time bound manner. Above Monitoring System shall comprise Local Real Time Data Acquisition Unit with Backlight LCD display with the provision of up linking the data intermittently during the day via SMS/ GPRS to Mobile/s or the Centralized Monitoring Station (Client’s Scope) in CSV format. (a) including O & M for Ist year All STP (20MLD STP Sec-Ecotech-3)

1

2562000

2562000

... More
(b) O & M for 2nd year 20MLD STP Sec-Ecotech-3.

1

76860

76860

... More
(.c) O & M for 3rd year 20MLD STP Sec-Ecotech-3.

1

76860

76860

... More
(d) O & M for 4th year 20MLD STP Sec-Ecotech-3.

1

76860

76860

... More
(e) O & M for 5th year 20MLD STP Sec-Ecotech-3.

1

76860

76860

... More
Supply Installation Testing Commissioning of Online open channel microprocessor based ultrasonic type Flow meter along with following features: 1) Type of Display: 2-Line LCD display with operational Key. 2) Transmeter type: Remote wall mounted with cable gland.3) Unit of display: Flow rate : m3/hr, Totalizer flow : m3 4) Accuracy: +/- 0.5% of measured value. 5) Power Supply: 0-50VAC,45-65Hz, optinal : 11-40VDC 6) Self diagnostic features 7) Transmitter enclosure material : Non-corrosive, Die cast aluminium/Polycarbonate 8) Memory: 100% secure data storage 9) Communication: Suitable for wired communication. 10) Protection class:IP67 including O & M for five year 20MLD STP Sec-Ecotech-3,

2

525000

262500

... More
Add labour cess will be paid extra as per applicable

-

-

-

... More
GST will be paid extra as per applicable

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.