Greater Noida Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Greater Noida Industrial Development Authority - GNIDA Tender
Eprocure
Opening Date14 Mar 2024
Closing DateCancelled
Tender Amount₹ 6,06,86,680
Costs
EMD
₹ 12,14,000Document Cost
₹ 6,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GNIDA_916909_22Bid Award Id
ViewTender No
SM/(E-TENDER CELL)/2024/502 DATED-12.03.2024Tender Authority
Greater Noida Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.greaternoidaauthority.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dewatering polymer @1.2kg/ton of dry Solids
1314.88
471515
358.6
Chlorine @5mg/L
27393.25
443496
16.19
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
961.7
122905
127.8
B-Fix Cost For 1st Year
-
-
-
Civil, E&M Maintenance work
1
5557556
5557556.89
Operational Staff (Detail Required)
1
4660714
4660714.28
Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining,
-
-
-
A-Variable cost for 2nd Year
-
-
-
Dewatering polymer @1.2kg/ton of dry Solids
1447.15
518947
358.6
Chlorine @5mg/L
30149
488112
16.19
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
1057.86
135194
127.8
B-Fix Cost For 2nd Year
-
-
-
Civil, E&M Maintenance work
1
5557556
5557556.89
Operational Staff (Detail Required)
1
4660714
4660714.28
Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining,
-
-
-
A-Variable cost for 3rd Year
-
-
-
Dewatering polymer @1.2kg/ton of dry Solids
1591.69
570780
358.6
Chlorine @5mg/L
33160.25
536864
16.19
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
1163.52
148697
127.8
B-Fix Cost For 3rd Year
-
-
-
Civil, E&M Maintenance work
1
5557556
5557556.89
Operational Staff (Detail Required)
1
4660714
4660714.28
Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining,
-
-
-
A-Variable cost for 4th Year
-
-
-
Dewatering polymer @1.2kg/ton of dry Solids
1750.25
627639
358.6
Chlorine @5mg/L
36463.5
590344
16.19
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
1279.42
163509
127.8
B-Fix Cost For 4th Year
-
-
-
Civil, E&M Maintenance work
1
5557556
5557556.89
Operational Staff (Detail Required)
1
4660714
4660714.28
Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining,
-
-
-
A-Variable cost for 5th Year
-
-
-
Dewatering polymer @1.2kg/ton of dry Solids
1752
628267
358.6
Chlorine @5mg/L
36500
590935
16.19
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
1280.7
163673
127.8
B-Fix Cost For 4th Year
-
-
-
Civil, E&M Maintenance work
1
5557556
5557556.89
Operational Staff (Detail Required)
1
4660714
4660714.28
OCEMS Work (PART-A) "Supply, Installation, Testing & Commissioning of Effluent Quality Monitoring System at Designated Location for Real Time based continuous measurement using chemical free common / separate sensors for following parameters within their specified measuring ranges. COD, BOD, TSS,Nitrate, Total Nitrogen Total Phosphorus, pH and temperature as per the attached Annexure ""A"". Complete all work, including one year Operation and Maintenance.Online Effluent monitoring data to be connect with servers of the concerned SPCB/PCC and CPCB in a time bound manner. Above Monitoring System shall comprise Local Real Time Data Acquisition Unit with Backlight LCD display with the provision of up linking the data intermittently during the day via SMS/ GPRS to Mobile/s or the Centralized Monitoring Station (Client’s Scope) in CSV format. (a) including O & M for Ist year All STP (20MLD STP Sec-Ecotech-3)
1
2562000
2562000
(b) O & M for 2nd year 20MLD STP Sec-Ecotech-3.
1
76860
76860
(.c) O & M for 3rd year 20MLD STP Sec-Ecotech-3.
1
76860
76860
(d) O & M for 4th year 20MLD STP Sec-Ecotech-3.
1
76860
76860
(e) O & M for 5th year 20MLD STP Sec-Ecotech-3.
1
76860
76860
Supply Installation Testing Commissioning of Online open channel microprocessor based ultrasonic type Flow meter along with following features: 1) Type of Display: 2-Line LCD display with operational Key. 2) Transmeter type: Remote wall mounted with cable gland.3) Unit of display: Flow rate : m3/hr, Totalizer flow : m3 4) Accuracy: +/- 0.5% of measured value. 5) Power Supply: 0-50VAC,45-65Hz, optinal : 11-40VDC 6) Self diagnostic features 7) Transmitter enclosure material : Non-corrosive, Die cast aluminium/Polycarbonate 8) Memory: 100% secure data storage 9) Communication: Suitable for wired communication. 10) Protection class:IP67 including O & M for five year 20MLD STP Sec-Ecotech-3,
2
525000
262500
Add labour cess will be paid extra as per applicable
-
-
-
GST will be paid extra as per applicable
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements