Dakshinanchal Vidyut Vitran Nigam Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date19 Jun 2021
Closing Date28 Jun 2021
Tender AmountRefer Documents
Costs
EMD
₹ 5,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_DVVNL_597157_1Bid Award Id
ViewTender No
EUDCA-30/2021-22Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection & grouting of 11 Mtrs. ST double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
6
-
-
... More
Laying sagging stringing and binding of ACSR Dog Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
100
-
-
... More
Laying sagging stringing and binding of ACSR Weasel Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
210
-
-
... More
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
12
-
-
... More
Providing of MS Earthing Rod of 20x2500 mm and 6 SWG eaire wire etc. and Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.
12
-
-
... More
Fixing of LT Distribution box including making connections of distribution box with LT mains by piercing clamps for Aerial Bunched Cable.The work will also include the opening of the service connection of the consumer and its connecting in distribution box.
1
-
-
... More
Safe carriage of 25 KVA Distribution Transformer from Electricity Store Centre, Sarsol/Workshop, Jalapur or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole / placement on the Plinth including proper jumpering from 11 KV TPMO to the transformer and also connecting the LT site cables as per RESSPO Manual.
4
-
-
... More
Safe carriage of 63 KVA Distribution Transformer from Electricity Store Centre, Sarsol/Workshop, Jalapur or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole / placement on the Plinth including proper jumpering from 11 KV TPMO to the transformer and also connecting the LT site cables as per RESSPO Manual.
2
-
-
... More
Neutral & body earthing of Distribution Transformer by digging of pit upto water level depth (approx. 125 feet) and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms.
6
-
-
... More
Fabrication of T-Off Channel as per RESSPO Norms.
4
-
-
... More
Fabrication of Top Channel as per RESSPO Norms.
6
-
-
... More
Fabrication of Dropper Channel as per RESSPO Norms.
6
-
-
... More
Fabrication of T/F Base Channel/Angle as per RESSPO Norms.
12
-
-
... More
Providing of 11 KV Disc Insulator with fitting
3
-
-
... More
Safe carriage of 11kV XLPE HT Cable from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.
40
-
-
... More
Laying of 11kV XLPE HT Cable including making proper connections with Transformer LT side and LT line. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
40
-
-
... More
Providing 3x70sq.mm. 11 KV Cable Jointing kit (O/D & I/D) and its Filling as per RESSPO Norms.
4
-
-
... More
Laying of LT Cable including making proper connections with Transformer LT side. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
100
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements