Dakshinanchal Vidyut Vitran Nigam Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date29 Nov 2018
Closing Date17 Dec 2018
Tender Amount₹ 6,00,000
Costs
EMD
₹ 6,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_DVVNL_278068_1Bid Award Id
ViewTender No
126/EDC(M)/2018-19Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Carriage of 25 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
3
-
-
... More
Carriage of 100 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
5
-
-
... More
Carriage of 250 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
1
-
-
... More
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
70
-
-
... More
Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
145
-
-
... More
Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
26
-
-
... More
Erection of Double pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
5
-
-
... More
Erection of Double pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
2
-
-
... More
Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.
6
-
-
... More
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
35
-
-
... More
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
45
-
-
... More
Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
14800
-
-
... More
Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
850
-
-
... More
Laying, sagging stringing and binding of Arial Bunch Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
315
-
-
... More
Laying, sagging stringing and binding of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual.
125
-
-
... More
Chopping of Tree branches to Clear the route properly.
145
-
-
... More
Mounting of 16 KVA Transformer on the Double pole/Plinth structures and connections thereof.
2
-
-
... More
Mounting of 25 KVA Transformer on the Double pole/Plinth structures and connections thereof.
3
-
-
... More
Mounting of 100 KVA Transformer on the Double pole/Plinth structures and connections thereof.
5
-
-
... More
Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof.
1
-
-
... More
Cutting of CC Road for making depth foundation for erection of pole.
20
-
-
... More
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
70
-
-
... More
Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.
1
-
-
... More
Body and neutral earthing of 250 KVA and above transformer installed by digging of pit up to water level depth (approx. 100 FT) and then inserting 1-1/4” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work.
1
-
-
... More
Making of wire mesh fencing around constructed 250 KVA T/f plinth 4mtr. x 3 mtr. with proper grouting Erection and construction of Toe-wall around the transformer plinth including digging of pits and making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting of wire mesh fencing and plastering around the wall in ratio 1:4 cement and sand providing of one no. main gate in the wire mesh fencing for shifting the transformer size of gate 8 ft. x 4ft. including fixing of dandala for locking system, (Size of angle iron 50x50x6mm. and size of wire mesh fencing 1.5x2 sq. inch wire gauge 10 SWG.) All material/labour will be arranged by the contractor.
1
-
-
... More
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.
10
-
-
... More
Straightening of tilted pole structure on 8.5 Mtr. Long PCC Pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work (inside/outside village)
12
-
-
... More
Providing Bamboo sticks suitable for 4 wire on the lade conductors it include the cost of bamboo sticks, binding wire labourer, T & P carrier etc. required for completion of work.
200
-
-
... More
Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.
10
-
-
... More
Fixing of Distribution Box on erected PCC Pole.
20
-
-
... More
Re-sagging of loose H.T/L.T line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.(work will be done inside and outside of village)
18
-
-
... More
Removal/Dismantling of consumer’s cable service connection from existing line feeding consumer supply.
210
-
-
... More
Re-installation of consumer’s cable service connection from existing line feeding consumer supply.
210
-
-
... More
Dismantle of old/damaged ACSR weasel conductor/G.I. Wire from the existing line and its bundling and stacking in roll and send to J.E. Store/ Mathura Store.
1200
-
-
... More
Straightening of tilted Single pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work (inside/outside village)
30
-
-
... More
Removal/Carriage of 25/63 KVA Transformer from site to J.E. Store Centre, Mathura with loading & unloading at both ends
3
-
-
... More
Removal/Carriage of 100 KVA Transformer from site to J.E. Store Centre, Mathura with loading & unloading at both ends
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements