Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date22 Aug 2018
Closing Date29 Aug 2018
Tender Amount₹ 30,00,000
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_DVVNL_241993_1Bid Award Id
ViewTender No
T-78/2018-19 EDC FZDTender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection and grouting of double pole structure of 11 mtr. long ST pole including fixing of HT fittings and loading unloading for ST pole include the cost of all material for the contractor as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4 with material for the rate of RESPO 2018-19 direction of the work for the supervising engineer.
1
-
-
... More
Construction of plinth of aforesaid newly erected ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening with material for the rate of RESPO 2018-19 direction of the work for the supervising engineer.
33
-
-
... More
Include the cost of Drilling of hole in M.S. channel and angle provide by contractor.
106
-
-
... More
Painting of dropper channel, T channel, ST Pole and guarding angle with 2 quote of Red Oxide including the cost of paint.
126
-
-
... More
Grouting, fixing and nozzling of stay rod, and grouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm, ballast with material for the rate of RESPO 2018-19 direction of the work for the supervising engineer.
-
-
-
... More
A- Concreating of Stay
6
-
-
... More
B- Stay Complete
6
-
-
... More
C- G.I Pipe 6” dia
25
-
-
... More
Include the cost of HT supports through earthing rod and connecting it properly as per RESPO norms.
35
-
-
... More
Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer.
-
-
-
... More
A- 11 KV disk insulator with fitting
93
-
-
... More
B- 11 KV Pin insulator with Pin
93
-
-
... More
C- Earthing wire clampwith nut & bolt
53
-
-
... More
D- Bressing with clamp
1
-
-
... More
E- Stone Pad 300x300x75 mm
33
-
-
... More
F- Top channel 65x65x100
1
-
-
... More
G- MS Angle
28
-
-
... More
Include the cost of Bracket for the line & number of accessories in erection.
-
-
-
... More
A- E Bracket with clamps
28
-
-
... More
B- PG Clamp for the connected of wire
28
-
-
... More
C- Bar wait Wire
25
-
-
... More
D- Number plate with clamp
33
-
-
... More
E- Danger plate with clamp
33
-
-
... More
Include the cost of Erection of 11 KV line material
-
-
-
... More
A- Cross arm V type for 11 KV
31
-
-
... More
B- Cross Arm holding clamp with nut & Bolt
32
-
-
... More
C- F-bracktes
32
-
-
... More
D- Alluminium binding wire
12
-
-
... More
Include the erection 11 KV cable XLPE 120 sq mm/ three core for the including loading and unloading and erection include with coast of material
-
-
-
... More
A- Three phase – 4 W static TBN 11 KV
1
-
-
... More
B- 11 KV cable 3x185 sq mm
180
-
-
... More
C- Strenght through jointing kit 3x185 sq mm
4
-
-
... More
Digging, laying and back filling of 3x185 mm XLPE cable trench as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of bricks, sand, labourer, T&P etc. required for proper completion of work.
50
-
-
... More
Include the cost of laying of 3x185 sq mm XLPE cable in the above trench
130
-
-
... More
Include the cost of Laying, stringing, sagging, binding and jumpering etc of weasel conductor on the erected support for the loading, unloading and the total cost of as per RESPO norms.
3.71
-
-
... More
Guarding of 11 KV line for the guarding material and loading unloading include the cost of all materials as per RESPO menual and as per direction of supervising engineer
750
-
-
... More
Fixing of TPMO fuse set on newly erected loading unloading and erection charge and include the cost of fixing of transformers as per direction of supervising engineer.
1
-
-
... More
Loading unloading and installation of 11 KV cubical box 15/5 amp. For the include the cost of loading unloading of installation 11 KV cubical box 15/5 amp. as per RESPO manual.
1
-
-
... More
Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the Contrector as per Site requirement.
4
-
-
... More
Earthing of Power transformer (pipe earthing up to water level) including the cost of arrangement of labour T&P etc. required for proper completion of work. But the earthing material shall be provided by contractor as per site requirement.
2
-
-
... More
Installation of 11 KV VCB 200/100/5A (outgoing) 350 MVA S/S 33/11 KV S/S Nadi ki madaiya Sirsaganj including the cost of arrangement of labour T&P etc required for proper completion of work, but the 11 KV VCB shall be provided by the Contrector as per Site requirement.
1
-
-
... More
Chemical earthing of VCB indoor type for outgoing for the installation of the work in control room conection of camecal earthing in 33/11 KV S/S Nadiya ki madiya.
3
-
-
Evaluation Notes How It Works ?