Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date17 Jan 2024
Closing Date23 Jan 2024
Tender Amount₹ 10,00,000
Costs
EMD
₹ 20,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
202/edck/2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DVVNL_876168_2Bid Award Id
ViewTender No
202/EDCK/2023-24Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Carriage of 63/25/16/10 KVA T/F from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work
20
-
-
... More
Erection and grouting of P.C.C Double pole including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
15
-
-
... More
Erection and grouting of S.T.P Double pole including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
5
-
-
... More
Erection and grouting of P.C.C Single pole including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
50
-
-
... More
Erection and grouting of S.T.P Single pole including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
30
-
-
... More
Erection and grouting of stay set including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work.
50
-
-
... More
Dismentling of Rusted Weasal/Racoon /DOG conductor wire and G.I Wire as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
1
-
-
... More
Laying, Sagging, Stringing, Binding and Jumpering etc. of Weasal/Racoon /DOG conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
25
-
-
... More
Mounting of 63/25/16/10 KVA T/F on the double pole / plinth structure and connection thereof
20
-
-
... More
Laying of 11 KV XLPE 3X185/3X120/ 3X70 SqMM As per respo manual
500
-
-
... More
Safe carriage from panki store to site and Installation and grouting of meter Pilfer unit as per respo manual
10
-
-
... More
Supply & erection of X-Arm Holding / Holding clamp with N&B as per RESPO Norms.
100
-
-
... More
Supply & erection of F- Bracket with N&B as per RESPO Norms.
50
-
-
... More
Safe carriage from panki store to site and Installation of CTPT Double metering unit on double pole of large and heavy consumer as per respo manual
10
-
-
... More
Supply & erection of 11 KV I/D & O/D cable jointing kit suitable for 3X120/3X185 Sqmm (Indoor/Outdoor) with proper Termination as per RESPO Norms.
10
-
-
... More
Supply & erection of 33 KV I/D & O/D cable jointing kit suitable for 3X300 SqMM Sqmm (Indoor/Outdoor) with proper Termination as per RESPO Norms.
5
-
-
... More
Guarding of 11 K.V. Line Crossing
20
-
-
... More
Trimming of Tree Branches in New 11 K.V Line.
5
-
-
... More
Supply & Erection of G.I. Pipe 6" DIA
100
-
-
... More
Fixing of earthing Rod as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
120
-
-
Evaluation Notes How It Works ?