Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date15 Jan 2024
Closing Date20 Jan 2024
Tender AmountRefer Documents
Costs
EMD
₹ 3,10,200Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DVVNL_875958_2Bid Award Id
ViewTender No
EDC2A-60/2023-24Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
11 KV V-Type Steel cross arm with clamp
68
-
-
33 KV V-Type Steel cross arm with clamp
34
-
-
33 KV Pin insulator with pin complete
153
-
-
11 KV Pin insulator with pin complete
435
-
-
11 KV Disc insulator with fitting
456
-
-
33 KV Disc insulator with fitting
96
-
-
M.S. T-off channel with clamp B&N (100x50x1300mm)
28
-
-
F-Bracket for fitting top channel FOR 33 KV
85
-
-
F-Bracket for fitting top channel FOR 11 KV
68
-
-
Phase wire ACSR Rabbit Conductor
15620
-
-
Phase wire ACSR Dog Conductor
6026
-
-
Phase wire ACSR Weasel Conductor For Jumpering
120
-
-
11 KV Fuse Set
4
-
-
Danger Plate with clamp N&B For 33 KV
41
-
-
Danger Plate with clamp N&B For 11 KV
144
-
-
Barbed Wire G.I.
198
-
-
G.I. Wire 6 SWG (Main Guard Wire)
510
-
-
G.I. Wire 10 SWG For Cross Lacing
256
-
-
Earthing Complete For 11 KV
401
-
-
Earthing Complete For 33 KV
51
-
-
Stay Complete For 33 KV
58
-
-
Stay Complete For 11 KV
310
-
-
Concreating of Pole
452
-
-
Concreating of Stay
368
-
-
Number Plate with clamp N&B For 11 KV
325
-
-
Number Plate with clamp N&B For 33 KV
41
-
-
M.S. Nuts Bolts, Washers All Size For 33 KV
64
-
-
Aluminium Winding Wire For 33 KV
7
-
-
Aluminium Paint
868
-
-
Red Oxide Paint
868
-
-
Top channel For 33 KV
13
-
-
Top channel (125x65x2240mm) For 11 KV
76
-
-
Dropper channel (100x50x2028mm) For 11 KV
76
-
-
LT Cable 3.x5x70/35 Sq.mm.
360
-
-
LT XLPE Cable 1x240 Sq.mm.
128
-
-
Cross Bracing Angle For 11 KV
60
-
-
Cross Bracing Angle 65X65X6 mm. For 33 KV
13
-
-
Clamp with Bolt & Nut
120
-
-
M.S. Angle (75x75x6x2028mm) (T/F Base)
24
-
-
Holding Clamp with bolt nut
888
-
-
Guarding Angle with Clamp For 11 KV
60
-
-
Guarding Angle with Clamp For 33 KV
4
-
-
LT ABC 3x120 + 1x95 + 1x16 Sq.mm.
10973
-
-
LT Clamp with B&N
36
-
-
LT Shakcle Insulator
36
-
-
Earth Wire Clamp For 11 KV
12
-
-
Earth Wire Clamp For 33 KV
14
-
-
Neutral Cum Earth Wire 6 SWG GI
93
-
-
PG Clamp For Dog Conductor
42
-
-
End Clamp
45
-
-
Eye Hook
302
-
-
Suspension Clamp
179
-
-
Pearsing Connector
381
-
-
Distribution Box 3 Phase With Clamp
127
-
-
Holding Clamp For Distribution Box
250
-
-
Safe carriage & Installation of following capacity distribution transformer from old Double pole to new erected double pole including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion (earthing & Jumphering) of work.
-
-
-
25/63/100 KVA T/F
12
-
-
250 KVA T/F
4
-
-
Plinth & Fencing of 250 KVA Distribution transformer as per RESSPO Norms & the contractor shall be responsible to complete the work as per direction of Supervising Engineer. It including the cost of all material, labour T&P, carrier etc. required for proper completion of work.
4
-
-
Body/neutral earthing of 250 KVA distribution power Transformers installed by boring of pit up to water level depth (approx. 100’) and then inserting 1-1/4" dia G.I. pipe of of "B" class, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work.
8
-
-
Dismantling and removal of existing conductor/cable/GI Wire/Iron Scrap from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
-
-
-
ACSR Weasel Conductor
1227
-
-
ACSR Dog Conductor (Scarp)
639
-
-
Iron accessories 11 KV or LT Line (Cross Arm, Pin, Clamp & Channel)
606
-
-
ABC Conductor 3x50+1x35+1x16 Sq.mm.
10050
-
-
Dismentling of 11 KV Line for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
68
-
-
Dismentling of LT Line for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
181
-
-
Dismentling of 11 KV double/Section pole for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
16
-
-
Dismentling of 33 KV Line for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
34
-
-
Dismentling of 33 KV double/Section pole for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
4
-
-
Dismentling of 33 KV Try Section pole for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements