Central UP Gas Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Central UP Gas Limited - CUGL Tender

Works
Eprocure
Opening Date10 Jul 2024
Closing Date24 Jul 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply & fixing of approved clamps & nylon rawl plugs with SS 304 2" screws, grout material, suitable thread sealant i.e. Teflon Tape, foining oftransition fitting to above ground MS pipes, testin& Jumper, purging and commission of the complete installation.

-

-

-

... More
Supply and installtion of 3/4" & 1" MS pipe

350

400515

1144.33

... More
Installation of Equipment and Valves

-

-

-

... More
Installation of non domestic Diagphragh meter (Inclusive of supply & installation of 1 no. Ball Valve)

165

188814

1144.33

... More
Installation of RPD meter with EVC (lnclusive of supply & installation of 1 no. Globe Valve)

40

54095

1352.38

... More
Installation of threaded Non-Domestic regulator

205

202598

988.28

... More
Installation of flanged regulator

15

35890

2392.69

... More
Installation of Pressure gauges & Vent Pipe

205

255913

1248.36

... More
Fencing to cover the installation

205

1386195

6761.93

... More
Supply & Installation of TATA BIue Sheet

-

-

-

... More
Supply of all material, including erection and installation of TATA Blue Sheet [0.4 to 0.5 mm thick) tor Shed, as per specification enclosed and instruction of Engineer-in-Charge.

150

296485

1976.57

... More
Installation of DRS/MRS for PNG supply. (DRS - Capacityupto 5000 SCMH)

-

-

-

... More
Loading,Transpoftation of DRS/ MRS from Owner's designated store/ site to another site. Also includes unloading ofthe regulating systems, shiffing ofskids on the platform / foundation using cranes / hydra as required as per the site condition.

8

440000

55000

... More
PART-II PE SECTION

-

-

-

... More
Receiving, handling, loading, transportation and unloading of owner supplied MDPE pipes from Owner's designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Procurement and Installation of PE Fittings, PE Valves, Transition Fittings, Warning Mats, HDPE Pipes and other items required for execution shall also be in Contractor's scope. Preparation of detailed route plan, making trial pits to determine the underground utilities/ services etc. Restoration of the abandoned excavation / trial pits (excavated to depth of 1.5 m or more as per satisfaction to EIC) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / site-in charge. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies). Trenching to the required depth in all type of surface (however putting up sufficient protection/casings without any additional cost at locations where proper depth cannot be attained), uncoiling / stringing of pipes, jointing of the pipe ends/ fittings/ valves by qualified personnel, using approved electro fusion techniques as per the specification.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Lowering the MDPE pipe line in trench, padding around pipeline with suitable soil, laying of PE warning mat over the pipeline along the complete route and backfilling with available excavated material, if suitable, after screening or procurement of suitable sand/ soil as per directions of EIC/ Site-In charge. Compaction with manual technique/ jumping jack compactor and water at subsequent layers of 150mm, placement of all tiles/ slabs/ curb stones etc. removed during excavation. Roads, pavements, footpaths etc. shall be made motorable wherever pipeline is laid. Cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per specifications, instructions of land owners/ EIC to the complete satisfaction of local authorities. The laying shall be carried out by any methodology as per specification in consultation with EIC. The list of areas where the pipeline to be laid/ allocation of work will be done after awarding of the tender. The quantities are tentative and it may be changed during the tenure of contract as per the requirement of the Owner.

-

-

-

... More
Procurement & installation of GI Sleeves, 2.5" NB x 300 mm length to 3" NB x 300 mm length GI Sleeve / Half Round Concrete Sleeves for domestic connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job. Excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, firm fixing of the sleeves with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of pipe as defined in technical specification / instruction of CUGL/PMC.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Preparation, Certification and submission of (DPR) daily progress reports, graphs, As-built drawings, crossings details, utility graphs and deviation statements. Restore all surrounding ground features to that as existing before and as directed by EIC, which would include replanting of any uprooted trees etc. Pneumatic testing and commissioning as per specification and approved procedures, providing all tools and tackles, test ends, Nitrogen, instruments, manpower and other related accessories as per the instructions of the EIC. Returning of all unused material to Owner stores on completion of Gas Charging. Submission of all documents required for contract closure as mentioned in the contract. Any other activities related to operation / safety / statutory / maintenance of the works not mentioned above shall also be covered under the Scope of work and has to be completed by the Contractor within specified schedule without any extra cost to Owner.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise

-

-

-

... More
Includes laying of pipeline in all type of surface i.e. all kinds including Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after raking up of hard surface of any type. Roads, Pavement, Footpaths etc. shall be made motorable once the pipeline is laid.

-

-

-

... More
Laying using any method (Open trench including chipping method, Moling and/or HDD) with or without casing, it Includes survey of the under ground utilities, submission of site plans/layout drawings and HDD profiles for approval by CUGL/PMC, execution of the work as per the specification, including excavation of the pits, moling with hole size not exceeding 20% of the the pipe dia. Jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent backfilling, compaction, submission of as-graphs and as-built drawings as per the attached specification and the instruction of CUGL/PMC.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
Liasioning with Land Owning agencies - Submission of applications as per approved drawings provided by owner / owner's representative (Initial Route Survey,Preperation of Drawings, measuring and providing details of surface type shall be in scope of Contractor with approval from Owner / Owner's representative), obtaining & submission of demand note, Coordination, Liaisoning, Obtaining written permissions & NOC after completion of work (if applicable) from Land owing agencies like Nagar Nigam, PWD, Development Authority, AAI, Forest Dept, NHAI, Indian Railways and any other government agencies who maintains the public lands. These rates are not applicable for Private lands i.e. Apartments/institutions etc. Note: Service lines laid against SOR item no. 1.5 are not applicable;

-

-

-

... More
The Laying of Service Line of Dia 20 mm, would include installation of TF inside the pedestal and supply of material and making of pedestal for TF shall be inclusive.

-

-

-

... More
20 mm Dia

250

86317

345.27

... More
32 mm Dia

6000

2283336

380.56

... More
63 mm Dia (Excluding HDD with casing)

1500

653779

435.85

... More
All service lines left out initially during mainline laying, shall be laid under above mentioned SOR . MDPE Pipe line laying by HDD Method, without Casing

-

-

-

... More
Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs and final HDD profiles as per attached specification and the instruction of EIC / Site Engineer of Owner. The other activities are as per SOR Item No. 1 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner

-

-

-

... More
125 mm Dia HDD without casing

4000

2216940

554.24

... More
Fabrication & Installation of Pipeline Markers:

-

-

-

... More
Supply and Installation of RCC Route Markers, Powder Coated Plate / Pole Markers as per the attached drawings, along the route / along boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, supply and application of approved colour and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawings, specification and instruction of Engineer-in-Charge. The rates shall include liaison rates with statutory bodies and restoration rates and no separate rates are payable under this SOR.

-

-

-

... More
RCC Route Markers as per Drawing

300

112167

373.89

... More
Pole markers with foundation as per Drawing and instructions of EIC and specification.

175

560005

3200.03

... More
Plate Marker as per Drawing

275

73483

267.21

... More
Foundation works: (Excavation, Providing and Laying Plain Cement Concrete (1:2:4))

-

-

-

... More
Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be levelled and properly compacted complete in all respect as per scope of work, technical specification and directions of EIC. Providing and laying PLAIN CEMENT CONCRETE (PCC) (1:2:4) (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC.

100

426671

4266.71

... More
RESTORATION OF EXCAVATED WORKS

-

-

-

... More
Restoration to original condition surface like asphalted/Bituminous Road, Concrete Pavement, Agra/ Kota Stones/ Tiles(Chequered/ Interlocking. Etc.).

-

-

-

... More
For NOC/Permission from land owning agencies/private builders etc., based on "Dig and Restore" basis, payment for restoration will be released only after satisfactory completion and certification by Third party/Consultant.

-

-

-

... More
Contractor must also have to arrange his own equipment for restoration work like water tanker and jumping jack compactor for compaction of backfilled trenches and roller and other required equipment/ machinery for asphalting/ road works.

-

-

-

... More
Restoration to original conditions of dismantled surface like Asphalted/Bituminous Road, Concrete Pavement, Agra /Kota Stones / Tiles (Chequered/interlocking etc.), Dry Brick Pavement as per the technical specifications attached in the tender after laying of pipeline in Built- Up surface, as per the directions of EIC / Site lncharge. Scope includes supply of the approved quality material, testing of materials by third party agencies as per technical specification / CPWD / IRC Standards, submission of the restoration reports, obtaining no objection certificates from the concern local authorities /land owners / third party inspection agencies designated by land owing agencies and Owner. Bidder has to provide No objection certificate from land owning agency. The payment against this item shall be made after receipt of No objection certificate.

-

-

-

... More
Permanent brick surface

300

385621

1285.41

... More
Cement Concrete

200

315262

1576.31

... More
Interlocking tiles

800

1296389

1620.49

... More
Total Amount inclusive of BOCW @1% and Bidder to Mandatory fill GST in Percentage(%)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.