Banda Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Banda Development Authority Tender
Eprocure
Opening Date23 Dec 2020
Closing Date31 Dec 2020
Tender AmountRefer Documents
Costs
EMD
₹ 1,22,258Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_BDA_540314_1Bid Award Id
ViewTender No
BDABANDA/2020-21/03Tender Authority
Banda Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of granular sub-base by providing well graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory wheel roller to achive the desired density, complete as per technical specification clause-401.
207
-
2372.8
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with macanical paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achive the desired density. as per MORTH specification No. 406
316
-
2458.3
Providing and applying primer cote with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 to 1.00kg/sqm using mannual means- clause-502
3160
-
25.7
Providing and applying tack coat with V.G-10 bitumen using bitumen pressure distributor @ 0.35 to 0.45kg. per sqm. on prepared bituminous surface cleand with mechanical broom as per morth clause-503
3160
-
13.7
Providing & laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site , laid over a previously prepared surface with machanical paver finisher to the required grade, lavel and alignment & rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.
158
-
6119
Providing, laying semi-dense bitumininous concrete with 100-120 TPH batch type HMP produsing an avreage output of 75 tonne per hour using crushed aggregates of specified grading , permixed with bitumininous binder (C.R.M.B.) @4.50 to 5 per cent of mix and filer, transporting the hot mix to work site , laying with a hydrostatic paver finisher with sensor control to the requried grade, level and alignment, rolling with smooth wheeled, vibratory and tendam rollers to achive the desired compacting as per MORTH specification clause 508 complete in all respect
79
-
7567
P/L of rubber moulded Zig Zag interlocking concrete Block pavements having thickness 80 mm. as per drawings and technical specification clause 1504.(SI. No. 6.7)
1445
-
840
Earth work in excavation in foundation, pipes cable etc. in ordinary soil (loam clay or sand) including lift upto 1:5m lead upto 50 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer I/C (Sl no. 251)
95
-
120
Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 8:4:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI No. 281)
2
-
4300
Class 150 Brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation & plinth including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. (S.I. 305)
4
-
5300
Cement concrete with 2 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 4:2:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (S.I. 279A)
41
-
5600
P/L 12mm. Thick Plaster 1:4 Cement & Sand on brick work minimum thickness not less then 10mm with 1 part of cement and 4 part of find sand of 1.25 fineness modulus. Comlete with all respect as per (S.No. 584//2020-21)
1970
-
130
R.C.C. work with cement, approved coarse sand and 2cm (3/4'') gauge approved stone ballastl in the proportion of 1:1.5:3 excluding supply of rainforcement and its binding but including its fixing and binding wire copmlete with all respect.
118
-
6600
Mild steel Or iron work in plain work such as in RCC (when not included in over all rates) wrought to requerd shape as necessary including banding for proper completion of the work and including supply of steen, its wastage and hooks and authorised over lapping shall be measured (SI No…504/2020-21)
102
-
5600
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements