Agra Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Agra Development Authority - ADA Tender

Works
Eprocure
Opening Date25 Feb 2019
Closing Date4 Mar 2019
Tender Amount₹ 18,81,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying semi dense Bituminious concrete with 60-90 TPH Batch type HMP producing an average out put of 75 tonnes per hour using crushed aggragate of specifite grading premixed with bituminious binder @ 4.50% of mix and filter transporting the hot mix to work site. laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory and tan dem rolars to achieve the disired compaction as per MORTH specifition clause No. 508 complete in all repects (VG-30 Bitumen 4.5%) 9.50-4.75mm 57%, 4.75mm and below 41% filler 2%

55

-

3100

... More
Brick edging on both side of the road of M-150 bricks 8cm. (3") wide and 12cm (4½") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge. (As Per P.W.D.S.I.No.765).

0.25

-

69000

... More
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50 M in depth & earth-work in embankment to be in 20 Cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 M lift and 30 M lead. The earth from cutting (b) to be used as spoil banks within 50 M distance as directed by the Engineer-in-charge. Rates includes royalty of earth but excluding cost of earth) including cartage upto 8km. (As Per P.W.D.S.I No. 253a).

75

-

318.6

... More
Construction of granual sub base (GSB) by providing, laying, spreading and compacting specified graded crushed stone in sub base course including premixing the material at OMC in mechanical mixer (pug mill) including carriage of mixed material, laying in uniform layers with motor graded on a prepared surface and compacting with power roller to achieve the desired density including all material, labour, machinery, lighting guarding barricading and maintenance of diversion complete of as per MORT&HT technical specification clause no -401. ( grading 53mm-9.50mm 50%, 9.50mm-2.36mm 20%, 2.36mm and below 30%)

50

-

2620

... More
P/Laying of I shaped precast rubber moulded Interlocking tiles of thickness 80mm (Compressive strength not less then 30Mpa and weight 4.50kg) Including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. Including VAT (SOR 2015-16)

500

-

880

... More
Class-150 brick in 1:4 Cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work as per direction of E / I. (S.I No. 305a) SOR 2014-15

27

-

4700

... More
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as per directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches.(S.I.No.251)

70

-

130

... More
Cartage of surplus earth Including Loading and unloading but excluding on Pacca road. 5 Km Lead (As Per P.W.D.S.I No. 231(a))

70

-

138.4

... More
Engagement of Sweeper (Full time)

80

-

350

... More
12 mm thick cement plaster in 1:4 cement & coarse sand in single coat of fair side of single of half brick wall for interior plastering upto floor two level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive (SI.No-582II)

560

-

150

... More
Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone grit (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. (S.I No. 279)

10

-

6350

... More
R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion 1:1 ½ :3 in slab excluding supply of reinforcement and its bending but including its fixing and binding of the same with 24 BWGI binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labours, T & P etc. required for proper completion of the work strength of the concrete shall not be less than M-200 i.e. 200 kg. per cm2. (S.I No. 284)

5

-

8350

... More
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage, bend, hooks and authorised overlapping shall be measured upto floor two level. All compete as per direction of E/I. (S.I No. 504b). SOR 2015-16

6

-

6318

... More
J.C.B. Machine with driver including POL (Chap-2 item-29) SOR 2017-18

8

-

1000

... More
Supply of 8 HP Diesel pump for dewatering of rain water for removing water logging including fuel (Diesel , Pump opretor, making barrier in road, security of pump, diversion of traffic etc complete in all resqect as per direction of E/I. (For 11-07-2016 to 15-09-2016) (Rate as per attached lowest quotation)

8

-

240

... More
Supply of Empty bag of cement filled with local sand including supply of all material, labour, T&P etc.

30

-

27.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.