Agra Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Agra Development Authority - ADA Tender
Eprocure
Opening Date4 May 2018
Closing Date17 May 2018
Tender Amount₹ 3,45,96,000
Costs
EMD
₹ 6,92,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tender for Widening of paliwall park main road by paver machine and construction, beautification of its. (work paver).
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_ADAA_197709_5Bid Award Id
ViewTender No
04/2018-19 dt. 27/04/2018Tender Authority
Agra Development Authority ViewPurchaser Address
-Website
http://http://www.adaagra.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Consolidation of stone Ballast with stone dust in damaged portion and damaged edges including all labour T&P Roller Charges etc complete required for proper completion of work as per direction of Engineer in charge and as per P.W.D. specification.. Including cost of all material, labour, T&P, labour cess, royalty and all taxes complete but excluding cost of GST.
-
-
185
... More
Providing, laying spreading and compacting local material in block or large discrete particles, such as kankar, Laterite, Dhandla etc. as per Table 400.13 to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming requisite type of screening /binding materials to fill-up the interstices of laid material watering and compacting to the required density as per Clause 405.3 and Technical Specification Cluase 408.. Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of GST.
35
-
3880
... More
Providing and applying tack coat with Bitumen VG-10 grade pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of bitumen and GST.
6750
-
1.65
... More
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates using VG-10 Grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base bu manual specifiction 508. Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of bitumen and GST.
-
-
104.8
... More
Providing and laying seal coat by manual means with VG-10 Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of bitumen and GST.
-
-
35.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements