Agra Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Agra Development Authority - ADA Tender

Works
Eprocure
Opening Date20 Jun 2019
Closing Date28 Jun 2019
Tender Amount₹ 44,75,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 250 mm dia. R.C.C. pipe (19.6.3) DSR 2016

95

-

462.76

... More
300 mm dia. R.C.C. pipe (19.6.4) DSR 2016

100

-

497.88

... More
Supply of all materials, labour, T&P etc. and construction of man hole 1.00x1.20x1.50 internal size, excavation upto 1.65 mt depth, 15cm thick base concrete of 1:5:10 C.C., masonary work with M-150 brick with 1:4 cement & coarse sand mortar in 1.35 mtr. heaving all walls 34.5 cm thick plastered with 12mm thick plaster in 1:4 cement & fine sand mortar with neat finish, 4cm thick floor with 1:2:4 C.C., 15cm thick RCC slab in 1:1.5:3 cement, coarse sand & 20mm stone grit with reinforcement @ of 1.20% of CC work & fixing of 4 No. footrest of 16mm dia bar length 1.20 mtr., including man hole cover made of ferrow cement 60cm dia heavy duty with frame including back filling of trenches ramming watering and disposal of surplus earth near by local pits etc all complete. Analysis attached based on SOR 2017-18

6

-

24380

... More
Supply of all materials, labour, T&P etc. and construction of connecting chamber 0.60x0.60x1.50 mtr internal size, excavation upto 1.65 mt depth, 15cm thick base concrete of 1:5:10 C.C., masonary work with M-150 brick with 1:4 cement & coarse sand mortar in 1.40 mtr. heaving all walls 23cm thick plastered with 12mm thick plaster in 1:4 cement & fine sand mortar with neat finish, 4cm thick floor with 1:2:4 C.C., of CC work & fixing of 4 No. footrest of 16mm dia bar length 1.20 mtr., including man hole cover made of ferrow cement 60cm dia heavy duty with frame including back filling of trenches ramming watering and disposal of surplus earth near by local pits etc all complete. Analysis attached based on SOR 2017-18

6

-

9117

... More
Addition/subtraction of masonary shaft of man hole (size 1.00x1.20Mtr) excavation upto 1.00mtr. Depth, brick work in 1:4 cement & coarse sand mortar heaving all walls 34.5cm thick in 1.00 mtr. height plaster with 1:4 cement & fine sand mortar with neat finish and fixing of 3 No. footrest of 16mm dia bar length 1.20 mtr, etc all complete. Analysis attached based on SOR 2017-18

9

-

10701

... More
Addition/subtraction of masonary shaft of connecting chamber (size 0.60x0.60Mtr) internal size excavation upto 1.00mtr. Depth, brick work in 1:4 cement & coarse sand mortar heaving all walls 23cm thick in 1.00 mtr. height plaster with 1:4 cement & fine sand mortar with neat finish and fixing of 3 No. footrest of 16mm dia bar length 1.20 mtr, etc all complete. Analysis attached based on SOR 2017-18

9

-

4541

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). 2.16.1 Depth not exceeding 1.5 m (DSR 2016, 2.16.1)

293

-

104.2

... More
Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required. bituminous portion (16.13.1) DSR 2016

3

-

2268.68

... More
Water bound macadam (16.13.2) DSR 2016

11

-

1350.86

... More
Supply & fixing of Berricating upto 1.00 m height arround the sewer trench and man hole where requried complete all respect as per direction fo E/I. (Approved Jal Nigam Rate)

195

-

200

... More
Making connection of drain or sewer line with existing man hole including breaking into and makng good the walls, floors with cement concrete 1:2:4 cement plastered on both side with cement mortar 1:3 finished with a floatng coat of neat cement and making necessary channels with cement concrete 1:2:4 for the drain etc., Complete. S.I. No. 9 chapter 25, SOR 2017-18)

8

-

365

... More
Opening and closing of existing M.H. and chamber cover including search out of M.H./Chamber and clearance of site with cutting of grass, jhari, soil, bituminous mix etc with supply of all labour T&P etc complete. (Approved Jal Nigam Rate(

450

-

100

... More
Taking out of Earth/Silt which seltelled in man hole / chamber (comes with rain water) by bucket, including supply of all labour etc complete. 0.00 to 1.50 m (Analysis Jal Nigam Rate)

460

-

189

... More
1.50 to 3.00 m (Analysis Jal Nigam Rate)

303

-

238

... More
Dismentaling of Brick work of cement mortor for opening of plucked sewer pipe in man hole in different depth BGL. 0.00 to 1.50 m (Analysis Jal Nigam Rate)

2

-

462

... More
1.50 to 3.00 m (Analysis Jal Nigam Rate)

2

-

475.86

... More
Providing 7.50 HP dewatering pump at site on hire including hire & fuel charges of pump & all labour etc. all complete. (Analysis DSR rate)

75

-

1250

... More
Cleaning of different size sewer lines from 250mm and above different dia including removing of gas by flow of water in line by tanker & also remoring of silt by jeting, watering or manualy etc complete. (U.P. Jal Nigam rate)

12072

-

170

... More
Raising of man hole upto required depth including supply of all material labour, T&P etc complete in all respect as per direction fo E/I. (Analysis attached)

450

-

1629

... More
Class-150 brick work in 1:4 Cement and Coarse sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work as per direction of E / I. (S.I No. 305(a) SOR-2017-18

10

-

4700

... More
12mm Thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles not exceeding 80mm in girth, chamfers and finished even and smooth. (SOR 2017-18) (a) 1 cement : 4 fine sand

100

-

140

... More
Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. (S.I No. 279(a) (SOR 2017-18)

5

-

6350

... More
R.C.C Work with cement approved coarse sand and 2cm. (¾") gauge approved stone ballast in the proportion 1:1½:3 in Slab excluding supply of reinforcement and its bending the same with 24 BWGI binding wire and including nesessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. (SI.No-283 (SOR 2017-18)

10

-

8350

... More
Reinforcement of Reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of steel and its waistage Bend, hooks, Binding wire and authorized over lapping shall be measured upto floor two level. (SI.No-504 SOR-2017-18) 10mm to 32mm tor

8

-

5996

... More
Providing and Fixing of ferrow cement Man hole cover with frame complete in all respect. Heavy duty ferro cement M.H. cover with frame 600 dia. fixed with 1:2:4 PCC. (DSR)

200

-

1176

... More
Cartage/disposal of Malva / Silt at a distance of 10.00 km.

763

-

194.8

... More
Removing of Gas from man hole and chamber by water / lime. (Approved Jal Nigam Rate)

250

-

500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.