Tube Investments Of India Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Tube Investments Of India Limited - TIDC Tender
Civil And Construction
Building Construction
Eprocure
Opening Date1 Jan 2024
Closing Date11 Jan 2024
Tender Amount₹ 14,91,324.99 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 16,572Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MTIDC_45416_1Bid Award Id
ViewTender No
TIDC/EE/DNIeT/2023-24/37Tender Authority
Tube Investments Of India Limited ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone aggregate 40 mm nominal size)
7.32
72912
9960.7
Centering shuttering including struttings, propping etc. and removal of form work for:
-
-
-
Foundations, footings, bases for columns etc. for mass concrete with timber plank
50.4
16828
333.9
Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank
110.55
43225
391
Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank
97.2
55404
570
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement
-All work upto plinth level
-
-
-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
8.64
104317
12073.8
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.
-
-
-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
8.64
114962
13305.8
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement
-
-
-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
8.54
116011
13584.5
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
Thermo-Mechanically Treated bars of grade Fe-500D or more
2528.36
262696
103.9
First class brick work in foundation and plinth including cost of all materials as required complete:
-
-
-
In cement mortar 1:4 ( 1 cement : 4 fine sand )
5.63
55428
9845.2
First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:
-
-
-
In cement mortar 1:5 ( 1 cement : 5 fine sand )
1.88
21101
11224.2
Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:In cement mortar 1:4 ( 1 cement : 4 fine sand )
184.32
282654
1533.5
12 mm cement plaster of mix.Cement mortar 1:4 (1 cement : 4 fine sand)
469
105149
224.2
15 mm cement plaster on the rough side of single or half brick wall of mix: Cement mortar 1:4 (1 cement : 4 fine sand)
469
122221
260.6
Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] :New work ( two or more coats applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
938
150924
160.9
Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required: In grating, frames, guard bar, railing, brackets, gates and similar works, all complete Grill wall
355.2
50544
142.3
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, & with cleats with bolts & nuts, rivets, locking arrangement, handles, hooks & eyes, pinlets including embedding in cement concrete of required grade for fixing in position, all necessary fittings, including applying a priming coat of approved steel primer etc. complete as required:Using M.S. angels 40x40x6 mm for diagonal braces Gate
19.2
3166
164.9
Water supply renovation Providing, fixing and laying rigid UPVC pipes conforming to IS : 4985 jointing with couplers, of same class conforming to IS : 10124 ( Pt-II ) with solvent cement conforming to IS :14182 including testing of joints complete ( but excluding the cost of specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the
Engineer - in - charge.
-
-
-
Class - 3 ( working pressure 6.0 kg / cm2) 40 mm OD
200
17960
89.8
Class - 3 ( working pressure 6.0 kg / cm2) 50 mm OD
200
22560
112.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements