Tripura State Electricity Corporation Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Tripura State Electricity Corporation Limited - TSECL Tender
Civil And Construction
Eprocure
Opening Date23 Sep 2023
Closing Date10 Oct 2023
Tender Amount₹ 4,99,74,892
Costs
EMD
₹ 9,99,498Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_POWER_42262_1Bid Award Id
ViewTender No
DGM/ED-JRN/ 2023-24/03Tender Authority
Tripura State Electricity Corporation Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
8.0 Mtr long MS Steel Tubular pole
120
-
-
MS Stay set complete
960
-
-
Stay insulator HT (Porcelin)
840
-
-
Stay insulator LT (Porcelin)
120
-
-
Stranded G.I wire (7/2.5sqmm)
4800
-
-
M.S Channel (100x50x50x6mm) Brackets
5820
-
-
M.S Channel (75x40x40x6mm) Brackets
22422
-
-
M.S Angle Braket (65x65x6mm).
16268
-
-
11KV Polymer composite 45KN Disc insulator
2160
-
-
11 KV Disc Fittings
2160
-
-
11 KV 320mm CD Polymer composite Pin insulator
3420
-
-
LT Shackle insulator(3x3.5)''
720
-
-
ACSR (6/1/2.59mm2) Weasel Conductor
228
-
-
8 SWG GI wire
6600
-
-
11 KV G.O.S 3Ph (polymeric type)
60
-
-
11 KV D.O.F 3Ph (polymeric type)
60
-
-
11 KV Polymaric L.A (9kv,5kA)
180
-
-
100 Amps Cut out
360
-
-
Bracket Clamp Made by 50x6mm
4800
-
-
Stay Clamps made by 50x6mm
1680
-
-
Nuts and Bolts (16x90mm)
3720
-
-
95 sqmm PVC Cable
2400
-
-
16 sqmm PVC Cable
7200
-
-
120 sq mm Lug's
420
-
-
95sq mm Lug's
1080
-
-
Wooden plank (size- 24"x10"x1.5")
60
-
-
Danger Plate
1200
-
-
Barbed wire 1.5kg/ pole
1800
-
-
Erection of 9mtr long steel tubular pole at any kind of soil upto a depth of 1/6th of pole height, including excavation of earth, refilling the pit with soil upto the ground level ramming and making complete in all respect
1200
-
-
Erection of 9mtr long PCC tubular pole at any kind of soil upto a depth of 1/6th of pole height, including excavation of earth, refilling the pit with soil upto the ground level ramming and making complete in all respect
480
-
-
Erection of 8mtr long steel pole at any kind of soil upto a depth of 1/6th of pole height, including excavation of earth, refilling the pit with soil upto the ground level ramming and making complete in all respect
120
-
-
Erection of painted stay set complete direct in earth in/c excavation,refilling ramming etc. as required as per direction of the engg.in charge.
960
-
-
Erection of M.S Channel cross arm, 2.8mtr , long 100x50x50x6mm (excluding the cost of back clamp, nuts and bolts)
180
-
-
Erection of M.S Channel cross arm, 0.8mtr , long 100x50x50x6mm (excluding the cost of back clamp, nuts and bolts)
120
-
-
Erection of M.S channel cross arm, 2.8 Mt long, 75x40x40x6mm (excluding the cost of back clamp nuts and bolts)
240
-
-
Erection of M.S channel cross arm, 0.8 Mt long, 75x40x40x6mm (excluding the cost of back clamp nuts and bolts)
120
-
-
Erection of M.S channel cross arm, 1.2 Mt long, 75x40x40x6mm (excluding the cost of back clamp nuts and bolts)
1080
-
-
Erection of M.S channel cross arm,2.2 Mt long, 75x40x40x6mm (excluding the cost of back clamp nuts and bolts)
300
-
-
Erection of M.S channel, cross arm bracket for LT line upto 2.8 mtr long of 65x65x6mm (exexcluding the cost of back clamp, nuts and bolt)
60
-
-
Erection of M.S Angle, cross arm bracket for LT line upto 1.5 mtr long of 65x65x6mm (excluding the cost of back clamp, nuts and bolts)
1020
-
-
Erection of M.S Angle, cross arm bracket for LT line upto 2.5 mtr long of 65x65x6mm (excluding the cost of back clamp, nuts and bolt)
300
-
-
Erection of "C" type bracket for LT 5-wire of 50x50x6mm/ 65x65x6mm (excluding the cost of back clamp, nuts and bolt)
180
-
-
Fabrication of cross arm by MS Channel / MS Angle as per specification
44520
-
-
Erection of 11KV Pin insulator with GI Pin
3420
-
-
Erection of 11KV single Disc insulator set along with necessary Fittings
2160
-
-
Erection of Shackle insulator of size 75x90mm/ 100mm x15mm with straps and bolts/ U clamp on poles ( excluding the cost of straps/ U clamp, nuts and bolts)
720
-
-
Laying & Stringing of 1KM (single conductor) ACSR (6/1/2.59 mm dia "WEASEL") or equivalent AAS in/c Laying, hoisting buinding ,jumpering etc. as required.
228
-
-
Laying & Stringing of 1KM (single conductor) 10/8 SWG GI wire in/c hoisting binding ,jumpering etc. as required.
60
-
-
Installation and positioning of 11/0.433KV, 63 KVA, 3Ph 63KVA Distribution Transformer on Pole with necessary connection anfd fitting, fixing of all allied accessories components as required for making complete in all respect of energizing.
60
-
-
Erection and commissioning of 11KV 200 Amps GOS Set of three nos including necessary connection complete as per Technical Specification (excluding the cost of back clamp, nuts and bolts)
60
-
-
Erection and commissioning of 11KV DOF unit Set of three nos including necessary connection complete as per Technical Specification (excluding the cost of back clamp, nuts and bolts)
60
-
-
Erection 9KA, 5KA single pole metal oxide gapless type LA i/c necessary connection complete as per technical specification.
180
-
-
Supply & Erection of earthing set by 2.5Mt long G.I pipe (ISI marked) of 40 mm diameter with holes in/c a pair of clamps of 50x6mm MS flat & 12 mm dia galvanized nuts & bolts long with alternate layers of salt & charcoal with supply of G.I pipe, as per REC specification & design.
180
-
-
Supply of 2.5mt long 40mm dia GI Pipe (Make TATA/ JINDAL)
180
-
-
Supply of 60 Kg Salt & 55Kg Charcoal for 1Pit.
180
-
-
Laying of 8SWG GI wire at 300mm below the ground level for earthing of Sub-Station equipments from the earth electrod.
180
-
-
Fitting fixing of L.T Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24"x10"x1.5" and cable connections with termination by Lug's /Thimble complete in/c supply of wooden plank, screwes & MS clamps excluding the cost of Thimble.
120
-
-
Erection of Danger Plate on OH lines (11KV/415Volts)
1200
-
-
Erection of Barbed wire (anti climbing device) per pole.
1200
-
-
Providing three phase service connection with laying PVC cable from nearby electrical pole to premises uoto 35mtr in length supported by G.I wire, Reel insulator in/c. fitting, fixing of energy meter as required
60
-
-
Carriage of11/0.430, 3Ph 63 KVA DT by mechanical transport from the site/Store/ workshop to working site by Vis-à-vis including loading unloading and placing on base as required
60
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements