Rural Development Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Rural Development Department - RDD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date16 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 19,30,183 
Notes
Download

Costs

Summary

Providing Fitting Fixing Of Gci Sheet Partition Wall And Other Allied Works For 19th Regional Saras Fair 2024 In Extension With Industry Commerce Fair And Book Fair With The Alternation Of Partition Wall At International Fair Ground, Hapania, Agart

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and fitting fixing of POLYETHYLENE (HDPE) TARPAULINS made stall door shutter (Size-5ft x 8ft) with proper fastening & lock system including erection in position, fitting fixing etc. complete as per direction of the Eng-incharge.

27242

-

-

... More
Making, providing and fitting fixing of wooden structure with 25x25 MS square tube/50x25mm wooden battens in frames for decorative side wall of blocks (road side) (size-15ft height, 35ft length and 8 inch to 12 inch wide) covered by new cloth & flex (colour & design of flex will be as per direction of mela organising committee or tendering authority) and fixed in position with necessary nails, screws & Gl wire as per direction of Eng-in-charge. (After completion of the fair, the agency will be bound to dismantle the construction within 3(three) days with his/her own cost. For that, extra charge will not be claimed by the concerned agency. The dismantled of construction materials will be the asset of the concern agency)

10500

-

-

... More
Making of MAIN ENTRANCE GATE superstructure of 4-piller with 3- semicirculer/curved top as per drawing or direction of tendering authority by Barak Bamboo post incl. digging of hole barak bamboo of 75mm to 100mm dia post, horizontal and diagonal bracing properly tied with G.I wire or nylon/coir rope and the gate's all the pillar & top will be 4.00 ft square in size & bracing space will not more than 4.00ft and all junction will be tied with coir rope/GI wire as per direction of Eng-in-charge. (After completion fair materials will be the assets of concern agencies)

1

-

-

... More
Making of Gate of 2-piller with 1-straight top superstructure by Barak Bamboo post incl. digging of hole (size:- 15ft clear opening & height-15ft clear) and the gate's both pillar & top will be 2.00 ft square size & bracing space will be 2.00ft and all junction will be tied with coir rope/GI wire as per direction of Eng-in-charge. (After completion fair materials will be the assets of concern agencies)

1

-

-

... More
Making of Overhead Gate/Road Cross Gate of 3-piller with 1-straight top superstructure by Barak Bamboo post incl. digging of hole (size:- 18ft clear opening & 75ft long) and the gate's all the pillar & top will be 4ft square size & bracing space will be 4ft and all junction will be tied with coir rope/GI wire as per direction and decoration of gate with wooden structure of required size/shape including fitting fixing of screen/flex (flex design and write up as approved by the authority) in position at front & back side and other two side will be covered by new cloth on wooden frame and decoration as approved and as per direction of the Engg-in-Charge. of Eng-in-charge. (After completion fair materials will be the assets of concern agencies)

3

-

-

... More
Making and fitting fixing of Sand box for fire precaution by using 75mm to 100mm dia Barak Bamboo post and wooden plank or GCI Sheet walling (Size-15ft x 2.50ft x2.50ft) complete as per direction of Engin- Charge. (after completion of fair materials will be concern agencies).

5

-

-

... More
Supplying and filling of sand (course) in the sand box as per direction of Eng-in-Charge.

12.66

-

-

... More
Hiring charges of providing and fitting fixing of wooden platform & steps by using wooden post(Size-0.10mx0.076m), runner (size-0.076mx0.076m), wooden plank (thickness-0.04m) or 12mm ply wood and Nail (height as per requirement of platform) complete as per direction of Engin-charge. (after completion of fair materials will be concern agencies).

2016

-

-

... More
Shifting or alternation of G.C.I sheet make partition of size 15ftx10ft and re-fixing in position with necessary bamboo batten tied with G.I wire or coir rope including carrying loading -unloading etc. as per direction of engineer-in-charge complete. (Payment will be made per partition only and on shifting payment will be made for SARAS fair. Shifting or alternation payment will be made only for Industry & commerce Fair and Book Fair only)

150

-

-

... More
Supplying of mikes(complete sets) for fair ground for fair period in/c fitting fixing in position complete as per direction of Engin-Charge.(Hiring basis only).

12

-

-

... More
Decoration of side screen/view curter for all blocks with new cloth of white colour on wooden frame over bamboo structure including fitting fixing of screen etc. complete on hire basis as per direction of Engg-in-Charge.

5979

-

-

... More
Hiring Charges of flower tub with blooming flower including carrying loading, unloading, watering daily for the whole mela period and placing in position as per direction of the Engg-in-Charge.

150

-

-

... More
Hiring Charges of ornamental plant tub with blooming & fresh leaf including carrying loading, unloading, watering daily for the whole mela period and placing in position as per direction of the Engg-in-Charge.

150

-

-

... More
Hiring Charges of providing and fitting of LED Tuni Light typically half an inch (10-12mm) up to 16 feet (5 meters) or more properly connected by 1.50 mm² with proper tapping to prevent leakage etc. complete for the whole mela period and placing in position as per direction of the Engg-in-Charge.

500

-

-

... More
Hiring Charges for Glowsign Display board made of matel frame box is generally 4 – 8 inches deep and the width and the height of the frame are as per requirement with fluorescent tubes light fitted inside the box for glowing of GSB, including providing necessary design & write up as per direction of authority and erection in position including properly connected by 1.50 mm² with proper tapping to prevent leakage etc. complete as per direction of the Engg-in-Charge.

80

-

-

... More
Hiring Charges of Executive class Sofa Set with white towel for covering the sofa set including laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

10

-

-

... More
Shuttering Carpenter-system--Hacksaw Frame With Blade

10

-

-

... More
Shuttering Carpenter-system--Triangle File

10

-

-

... More
Shuttering Carpenter-system--1/2 Round File

1

-

-

... More
Shuttering Carpenter-system--Drill Bit

5

-

-

... More
Shuttering Carpenter-system--Ring Spanner

5

-

-

... More
Shuttering Carpenter-system--Double End Spanner

5

-

-

... More
Shuttering Carpenter-system--Flat File

2

-

-

... More
Shuttering Carpenter-system--Material For Temporary Scaffolding Up to 3.6 Mtrs

1

-

-

... More
Shuttering Carpenter-system--Base Plate

4

-

-

... More
Shuttering Carpenter-system--Joint Pin

4

-

-

... More
Shuttering Carpenter-system--Vertical

4

-

-

... More
Shuttering Carpenter-system--Ledger

4

-

-

... More
Shuttering Carpenter-system--Cuplocks

4

-

-

... More
Shuttering Carpenter-system--Walkway Challi

1

-

-

... More
Shuttering Carpenter-system--Hand Held Zig Saw

1

-

-

... More
Shuttering Carpenter-system--Hand Drill Machine

1

-

-

... More
Shuttering Carpenter-system--Table Mounted Saw

1

-

-

... More
Shuttering Carpenter-system--Power Drilling Machine

1

-

-

... More
Shuttering Carpenter-system--Planing Machine

1

-

-

... More
Shuttering Carpenter-system--Steel Walkways

5

-

-

... More
Shuttering Carpenter-system--GI Ladder (7 step)

5

-

-

... More
Shuttering Carpenter-system--Plumb Bob

10

-

-

... More
Shuttering Carpenter-system--Water Level Tube

10

-

-

... More
Shuttering Carpenter-system--Masons Line

5

-

-

... More
Shuttering Carpenter-system--Hammer

5

-

-

... More
Shuttering Carpenter-system--Spanner

5

-

-

... More
Shuttering Carpenter-system--Wrench

5

-

-

... More
Shuttering Carpenter-system--Pulley

5

-

-

... More
Shuttering Carpenter-system--Rope

5

-

-

... More
Shuttering Carpenter-system--Nut And Bolts (Various Size)

1

-

-

... More
Shuttering Carpenter-system--Safety Net

1

-

-

... More
Shuttering Carpenter-system--Safety Shoes

30

-

-

... More
Shuttering Carpenter-system--Safety Gogles

30

-

-

... More
Shuttering Carpenter-system--Safety Helmets

30

-

-

... More
Shuttering Carpenter-system--Cotton Hand Gloves

30

-

-

... More
Shuttering Carpenter-system--Tools Bag

1

-

-

... More
Shuttering Carpenter-system--Safety Belt

5

-

-

... More
Shuttering Carpenter-system--Safety Harness

5

-

-

... More
Shuttering Carpenter-system--Face Mask

30

-

-

... More
Shuttering Carpenter-system--Leather Apron

30

-

-

... More
5H)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Belbari RD Block area

350

-

-

... More
5I)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----MohanpurRD Block area

350

-

-

... More
5J)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Bamutia RD Block area

350

-

-

... More
5K)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Dukli RD Block area

350

-

-

... More
5L)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Hezamara RD Block area

350

-

-

... More
5M)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Lefunga RD Block area

350

-

-

... More
6A)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----AMC area

2500

-

-

... More
6B)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----MMC area

2500

-

-

... More
6C)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Jirania NP area

2500

-

-

... More
6D)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Ranirbazar MC area

2500

-

-

... More
6E)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Jirania RD Block area

2500

-

-

... More
6F)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Mandwi RD Block area

2500

-

-

... More
6G)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Old Agartala RD Block area

2500

-

-

... More
6H)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Belbari RD Block area

2500

-

-

... More
6I)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----MohanpurRD Block area

2500

-

-

... More
6J)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Bamutia RD Block area

2500

-

-

... More
6K)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Dukli RD Block area

2500

-

-

... More
6L)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Hezamara RD Block area

2500

-

-

... More
6M)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Lefunga RD Block area

2500

-

-

... More
7A)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----AMC area

100

-

-

... More
7B)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MMC area

100

-

-

... More
7C)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania NP area

100

-

-

... More
7D)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Ranirbazar MC area

100

-

-

... More
7E)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania RD Block area

100

-

-

... More
7F)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Mandwi RD Block area

100

-

-

... More
7G)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Old Agartala RD Block area

100

-

-

... More
7H)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Belbari RD Block area

100

-

-

... More
7I)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MohanpurRD Block area

100

-

-

... More
7J)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Bamutia RD Block area

100

-

-

... More
7K)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Dukli RD Block area

100

-

-

... More
7L)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Hezamara RD Block area

100

-

-

... More
7M)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Lefunga RD Block area

100

-

-

... More
8A)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----AMC area

150

-

-

... More
8B)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MMC area

150

-

-

... More
8C)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania NP area

150

-

-

... More
8D)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Ranirbazar MC area

150

-

-

... More
8E)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania RD Block area

150

-

-

... More
8F)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Mandwi RD Block area

150

-

-

... More
8G)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Old Agartala RD Block area

150

-

-

... More
8H)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Belbari RD Block area

150

-

-

... More
8I)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MohanpurRD Block area

150

-

-

... More
8J)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Bamutia RD Block area

150

-

-

... More
8K)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Dukli RD Block area

150

-

-

... More
8L)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Hezamara RD Block area

150

-

-

... More
8M)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Lefunga RD Block area

150

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.