Rural Development Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date18 Jul 2024
Closing Date24 Jul 2024
Tender Amount₹ 12,16,274 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hiring charges supplying and fitting fixing of POLYETHYLENE (HDPE) TARPAULINS for shed and covering the side wall with proper fastening system including erection in position, fitting fixing etc. complete as per direction of the Eng-in-charge.

1440

-

-

... More
Manufacturing and decoration of Food Stall of size 4ft x 8ft by wooden structure with 50x25mm wooden batten of table height 0.75mtr with a table top made by 6-10mm thick good quality ply wood over necessary wooden framed structure and covered by new dhoom cloth. The roof cover of food stall will be four side slopping roof at a height of 2.40 mtr ceiling with necessary wooden frame structure fixed over four nos barak bamboo post properly decorate with new dhoom cloth with necessary structure made by 50x25mm wooden frame as per drawing and direction of Engineer-in-Charge. (In the time of measurement only table top area will be considered) (After completion of fair materials will be the assets of concern agencies)

384

-

-

... More
Repairing and maintenance of wooden Dias/Platform by changing wooden plank of 40mm thick, frames of dais (75x50mm) and wooden post of (100x100mm) as and where necessary including necessary nails etc. complete as per direction of engg-in-charge.

0.25

-

-

... More
Construction of temporary urinal point (size 1.2m x 1.20m x 1.80 m) at different location in mela ground by using double layer dhari mat wall & shutter of door with split bamboo battens 40mm wide including tying with Gl wire erection in position, fitting fixing etc. and 2 nos bricks for foot step with a sock pit point (size 0.9m dia and 1.20m depth) and covered by barak bamboo and earth over 75mm to 100mm dia barak bamboo complete as per direction of Eng-in-charge.(After completion of fair materials will be the assets of concern agencies)

6

-

-

... More
Construction of temporary VIP toilet with Commode by using 6mm thick ply wood wall & floor, Wooden structure, PVC door and erection in position, fitting fixing and painting as per required shed with provision for door shutter & locking arrangement etc. and excavation of pit 0.75 m dia and 1.20m depth incl. cover of pit by barak bamboo and earth over 75mm to 100mm dia barak bamboo complete as per direction of Eng-in-charge (after completion of programme materials will be concern agencies).

1

-

-

... More
Supplying, spreading and filling of sand (course) in the Assam Rifles ground and Raj Bhaban wherever required as per direction of Eng-in-Charge.

9

-

-

... More
Hiring Charge of Carpet including laying and fixing in position by maintaining proper column & rows including loading unloading and carrying complete as per direction of Eng-in-charge.

15424

-

-

... More
Hiring charges of providing and laying flat brick soling layer on prepared subgrade according to lines, roads and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same as per direction of Engg-in-charge. (After completion of fair materials will be the assets of concern agencies)

54

-

-

... More
Construction of temporary single GCI sheet roof shed (Superstructure) for LED Screen of height range 20ft to 25ft and size of shed 20ft x 8ft as per instruction and one intermediate wooden platform at a height of 10ft properly braced by the wooden plank and l.50m interval intermediate post 75 mm to 100mm dia Barak bamboo post, post plate, rafter, purline top & bottom for GCI sheet roofing tying with Gl Wire/rope including the cost of loading unloading and caring tying, fitting fixing complete as per direction of Eng- in Charge (No GCI sheet will be supplied by the Department). The three side of the shed will be covered by the dark shed dhoom cloth to prevent passing light. (After completion of the fair, the agency will be bound to dismantle the construction within 3(three) days with his/her own cost. For that, extra charge will not be claimed by the concerned agency. The dismantled of construction materials will be the asset of the concerned agency)

1

-

-

... More
Hiring charges of providing and fitting fixing of wooden platform & steps for stage/dias etc of any size by using wooden post (Size-0.10mx0.10m), runner(size- 0.076m x0.076m), wooden plank(thickness-0.04m) or 19/12mm ply wood and Nail (height as per requirement of platform)complete as per direction of Eng-in-charge (after completion of fair materials will be concern agencies).

920

-

-

... More
Hiring charges of MS Steel made truss more than 25 feet clear span including fitting-fixing in position by maintaining proper connection without leakage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge. (After completion programme materials will be the assets of concern agencies)

68

-

-

... More
Hiring charges of providing and fitting fixing of LED light (18/20 watt) on ire basis at ceiling in position including providing electric connection with necessary wire as per instruction of Engg-in charge.

85

-

-

... More
Hiring charges of Cooler including fitting-fixing in position by maintaining proper connection without leakage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge (after completion of fair materials will be concern agencies).

15

-

-

... More
Hiring charges of Ceiling Fan including fitting-fixing in position by maintaining proper connection without leakage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge (after completion of fair materials will be concern agencies).

44

-

-

... More
Hiring charges of Stand Fan including fitting-fixing in position by maintaining proper connection without leakage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge (after completion of fair materials will be concern agencies).

20

-

-

... More
Hiring Charges of plastic chair with or without arm as desired by the authority including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

1200

-

-

... More
Hiring Charges of TFDPC Made wooden armed chair with cushion including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

20

-

-

... More
Hiring Charges of Executive class Sofa Set with white towel for covering the sofa set including laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

50

-

-

... More
Duster

50

-

-

... More
Door Matress

5

-

-

... More
Dustbin

5

-

-

... More
Envelope

500

-

-

... More
LED Bulb

20

-

-

... More
File Cover (Khaki colour)

500

-

-

... More
File Board (Khaki colour)

500

-

-

... More
File Flag (sticky note) (size-25 mm X 75 mm)

30

-

-

... More
Fax Role

5

-

-

... More
File Board with Cover (4 side cover)

50

-

-

... More
Note Sheet-A4 Size (Best Quality )

30

-

-

... More
Gum

30

-

-

... More
Guard File

5

-

-

... More
Good Knight Liquid

15

-

-

... More
Good Knight Machine

5

-

-

... More
Harpic toilet cleaner

50

-

-

... More
Harpic Brush

5

-

-

... More
Hit Mosquito spray

2

-

-

... More
Hand Wash

20

-

-

... More
Sanitizer

30

-

-

... More
Highlighter Pen

20

-

-

... More
Gems Clip

20

-

-

... More
Jharu (Broom)

15

-

-

... More
Knife

20

-

-

... More
Ton Yarn

50

-

-

... More
Lock

10

-

-

... More
Mug (Plastic)

10

-

-

... More
Measurement Book

200

-

-

... More
Measurement Tape

10

-

-

... More
Marker Pen

20

-

-

... More
Naphthalene

3

-

-

... More
Odonil

40

-

-

... More
One time Pen

500

-

-

... More
Paper Weight

20

-

-

... More
Phenyle

50

-

-

... More
Pin Cushion

10

-

-

... More
Pencil Battery

50

-

-

... More
Pencil

20

-

-

... More
Plastic Chair without arm

30

-

-

... More
Stapler Machine

30

-

-

... More
Stapler Pin (big)

100

-

-

... More
Seat Cushion

10

-

-

... More
Stock Register (No-24)

10

-

-

... More
Stamp Pad

20

-

-

... More
Sujan (Wooden Handle)

20

-

-

... More
Scale (Plastic)

10

-

-

... More
Scissor

10

-

-

... More
Shalu Cloth

100

-

-

... More
Stamp Pad Ink

20

-

-

... More
Sketch Pen

20

-

-

... More
Tag

300

-

-

... More
Towel

30

-

-

... More
Table Glass

20

-

-

... More
Table Basket

10

-

-

... More
Writing Pad

50

-

-

... More
Water Glass

20

-

-

... More
Carbon Paper

20

-

-

... More
Kangaro Desk Essentials, 1 Hole Heavy Duty Metal Paper Punch machine

5

-

-

... More
Metal Binder Clips 25 mm Paper Holding

20

-

-

... More
Gala Seal

10

-

-

... More
7D)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Ranirbazar MC area

100

-

-

... More
7E)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania RD Block area

100

-

-

... More
7F)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Mandwi RD Block area

100

-

-

... More
7G)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Old Agartala RD Block area

100

-

-

... More
7H)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Belbari RD Block area

100

-

-

... More
7I)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MohanpurRD Block area

100

-

-

... More
7J)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Bamutia RD Block area

100

-

-

... More
7K)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Dukli RD Block area

100

-

-

... More
7L)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Hezamara RD Block area

100

-

-

... More
7M)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Lefunga RD Block area

100

-

-

... More
8A)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----AMC area

150

-

-

... More
8B)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MMC area

150

-

-

... More
8C)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania NP area

150

-

-

... More
8D)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Ranirbazar MC area

150

-

-

... More
8E)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania RD Block area

150

-

-

... More
8F)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Mandwi RD Block area

150

-

-

... More
8G)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Old Agartala RD Block area

150

-

-

... More
8H)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Belbari RD Block area

150

-

-

... More
8I)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MohanpurRD Block area

150

-

-

... More
8J)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Bamutia RD Block area

150

-

-

... More
8K)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Dukli RD Block area

150

-

-

... More
8L)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Hezamara RD Block area

150

-

-

... More
8M)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Lefunga RD Block area

150

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.