Rural Development Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Rural Development Department - RDD Tender

Works
Civil And Construction
Road Construction
Civil Works Others
Building Construction
Eprocure
Opening Date19 Nov 2024
Closing Date10 Dec 2024
Tender Amount₹ 30,70,70,000 
Notes
Download

Costs

Summary

Construction Of (g 6) Storied Office Building For Establishment Of Directorate Of Economics And Statistics (des) At Shankar Chowmuhani, Agartala, Tripura Including

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and fitting fixing of PS 300 TM 10 watt speaker high fidelity 2 way,100v multipurpose, 100 V, power taps of 6w, 3w & 1.5 w. speaker type Book shelf, Connectivity technology-auxiliary, Movable mounting bracket supplied, can be mounted in vertical or horizontal position. (analysis rate)

1

-

-

... More
Supplying and fitting fixing of SSA-10000 mixer amplifier ,whopping 1000 watts output ,high wattage,weight-12kg, diamensions-40cm (width) x 20cm (height) x 30cm(depth), power source-AC ,Type-AV power amplifier, frequency response-50-15000hz +- 3dB, on load to full load at 1KHz complete as req.(Analysis rate)

1

-

-

... More
Construction of temporary urinal point (size 1.2m x 1.20m x 1.80 m) at different location in mela ground by using double layer dhari mat wall & shutter of door with split bamboo battens 40mm wide including tying with Gl wire erection in position, fitting fixing etc. and 2 nos bricks for foot step with a sock pit point (size 0.9m dia and 1.20m depth) and covered by barak bamboo and earth over 75mm to 100mm dia barak bamboo complete as per direction of Eng-in-charge. After completion of fair materials will be the assets of concerned agencies.

6

-

-

... More
Construction of temporary VIP toilet with Commode by using 6mm thick ply wood wall & floor, Wooden structure, PVC door and erection in position, fitting fixing and painting as per required shed with provision for door shutter & locking arrangement etc. and excavation of pit 0.75 m dia and 1.20 m depth incl. cover of pit by barak bamboo and earth over 75mm to 100mm dia barak bamboo complete as per direction of Eng-in-charge. After completion of fair materials will be the assets of concerned agencies.

1

-

-

... More
Supplying, spreading and filling of sand (course) in the Assam Rifles ground and Raj Bhavan wherever required as per direction of Eng-in-Charge.

9

-

-

... More
Hiring Charge of Carpet including laying and fixing in position by maintaining proper column & rows including loading unloading and carrying complete as per direction of Eng-in-charge.

18050

-

-

... More
Providing and laying flat brick soling layer on prepared subgrade according to lines, roads and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. The dismantled construction materials will be the assets of the concerned agency.

66.6

-

-

... More
Construction of temporary single GCI sheet roof shed (Superstructure) for LED Screen of height range 20ft to 25ft and size of shed 30ft x 8ft as per instruction and one intermediate wooden platform at a height of 10ft properly braced by the wooden plank and l.50m interval intermediate post 75 mm to 100mm dia Barak bamboo post, post plate, rafter, purline top & bottom for GCI sheet roofing tying with Gl Wire/rope including the cost of loading unloading and caring tying, fitting fixing complete as per direction of Eng- in Charge (No GCI sheet will be supplied by the Department). The three side of the shed will be covered by the dark shed cloth to prevent passing light. (After completion of the fair, the agency will be bound to dismantle the construction within 3(three) days with his/her own cost. For that, extra charge will not be claimed by the concerned agency. The dismantled construction materials will be the asset of the concerned agency).

1

-

-

... More
Providing and fitting fixing of wooden platform for Selfie Point (Size:12ftx12ft) & steps by using wooden post (Size-0.10mx0.10m), runner (size-0.076mx0.076m),wooden plank (thickness-0.04m) or 12mm ply wood and Nail (height as per requirement of platform)complete as per direction of Eng-in-charge. After completion of fair materials will be the assets of concerned agencies.

384

-

-

... More
Hiring charges of Cooler including fitting-fixing in position by maintaining proper connection without leakage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge.

5

-

-

... More
Hiring charges of Ceilling Fan including fitting-fixing in position by maintaining proper connection without leakage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge.

10

-

-

... More
Hiring charges for providing and fitting fixing of LED light (18/20 watt) on hire basis at ceiling in position including providing electric connection with necessary wire as per instruction of Engg-in charge.

40

-

-

... More
Hiring Charges of Center Table made with glass cover including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

20

-

-

... More
Hiring Charges of plastic chair with or without arm as desired by the authority including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

700

-

-

... More
Hiring Charges of TFDPC Made wooden armed chair with cushion including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

10

-

-

... More
Hiring Charges of Executive class Sofa Set with white towel for covering the sofa set including laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

10

-

-

... More
Shuttering Carpenter-system--Hacksaw Frame With Blade

10

-

-

... More
Shuttering Carpenter-system--Triangle File

10

-

-

... More
Shuttering Carpenter-system--1/2 Round File

1

-

-

... More
Shuttering Carpenter-system--Drill Bit

5

-

-

... More
Shuttering Carpenter-system--Ring Spanner

5

-

-

... More
Shuttering Carpenter-system--Double End Spanner

5

-

-

... More
Shuttering Carpenter-system--Flat File

2

-

-

... More
Shuttering Carpenter-system--Material For Temporary Scaffolding Up to 3.6 Mtrs

1

-

-

... More
Shuttering Carpenter-system--Base Plate

4

-

-

... More
Shuttering Carpenter-system--Joint Pin

4

-

-

... More
Shuttering Carpenter-system--Vertical

4

-

-

... More
Shuttering Carpenter-system--Ledger

4

-

-

... More
Shuttering Carpenter-system--Cuplocks

4

-

-

... More
Shuttering Carpenter-system--Walkway Challi

1

-

-

... More
Shuttering Carpenter-system--Hand Held Zig Saw

1

-

-

... More
Shuttering Carpenter-system--Hand Drill Machine

1

-

-

... More
Shuttering Carpenter-system--Table Mounted Saw

1

-

-

... More
Shuttering Carpenter-system--Power Drilling Machine

1

-

-

... More
Shuttering Carpenter-system--Planing Machine

1

-

-

... More
Shuttering Carpenter-system--Steel Walkways

5

-

-

... More
Shuttering Carpenter-system--GI Ladder (7 step)

5

-

-

... More
Shuttering Carpenter-system--Plumb Bob

10

-

-

... More
Shuttering Carpenter-system--Water Level Tube

10

-

-

... More
Shuttering Carpenter-system--Masons Line

5

-

-

... More
Shuttering Carpenter-system--Hammer

5

-

-

... More
Shuttering Carpenter-system--Spanner

5

-

-

... More
Shuttering Carpenter-system--Wrench

5

-

-

... More
Shuttering Carpenter-system--Pulley

5

-

-

... More
Shuttering Carpenter-system--Rope

5

-

-

... More
Shuttering Carpenter-system--Nut And Bolts (Various Size)

1

-

-

... More
Shuttering Carpenter-system--Safety Net

1

-

-

... More
Shuttering Carpenter-system--Safety Shoes

30

-

-

... More
Shuttering Carpenter-system--Safety Gogles

30

-

-

... More
Shuttering Carpenter-system--Safety Helmets

30

-

-

... More
Shuttering Carpenter-system--Cotton Hand Gloves

30

-

-

... More
Shuttering Carpenter-system--Tools Bag

1

-

-

... More
Shuttering Carpenter-system--Safety Belt

5

-

-

... More
Shuttering Carpenter-system--Safety Harness

5

-

-

... More
Shuttering Carpenter-system--Face Mask

30

-

-

... More
Shuttering Carpenter-system--Leather Apron

30

-

-

... More
5H)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Belbari RD Block area

350

-

-

... More
5I)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----MohanpurRD Block area

350

-

-

... More
5J)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Bamutia RD Block area

350

-

-

... More
5K)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Dukli RD Block area

350

-

-

... More
5L)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Hezamara RD Block area

350

-

-

... More
5M)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Lefunga RD Block area

350

-

-

... More
6A)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----AMC area

2500

-

-

... More
6B)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----MMC area

2500

-

-

... More
6C)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Jirania NP area

2500

-

-

... More
6D)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Ranirbazar MC area

2500

-

-

... More
6E)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Jirania RD Block area

2500

-

-

... More
6F)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Mandwi RD Block area

2500

-

-

... More
6G)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Old Agartala RD Block area

2500

-

-

... More
6H)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Belbari RD Block area

2500

-

-

... More
6I)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----MohanpurRD Block area

2500

-

-

... More
6J)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Bamutia RD Block area

2500

-

-

... More
6K)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Dukli RD Block area

2500

-

-

... More
6L)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Hezamara RD Block area

2500

-

-

... More
6M)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Lefunga RD Block area

2500

-

-

... More
7A)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----AMC area

100

-

-

... More
7B)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MMC area

100

-

-

... More
7C)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania NP area

100

-

-

... More
7D)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Ranirbazar MC area

100

-

-

... More
7E)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania RD Block area

100

-

-

... More
7F)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Mandwi RD Block area

100

-

-

... More
7G)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Old Agartala RD Block area

100

-

-

... More
7H)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Belbari RD Block area

100

-

-

... More
7I)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MohanpurRD Block area

100

-

-

... More
7J)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Bamutia RD Block area

100

-

-

... More
7K)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Dukli RD Block area

100

-

-

... More
7L)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Hezamara RD Block area

100

-

-

... More
7M)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Lefunga RD Block area

100

-

-

... More
8A)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----AMC area

150

-

-

... More
8B)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MMC area

150

-

-

... More
8C)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania NP area

150

-

-

... More
8D)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Ranirbazar MC area

150

-

-

... More
8E)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania RD Block area

150

-

-

... More
8F)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Mandwi RD Block area

150

-

-

... More
8G)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Old Agartala RD Block area

150

-

-

... More
8H)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Belbari RD Block area

150

-

-

... More
8I)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MohanpurRD Block area

150

-

-

... More
8J)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Bamutia RD Block area

150

-

-

... More
8K)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Dukli RD Block area

150

-

-

... More
8L)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Hezamara RD Block area

150

-

-

... More
8M)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Lefunga RD Block area

150

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.