Municipal Corporation Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date17 Jan 2025
Closing Date30 Jan 2025
Tender Amount₹ 4,89,303
Costs
EMD
₹ 9,786Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Development Of Galli And Drain With Necessary Allied Works Near H.o Pradip Datta To Kalapania Khal, South Ramnagar Ward No-36, Amc
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SAMC_57033_1Tender No
34/EE/DIV-I/AMC/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://agartalacity.tripura.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supplying of 2nd class brick bats including loading, unloading, carriage, laying, spreading and consolidation with road roller etc. complete as per direction of the Engineer-in-Charge.(15 % will be deducted for voids)/ (AR)
4.5
1850
8325
... More
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412.
49.5
579
28665
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
6.55
9938
65098
... More
Supplying bamboo (1st class) 85 mm to 100 mm dia and making shoe with end tappered upto 300 mm from the bottom of the bamboo as per drawing and specification.
300
42
12600
... More
Handling and driving bamboo (1st class) 85 mm to 100 mm dia upto the length required by heavy hammer as per drawing and specification.
156
70
10936
... More
Providing and fitting, fixing bamboo (1st class) 85 mm to 100 mm dia for horizontal, diagonal bracing, strut etc. with nails / spikes and binding wire (GI 2.00 mm) as per drawing and specification.
60
57
3438
... More
Providing and fitting, fixing double layer split muli bamboo tatti lining in position as per drawing and specification.
24
205
4922
... More
Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m.
-All kinds of soil
30
311
9351
... More
First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:5 ( 1 cement : 5 fine sand ).
12.61
9667
121917
... More
Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:5 ( 1 cement : 5 fine sand ).
17.6
1291
22737
... More
12 mm cement plaster of mix Cement mortar 1:5 (1 cement : 5 fine sand)
61.51
214
13163
... More
Neat Cement Punning
61.51
56
3494
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
11.83
11355
134281
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements