Municipal Corporation Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Municipal Corporation Tender
Civil And Construction
Excavation
Water Storage And Supply
Eprocure
Opening Date29 Oct 2024
Closing Date11 Nov 2024
Tender Amount₹ 27,75,572
Costs
EMD
₹ 55,511Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SAMC_54193_1Bid Award Id
ViewTender No
24/EE/DIV-I/AMC/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://agartalacity.tripura.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt
brick aggregate 20 mm nominal size)
5.33
9938
52953
... More
First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
22.55
9845
222009
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
12.9
11355
146489
... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level:1:2:4 ( 1 Cement:2 fine sand : 4 graded stone
aggregate 20 mm nominal size)
22.21
11693
259712
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars,
piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
32.27
12925
417085
... More
Centering shuttering including struttings, propping etc. and removal of form work for:Foundations, footings, bases for columns etc. for mass
concrete with timber plank
35.52
333
11860
... More
Centering shuttering including struttings, propping etc. and removal of form work for:Columns, Pillars, Piers, Abutments, Posts and Struts with
wooden plank
105.5
570
60135
... More
Centering shuttering including struttings, propping etc. and removal of form work for:Lintels, beams, plinth beams, girders, bressumers and
cantilevers with wooden plank
35.38
391
13834
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
6374.86
103
662347
... More
12 mm cement plaster of mix : In cement mortar 1 : 4 ( 1 cement : 4 fine sand )
264.5
224
59301
... More
12 mm cement plaster of mix : In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) in/cl Neat cement punning
44.4
281
12476
... More
Providing and fixing chequered terrazo tiles 22 mm thick with graded marble chips of size upto 6 mm, laid on floors, footpath & courtyard on 20 mm thick bed of cement mortar 1 : 4 ( 1 cement : 4 fine sand ) jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and polishing etc. all complete as per direction of Engineer-in-charge. Dark shade pigment using ordinary cement
17.69
995
17603
... More
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :
-All kinds of soil
129
556
71724
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
-All kinds of soil
42.2
161
6806
... More
Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
2.7
1311
3542
... More
Supplying bamboo (1st class) 85 mm to 100 mm dia and
making shoe with end tappered upto 300 mm from the
bottom of the bamboo as per drawing and specification.
664.2
42
27896
... More
Handling and driving bamboo (1st class) 85 mm to 100
mm dia upto the length required by heavy hammer as per
drawing and specification.
332.1
70
23280
... More
Providing and fitting, fixing bamboo (1st class) 85 mm to
100 mm dia for horizontal, diagonal bracing, strut etc. with
nails / spikes and binding wire (GI 2.00 mm) as per
drawing and specification.
164
57
9397
... More
Providing and fitting, fixing double layer split muli bamboo
tatti lining in position as per drawing and specification.
36.9
205
7568
... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
816
159
130070
... More
Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using
steel etc. complete as required:-In grating, frames, guard bar, railing, brackets, gates and similar works, all complete.
3196.8
142
454905
... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade [Payment shall be made after submission of Test Certificate issued by the Manufacturer]: Two or more coats on new work over an under coat of suitable shade with ordinary paint (primer) of approved brand and manufacture
99.9
154
15425
... More
Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test
Certificate issued by the Manufacturer] : New work ( two or more coats applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
44.4
154
6873
... More
Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc. i/c welding, grinding, buffing, polishing and making curvatute (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts fasteners etc.)
39.02
695
27147
Evaluation Notes How It Works ?
Potential Partner