Municipal Corporation Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Municipal Corporation Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date3 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 55,88,855
Costs
EMD
₹ 1,11,777Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SAMC_55533_1Tender No
27/EE/DIV-I/AMC/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://agartalacity.tripura.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying flat brick soling on prepared subgrade (excluding the cost of bricks but including the cost of binding materials) according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412
990
60
60192
... More
Providing and laying brick on edge flooring in cement mortar including cement slurry etc. complete. In cement mortar 1 : 4 ( 1 cement : 4 fine sand ).
2
1345
2691
... More
Brick edging laid in full brick width. Providing and laying brick edging on prepared subgrade
according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412.
5
252
1262
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
32.4
9938
322011
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
14.85
11355
168632
... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement.-All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
18.72
11693
218902
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars of grade Fe-500D or more
1684.8
103
175051
... More
Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings,bases for column etc. for mass concrete with timber plank
0.2
333
67
... More
First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
30.83
9845
303483
... More
Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
84.6
1311
110978
... More
Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates and similar works, all complete.
2970
142
422631
... More
Finishing with Epoxy paint (two or more coats) of approved brand and manufacture at all locations prepared and applied as per manufacturer's specification including appropriate priming coat, preparation of surface etc. complete [Payment shall be made after submission of Test Certificate issued by the Manufacturer]. On steel work.
99
164
16325
... More
12 mm cement plaster of mix. cement mortar 1:4 ( 1 cement : 4 fine sand ). With neat cement punning.
3.45
281
969
... More
80 mm thick factory made c.c. interlocking paver block of M-35 Grade. Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/
direction of the Engineer -in-Charge: (a) 80 mm thick c.c. paver block of M-35 grade with approved colour, design and pattern.
1650
1552
2560800