The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Opening Date26 Dec 2024
Closing Soon10 Jan 2025
Tender Amount₹ 12,46,327 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete

2

10225

20450.8

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

2

18178

36356.8

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Supplying, laying, fixing and commissioning the SWR pipes of Prince / Sudhakar / Kisan / Supreme or any ISI Brand SWR Pipe (as per ISI - standards) Type - A pipes (PVC / SWR pipe - 4Kg / sq.cm ) for rain water and vent pipes of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings - For 110mm dia 3M Double socket pipe

10

1055

10553

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Supply of PVC Bib cock

50

136

6815

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Supply and fixing of 15 mm brass body CP finish bib Cock of not less than 400 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931

20

335

6710

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Construction of 450mm x 450mm and 450mm depth Inspection Chamber with CC 1:4:8 base of 150mm thick 40 mm Crushed Granite metal and 225 mm thick Brick masonary walls in CM 1:6 with fly ash bricks of size 225 x 100 x 60mm with 50kg/Sq. Cm Compressive strength and plastering with CM 1:4; 12mm thick including rendering the surfaces smooth both inside and outside and channelling to required slope including supply and fixing precast RCC 1:2:4 cover of 50mm thick and 600 X 600mm size with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal, including earthwork excavation to the required depth etc; complete for finished item of work (but excluding cost of cement steel and its fabrication charges.)

5

3116

15583.7

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Providing 1.40M height G.I chain link wire mesh fencing with Hot dipped Galvanized Iron chain link mesh 8 gauge (4.0 mm) as per IS 2721 - 1979 (50mm x 50mm) 1.40m height , fixed with MS flats of size 50x6mm (@ 2Nos. on Each post) with 4No.s of 12mm dia bolts on Each posts, on precast RCC fencing post of size 150mm Square at bottom, 125mm square at top @2.50m c/c, with support posts/corner posts of size 100mmx100mmx2000mm at every 5th fencing post and grouting the posts in CC 1:5:10, base of 450x450x 600mm, and support posts/corner posts in cc 1:5:10 base of 450x450x 450mm including earth work excavation, including cost of all material like precast RCC posts, CC 1:5:10, bolts,washers, nuts, all labour charges etc., complete for finished item of work as per drawing and as directed (but excluding cost of G.I. Chain link mesh, M.S. Flat, Steel reinforcement and its fabrication charges, Hooks and Cost of Cement) Note:-i) The coarse aggregate for casting precast RCC 1:2:4 fencing posts should be 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded crushed granite metal and concrete is to be machine mixed and CC 1:5:10 concrete should be with 40mm crushed granite metal. ii). Basement is to be measured and paid separately , if provided

100

431

43146

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Acrylic exterior emulsion Painting to Old walls 2 coats with Grade-II i.e., Ace or equivalent paint of Approved Make complete for finished Item of work For External Walls

500

104

52000

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Oil bound Distempering to Old walls with 2 coats of Approved Make distemper complete for finished Item of work.

300

67

20220

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Colour washing to OLD WALLS with Surya Cem / Equivalent Cem adding required colour two coats complete for finished Item of work.

500

28

14000

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;White washing to Old walls with Surya Cem / Equivalent Cem, two coats complete for finished item of work.

1500

26

39300

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.

250

170

42700

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Painting to wood work/ Plastered Surfaces with Two coats of synthetic enamel paints of grade II of Approved Make, shade- to old works - complete for finished item of work.

100

115

11510

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Flooring with Non-skid Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement )

25

855

21398.75

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Flooring 30mm thick with CC 1:2:4 using 10mm size crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )

75

257

19275

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Providing and fixing Thermocole False ceiling 600mmx 600mm using 19mm thick Thermocole sheet, anodised Aluminium Tee sections of size 24.50mm x 24.0mm x 2.4mm in grid with cross tee of size 24mm x 24.5mm x 2.4mm at every 600mm c/c and anodised aluminium wall angle of size 24mm x 24mm x 2.4mm fixed to periphery of the wall and the above grid is suspended at every 1200mm c/c in both directions using 2.0mm thick GI Wire including cost and conveyance of all materials to site etc., for finished item of work as directed. Holding down clips to be used for fixing Thermocole sheets.

30

639

19194

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)

190

796

151411

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

150

142

21306

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.

10

6494

64940.3

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality inclusive of shuttering/centering charges for bed blocks, encasing joists/ rails, holdfasts of doors and windows, etc. Complete (But Excluding Cost of Cement) - with concrete mixer (CA : 0.90 Cum, FA:0.45Cum)

30

5238

157148.7

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

2

13984

27968.8

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Pedestals. (Effective length of which does not exceed 3 times the least lateral dimension).

5

8217

41085.45

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Raft.

10

7592

75926.9

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls

30

393

11793

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)

35

4093

143279.15

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Cement Concrete 1:5:10 with 40 mm size Crushed Granite metal of approved hard quality in foundations or Plinth etc., Complete. (But Excluding Cost of Cement) - with concrete mixer

20

4050

81011.8

... More
M R works to buildings and structures at KCHP, Area Workshop, PO/PKOC Office and 132KV Substation fo;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

150

243

36480



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.