The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Civil And Construction
Bridge Construction
Opening Date7 Aug 2023
Closing Date22 Aug 2023
Tender Amount₹ 13,39,850 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Conveyance charges of Steel including loading, unloading and stacking charges for Beyond 5KM and upto 30KM(Rate/KM) lead.

24

10

242.4

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.

3

317

953.16

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Varnishing/French Polishing to wood work - 2 coats - complete for finished item of work

4

184

737.6

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.

10

170

1708

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door Closer Hardwyn make (IS: 3564) with double speed adjustment with necessary accessories and screws etc. complete (Type-3: for width of doors 851mm to 1000 mm)

1

1483

1483.8

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Providing and fixing Thermocole False ceiling 600mmx 600mm using 19mm thick Thermocole sheet, anodised Aluminium Tee sections of size 24.50mm x 24.0mm x 2.4mm in grid with cross tee of size 24mm x 24.5mm x 2.4mm at every 600mm c/c and anodised aluminium wall angle of size 24mm x 24mm x 2.4mm fixed to periphery of the wall and the above grid is suspended at every 1200mm c/c in both directions using 2.0mm thick GI Wire including cost and conveyance of all materials to site etc., for finished item of work as directed. Holding down clips to be used for fixing Thermocole sheets.

9

639

5758.2

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means

200

34

6900

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Brushing of existing concrete surface with wire brush and providing cement concrete 1:2:4 screed of an average thickness of 20mm using 6mm size crushed granite metal of approved hard quality, and providing 2 layers of 30 guage rabbit wire mesh in the CC screed as nominal reinforcement and plastering with CM 1:4, 12mm thick including admixing of approved impervious water proofing compound as per manufacturers specification or @ 2% by weight of cement and finishing smooth and including providing slopes to drain off water etc., complete as directed (But Excluding Cost of Cement )

16.5

297

4916.67

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Providing contraction sawn joints at every 4.50 m distance or as directed by Engineer In charge by grooving with mechanical saw, the width of 3 to 5mm and depths 1/3rd to 1/4th of thickness of concrete and operation should be carried out as soon as concrete is ready to accept the saw cut without trowelling including providing dowel bars of Required dia, length and spacing as per design and covered with thin plastic sheathing of 2/3 length. The joint shall be filled with polymer based fillers and sealants as shown in the drawing and including cost and conveyance of all materials to work site, Labour charges, etc., complete for finished item of work and as directed by the Engineer-in-charge (excluding the cost of dowel bars and their fabrication required which will be paid separately). Note: All relevant MORT and H / IRC codes to be followed.

65

84

5460

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Cement Concrete M-30 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal including cost and conveyance of all materials to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (Excluding cost of Cement) for CC Pavements. Cement @ 400Kg/Cum of concrete is to be used. (CA : 0.90 Cum, FA:0.45Cum) Note:- In case of provision of steel reinforcement, fabrication charges for the same are to be paid separately.

60

3749

224997

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Cement Concrete 1:4:8 with 40mm down size (Crushed Granite metal of approved hard quality including machine mixing and vibrating with mechanical vibrator finishing to the required camber for CC Pavement sub grade including necessary side shuttering etc., Complete for finished Item of work as directed ( Excluding Cost of Cement).(CA : 0.90 Cum, FA:0.45Cum)

45

3475

156404.25

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Material required per Cum : 45 to 22.4 mm metal -0.396 cum; 22.4mm to 2.36mm metal - 0.528cum; 2.36mm to 75microns metal - 0.396Cum) By Manual Means

75

2523

189265.5

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Construction of embankment / Shoulders with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted as per Technical specification 305 of MORT and H

175

134

23485

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Excavation for Road work in soil with Hydraulic Excavator 0.9cum bucket capacity including cutting and loading in tippers / pushing the earth to side of embankment (by trench cutting) including trimming bottom and side slopes, in accordance with requirements of lines and grades and cross sections as per technical specification 301 of MORT and H

200

68

13620

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and laying of 3 runs of 4 sq.mm 1100 v grade PVC insulated flexible copper cable ( Phase, Neutral & Earth) in existing metallic / Non -Metallic conduit pipe for run of circuit/power mains including copper lugs complete

60

205

12318

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and fixing of 8Way SPN distribution board concealed in wall with din rail suitable for any combination of single pole outgoing MCB s in sheet steel enclosure on wall with 1 no 32A, 2pole 100mA ELCB and 6 NOs of 6-32 Amps Single pole MCBs including connections, all masonry work complete

1

7657

7657.7

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and laying of 3 runs of 2.5 sq.mm 1100 v grade PVC insulated flexible copper cable ( Phase, Neutral &Earth) in existing metallic / Non - Metallic conduit pipe for run of circuit / Power mains including copper lugs complete

80

157

12608

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Providing independent earthing for Important equipment with 40mm dia B class 2.5m long G.I pipe and 40mm dia B class 2.5 m long G.I pipe and 19mm dia B class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C./Brick masnory Chamber of 450mm X 450mm X 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg salt and 40Kg charcoal or or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40mm X 6mm X 200mm length with all accessories and labour charges complete as per IS specifications 732/1982 9Part II) Note:Whenever providing full length of electrode is not possible due to obstruction of water tube/rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance

2

5525

11050.2

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and fixing MODULAR type 16A one module ISI marked 5 pin pin socket with MODULAR type 16A SP switch and GI box covered with suitable white cover plate and concealed in wall complete

4

867

3468

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and Wiring with 3 runs of 1.0 sq.mm 1100 V grade PVC insulated flexible copper conductor cable (phase,nuetral & earth) in the existing P.V.C conduit pipe with MODULAR type 6A ISI marked 5 pin Pin MODULAR Type socket with MODULAR Type 6A switch control and with GI Box and White Front plate concealed in wall complete with all accessories (fixing on seperate board)( MDS Type).

4

1035

4143.2

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and Wiring with three runs of 1.0 sq.mm (14/0.3mm) 1100 V grade PVC insulated flexible copper conductor cable (phase,nuetral & earth) in the existing P.V.C conduit pipe with 6A flush type ISI marked MODULAR type Control switch, MODULAR 120W step Type electronic hum free fan regulator, GI Box and white Front plate concealed in wall complete for fan pont ( MDS Type).

2

1579

3159.2

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and Wiring with three runs of 1.0 sq.mm (14/0.3mm) 1100 V grade P.V.C insulated flexible copper conductor cable (phase, neutral & earth) in the existing P.V.C conduit pipe with 6A flush type ISI marked MODULAR type switch/bell push with GI box and white front plate concealed in wall and ceiling Rose/Slant accessories as necessary complete for light , bell, exhaust fan points(MDS Type).

10

1019

10198

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and fixing of 25mm dia, heavy guage recessed/concealed ISI marked PVC conduit pipe along with reinforcement laid into wall/slab with all required accessories wherever necessary including masonry work for circuit main/sub-mains/15 A power circuit/Telephone/TV points complete

40

105

4212

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Providing skirting /risers of steps with ceramic wall tiles of size 200 x 300mm / 245mm x 325mm with 6 mm thick 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring tiles, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

1.2

525

630.91

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Flooring with Non-skid Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement )

9

863

7768.44

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supplying and fixing 4mm thick pin headed glass panes saint gobain / modi guard or equivalent make including putty / wooden beading / Rubber beading for wooden / iron windows.

4

934

3738

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Labour charges for making and fixing Aluminium Windows/ Ventilators as per approved drawing with aluminium anodized sections including cost of screws, bolts and nuts, beeding, weather strip, etc., excluding cost of aluminium sections and fixtures. The rate includes labour charges for fixing of glass/ particle boards.

6

877

5265

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supplying Aluminium anodised Sections of approved make for Doors, partitions, windows, Ventilators (including anodisation cost) Confirming to IS 11857-1986

25

348

8720

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and fixing Flush door shutters, solid bond wood block board type with teak ply on both faces.: 30 mm thick conforming to IS:2202 as per Approved Make including the following Aluminium anodised fittings : conforming to relevant IS standards : Single Shutter a) 3 nos. 150 mm long butt hinges. b) 2 nos. 200 mm to 250 mm long tower bolt with 10mm dia shoot. ; c) 1 no. 300mm long aldrop with 16mm dia shoot. d) 2 no. 100 mm to 150 mm long grip handle. e) 1 no. foot door stopper.

1.8

3543

6378.66

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Supply and fixing Door frame of 100 x75mm with Medium teak wood including supply and fixing with 6nos. M.S.Z type hold fasts made out of 50x3mm M.S.flat 300mm long in CC beds, etc., complete. (Excluding Cost of Bed Blocks.)

6

1050

6305.4

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete

0.1

9089

908.92

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

0.1

14770

1477

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Erection of compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete

150

8

1200

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Fabrication of steel works like compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete including cost of welding rods, power charges etc., complete.

150

18

2730

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.

150

5

855

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)

150

34

5115

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Whiting to New ceiling with Surya cem / Equivalent Cem, two coats complete for finished item of work.

10

43

433

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

2

13984

27968.8

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Providing gultha in CM 1:6, 20 mm thick and 150 mm wide including necessary scraping of wall and finishing the surface as directed ( But Excluding Cost of Cement )

10

33

339.1

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;20 mm thick plain cement mortar bands in cement mortar 1:4 up to 300 mm in width for elevations and drip moulds etc.,- Raised Band (But Excluding Cost of Cement )

1

598

598.09

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Oil bound Distempering to New walls with 2 coats of Approved Make distemper over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work.

40

130

5216

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Colour washing to new walls with Surya Cem / Equivalent Cem, adding required colour two coats complete for finished Item of work.

80

42

3360

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Plastering to Ceiling with cement mortar 1:3, 12mm thick ( But Excluding Cost of Cement )

10

164

1649.5

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

120

151

18126

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.

10

6754

67545.6

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Flooring 40mm thick with CC1:2:4 using 20mm Down size ( 65% of 20-10mm and 35% of 10 - 4.75mm ) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )

65

282

18365.75

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)

45

3653

164396.25

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For roof Slab - up to 150mm thick.

2

8395

16791.5

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For roof Beams.

1

9731

9731.25

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Sunshades.

0.5

14821

7410.98

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Lintels.

0.5

10436

5218.32

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Plinth Beams / Brace beams.

1

9853

9853.35

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Columns.

2

10458

20917.3

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Pedestals. (Effective length of which does not exceed 3 times the least lateral dimension).

7

7776

54436.55

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Column Footings / Raft.

5.5

7152

39337.38

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer

15

3610

54152.25

... More
CONSTRUCTION OF ROOM AND LAYING OF FOUNDATION BEDS APPROACH ROAD FOR SHIFTING OF EXISTING WEIGH BRID;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

75

243

18240



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.