The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Road Construction
Opening Date26 Aug 2022
Closing Date17 Sep 2022
Tender Amount₹ 10,83,206
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
347619Bid Award Id
ViewTender No
BHP/CVL/ET-05/2022-23 2nd CallTender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
PRE MONSOON WORKS SUCH AS STRENGTHENING OF CROSS DRAINAGE WORKS SIDE BERMS DESILTING OF NALAS ETC FO;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
60
-
219195
PRE MONSOON WORKS SUCH AS STRENGTHENING OF CROSS DRAINAGE WORKS SIDE BERMS DESILTING OF NALAS ETC FO;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
55
-
198558.25
PRE MONSOON WORKS SUCH AS STRENGTHENING OF CROSS DRAINAGE WORKS SIDE BERMS DESILTING OF NALAS ETC FO;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means
100
-
3450
PRE MONSOON WORKS SUCH AS STRENGTHENING OF CROSS DRAINAGE WORKS SIDE BERMS DESILTING OF NALAS ETC FO;Earthwork excavation by machinery where Mass excavation with large quantity is involved for buildings, major pipe line works, etc., in all soils up to SDR and stone matrix including cutting and loading in tippers with all lifts etc., complete
7030
-
478743
PRE MONSOON WORKS SUCH AS STRENGTHENING OF CROSS DRAINAGE WORKS SIDE BERMS DESILTING OF NALAS ETC FO;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
200
-
48640