The Singareni Collieries Company Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Civil Works Others
Opening Date5 Mar 2025
Closing Date26 Mar 2025
Tender Amount₹ 35,62,143
Costs
EMD
₹ 39,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
579293Tender No
RG-I/CVL/ET-191(56)/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;White washing to New walls with Surya Cem / Equivalent Cem two coats complete for finished item of work.
220
39
8646
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
220
141
31163
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.
23
6662
153232.67
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
5
13984
69922
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Conveyance charges of Steel including loading, unloading and stacking charges for Beyond 5KM and upto 30KM(Rate/KM) lead.
10.82
10
109.3
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.
26.52
317
8425.93
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Conveyance charges of Earth for 1 KM lead.
180
40
7272
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.
400
170
68320
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Flooring 50 mm thick with CC 1:2:4 using 20mm Down size (65% of 20-10mm and 35% of 10 - 4.75mm) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. (But Excluding Cost of Cement )
570
293
167471.7
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
31
3081
95517.82
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)
662
796
527547.8
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete
10.82
10225
110659.28
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
10.82
18178
196726.64
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Pedestals. (Effective length of which does not exceed 3 times the least lateral dimension).
38
7268
276208.7
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - for Column footings / Raft
9
6644
59798.25
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
71
3022
214570.52
... More
Construction of open shed back side of Sammakka Saralamma Temple in connection with development of E;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
180
243
43776
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%