The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date13 Nov 2024
Closing Soon2 Dec 2024
Tender Amount₹ 23,78,279 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.

10

5991

59917.5

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)

170

796

135473

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete

2

9089

18178.4

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

2

14770

29540

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete

2

10225

20450.8

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

2

18178

36356.8

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Supply of Structural Steel Angles/Channels/Beams/ Square Bars for the month of January - 2023(Inclusive of 13.615% CP and OH)

0.1

69305

6930.52

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.

100

5

570

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)

100

34

3410

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Supply of Centrifugally cast (spun) ductile iron fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/ IS 9523/2000) - For Up to 500mm Dia pipe line

420

119

50106

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.

120

170

20496

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Acrylic exterior emulsion Painting to New walls with Grade-I i.e., Apex or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work For External Walls

220

183

40458

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;White washing to New walls with Surya Cem / Equivalent Cem two coats complete for finished item of work.

300

39

11790

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Providing impervious coat 12 mm thick for Brick/CC/RCC walls etc., with CM1:3, mixed with Approved Make of water proofing compound at the rate of 1Kg per bag of cement and rendering smooth, rounding off junctions of walls as directed including cost and conveyance of all materials and water etc., and operational , incidental, Labour charges etc., ( But Excluding Cost of Cement ) complete for finished item of work.

360

155

56001.6

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Plastering 15 mm thick Two Coats with Base Coat of 11mm thick in cement mortar 1:6; and top coat of 4mm thick in CM 1:4 with sponge finishing etc., ( But Excluding Cost of Cement ) Complete for walls only

220

310

68292.4

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

20

13984

279688

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For Side Walls up to above 200mm but upto 300mm thick.

48

11590

556354.56

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For RCC Machinery beds.

45

7003

315153.9

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For Plinth Beams / Brace beams.

8

9704

77636.16

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For Columns.

10

10309

103098.2

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For Pedestals. (Effective length of which does not exceed 3 times the least lateral dimension).

3

7627

22883.46

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For Column Footings / Raft.

42

7003

294143.64

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer

30

3461

103839.6

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means

100

34

3450

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

75

243

18240

... More
Construction of 1.00 lakh gallons capacity RCC GL storage water tank near CHP OCP III;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth

150

119

17925



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.