The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Housekeeping Services
Repair and Maintenance
Civil Works
Opening Date2 Mar 2022
Closing Date17 Mar 2022
Tender Amount₹ 89,45,531 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance;Cost of planting material (d) Group ornamental plants For renovation in green park

1000

-

45000

... More
Maintenance;Cost of planting material (c) Individual ornamental plants For renovation in green park

1000

-

55000

... More
Maintenance;Cost of planting material (b) Hedge For renovation in green park, Bungalows area and GM office

2215

-

312315

... More
Maintenance;Cost of planting material (a) Lawn For renovation in green park

1300

-

214500

... More
Maintenance;Industrial Allowance

72.24

-

72.24

... More
Maintenance;Planting the bag / pot plants in pots without disturbing root system.

200

-

361.2

... More
Maintenance;Industrial Allowance

126

-

126

... More
Maintenance;Removal of plants and soil from existing pots and cleaning the pots for re-potting

200

-

630

... More
Maintenance;Industrial Allowance

1596

-

1596

... More
Maintenance;Filling of pots with soil mixture and transplanting in to pots(0.03 cmt soil mixture)

200

-

7980

... More
Maintenance;Industrial Allowance

84

-

84

... More
Maintenance;Placing pebbles, sand etc., while filling pots including cost and transportation of material.

200

-

420

... More
Maintenance;Cost of soil mixture: The soil mixture should be in 3:1:1 ratio of red soil, sand and well decomposed FYM in powdering form. (0.03 cmt soil mixture)

200

-

1874.46

... More
Maintenance;Cost of cement/ plastic/ earthen/ porcelain flower pots.

200

-

40000

... More
Maintenance;Industrial Allowance

1348.94

-

1348.94

... More
Maintenance;Planting the hedges by arranging the plants with the ball of earth intact in the trench in staggered manner @12 plants/Rmt and refilling the trench with soil mixture.

2215

-

6744.68

... More
Maintenance;Industrial Allowance

4688.71

-

4688.71

... More
Maintenance;Preparation of soil mixture in 3:1 ratio using the dug up soil including cost and conveyance of FYM.

2215

-

23443.56

... More
Maintenance;Industrial Allowance

4353.8

-

4353.8

... More
Maintenance;Digging of 30Cm wide and 30Cm deep running trench (0.09 Cmt earth work/Rmt.)

2215

-

21769.02

... More
Maintenance;Industrial Allowance

122.22

-

122.22

... More
Maintenance;Alignment of hedges 2215 rmt ( 875 in Green park , 755 in Bungalows area and 585 in GMM office )

2215

-

611.12

... More
Maintenance;Industrial Allowance

3088.26

-

3088.26

... More
Maintenance;Dibbling cost of any lawn grass at 10cm X 10 cm espacement including preparation of grass slips ramming.

3870

-

15441.3

... More
Maintenance;Industrial Allowance

1609.15

-

1609.15

... More
Maintenance;Cost of spreading of soil and soil mixture including watering and rolling/ ramming @15cmt per 100M2

3870

-

8045.73

... More
Maintenance;Industrial Allowance

32656.69

-

32656.69

... More
Maintenance;Preparation of soil mixture including cost and conveyance of materials: Supply of 10cmt. red soil with specifications of item no. 1.5 and supply of 5cmt of soil mixture comprising of red soil and sand in 3:2 ratio and addition of 10 Kg DAP + 50 Kg Neem cake + 2Kg Folidol. ----In total 15cmt + additives for 100 sq.mt area

3870

-

163283.43

... More
Maintenance;Industrial Allowance

411.77

-

411.77

... More
Maintenance;Collection of weeds and unwanted inert material after ploughing and keeping the collected material outside the site to facilitate transportation. (Only for ploughed areas with heavy weed infestation)

3870

-

2058.84

... More
Maintenance;Industrial Allowance

1745.68

-

1745.68

... More
Maintenance;Digging and pulverizing soil to a depth of 30Cm where existence of noxious weed like Cynodon / Cyprus etc., is severe and removal of all weed growth and inert material (where ploughing is not done)

3870

-

8728.4

... More
Maintenance;Industrial Allowance

872.84

-

872.84

... More
Maintenance;Digging and pulverizing soil to a depth of 15Cm and removal of all weed growth and inert material (where ploughing is not possible)

3870

-

4364.2

... More
Maintenance;Painting to Old flower pots: Oil bound distempering one coat including cost, conveyance, labour charges etc. Complete for finished item of work.

200

-

2100

... More
Maintenance;Painting to New flower pots: Distempering with oil bound distemper of approved brand and shade 2 coats including cost, conveyance, labour charges etc. Complete for finished item of work.

100

-

1574

... More
Maintenance;Refilling with sand in play areas after removal of existing sand which is mixed with soil â??up to 15cm depthâ?? 0.15 cmt/ sq.m

230

-

130048.9

... More
Maintenance;Filling with sand in play areas: Removal of soil in the proposed play area up to 30cm depth and filling with good quality sand (30 cm layer) after erection of play material --- 0.30 cmt / sq.m

230

-

83453.2

... More
Maintenance;Hiring of JCB

50

-

60000

... More
Maintenance;CMPF Amount

41438.71

-

41438.71

... More
Maintenance;Bonus Amount

27137.14

-

27137.14

... More
Maintenance;Contractor Profit

35291.31

-

35291.31

... More
Maintenance;EPS Amount

22804.32

-

22804.32

... More
Maintenance;Engaging of Skilled person as a Computer Operator for office works (or) as a Technical Maistry for attending Nursery/ Horticulture and other Afforestration works of the area (Specifically to be mentioned in the Note)

528

-

325776

... More
Maintenance;Supply (Cost and transportation) of well de-composed Farm Yard Manure (FYM)

10

-

21000

... More
Maintenance;Cost of Tools and implements like Hose pipes, spades, sickles, sprayers, crowbar, secateurs etc.

32540

-

146430

... More
Maintenance;Cost of fertilizers, insecticides/Fungicides (Area of Park or Garden shall be considered including all the components of greenery)

32540

-

81350

... More
Maintenance;CMPF Amount

612339.78

-

612339.78

... More
Maintenance;Bonus Amount

401005.53

-

401005.53

... More
Maintenance;Contractor Profit

521499.75

-

521499.75

... More
Maintenance;EPS Amount

336979.44

-

336979.44

... More
Maintenance;Maintenance of lawn, hedge, ground cover, individual ornamental plants, etc., including protection, watering daily except on rainy days, application of fertilizers and pesticides whenever necessary, carrying out of weeding, moving, etc., operations whenever necessary and sweeping of fallen leaves on lawn.(Based on minimum wages as circulated by the G.M(Per)).

11016

-

4813992

... More
Maintenance;Transport of the waste material collected from the park/gardens, up to 5 KM, including loading and unloading.

200

-

73850



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.