The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Agriculture or Forestry Works
Opening Date30 Aug 2024
Closing Date20 Sep 2024
Tender Amount₹ 99,994 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;CONTINGENCIES: Plantation Boards, buckets and other expenses

1

8000

8000

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Clearing unwanted growth to a width of 3 m on both sides parallel to the road (to be done during Nov-Dec) which will create a fireline preventing spread of ground fire from adjacent agricultural field.

1

1473

1473.26

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Replacement of causalities (10% - since watering provision is provided) including opening of pit, internal transportation, planting and refixing the fence (For plantations with brushwood fencing)

20

2888

577.74

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Weeding and forming of saucer (two times - 1st in July and 2nd in September)

200

540

1080.24

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Application of inorganic fertilizers like 25 gms of urea (2 month after planting, i.e. in August) and 50 gms of DAP (4 months after planting, i.e. in October). Fertilizer application shall be made by making 3 holes of 10 cm depth with crow bar at a distance of 20 cm away from plant and putting ferilizer and closing. This work needs to be monitored by Plantation-in-charge Officer at the time of application and needs to be entered in Plantation Journal.

200

260

520.12

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Brush wood fencing (where HDPE self supporting tree guards are not used) fencing around the plant including collection, transportation and fixing at site (size of 1 m dia and 1.5 m height) - Thorny fencing with sturdy thorn material of 10 cm girth (at the butt end) and fixing in crow bar holes and strengthening with stone packing. The fence should be tightened horizontally by tying with thorny reepers leaving at least 1 from the ground to do the weeding by specially designed scrappers. Local tender shall be called for erection of fencing in raising year and, if possible, including maintainance for next 2 years (if planting is taken up without HDPE self supporting tree guard).

100

19876

19876.39

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;WATERING - To be done through tractor-fitted water tanker (preferably by calling tender) with benchmark for survival (90%) and average incremental growth of 1.0 m by end of raising year (i.e. 3.0 m height by end of March of raising year) - irrespective of plantation raised departmentally or through contractor by tender process. Minimum of 15 liter per plant with a Water Tanker - Staff will locate the casualty points under casualty replacement process, if any, and keep the pits ready for replacement before watering, so that the fresh tall plants get established easily. The Plantation-in-charge Officer should record the watering operation in Watering Watch Register and M-Book on the same day of watering. (i) For the plantation raised in June - July: One watering on the day of planting : 1 watering, June - two watering on non rainy days : 2 Waterings, July to September -

3769

829

31255.56

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;PLANTING WITHOUT HDPE SELF SUPPORTING TREE GUARD: Refilling the pits with dug-up soil, planting, forming saucer with a radius of 0.50m radius around the plant and provide support to the plants which should go 18 inside pit along with plant at the time of planting

100

1893

1893.66

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Cost of supporting stake of 2.5 mtr long, sturdy and straight and minimum 10 cm girth at the base (if bamboos are not supplied by Dept).

100

1914

1914.43

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Cost of Fertilizers and pesticides

1

2200

2200

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Internal transportation within the linear distance of plantation site (d) 25 x 40 cm (10x16) bag plants

100

538

538.33

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Transportation of Planting Stock (including loading and unloading) up to distance of 5 km (b) 25 x 40 cm (10x16) bag plants

100

541

541.61

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Digging of pits is to be done preferably by machine by calling tenders. The pit sizes for Avenue Plantations are 60 cm3 /100 cm3. (a) During June - July (ii) 60 cm3 size (0.216 cum) in hard gravelly and moram Soil (Manual)

100

57

5729

... More
Raising and maintenance of avenue plantation under Remediation plan along coal transport route at S;Allignment and Stacking including demarcation of base line (d) 5X5 m espacement = 400 planting points

100

140

140.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.