The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Civil Works Others
Opening Date30 Aug 2024
Closing Date13 Sep 2024
Tender Amount₹ 10,05,700
Costs
EMD
₹ 11,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
539760Tender No
RG2/CVL/ET-83/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Painting with two coats of Red oxide iron primer paint of grade-1 of Approved Make to Old Iron work - complete for finished item of work.
200
96
19260
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Painting / priming coat with Red oxide iron primer paint of grade-1 of Approved Make to Old Iron work - complete for finished item of work.
200
60
12060
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means
100
34
3450
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Flooring 40mm thick with CC1:2:4 using 20mm Down size ( 65% of 20-10mm and 35% of 10 - 4.75mm ) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )
288
275
79421.76
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
190
151
28834.4
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.
15
6481
97218.45
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete
4
9089
36356.8
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
4
14770
59080
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete
9
10225
92028.6
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
9
18178
163605.6
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls
130
393
51103
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
27
3483
94061.52
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality inclusive of shuttering/centering charges for bed blocks, encasing joists/ rails, holdfasts of doors and windows, etc. Complete (But Excluding Cost of Cement) - with concrete mixer (CA : 0.90 Cum, FA:0.45Cum)
8
4628
37026.88
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
35
3440
120423.1
Formation of open shed with old steel materials at Mahatma Gandhi nagar;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
40
243
9728
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements