The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Building Construction
Opening Date10 Oct 2024
Closing Soon24 Oct 2024
Tender Amount₹ 14,58,208 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 15.90mm OD Pipe - SDR 11

30

191

5748

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter â?? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 x 45mm)/(80x 52mm) x 2.20mm for outer frames, (58x 39mm)/(54x 38mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2mm prefabricated and welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42x 25mm)/(52x 21.5mm) x 2.0mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash and Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

15

8088

121324.5

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Rate for conveyance of RCC socket and spigot pipes on all weather roading including loading Unloading and stacking (per metre of effective length)(for NP2 pipes).(Rate for every additional 1 Km. lead or part there of beyond 5KM initial lead is only payable) - For 200 mm Dia pipes

500

-

360

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supplying, laying, jointing RCC NP2 hume pipes (socket and spigot) confirming to IS 458/2003, with necessary rubber rings (as per IS 5382/1985) cost and conveyance of all materials to site, labour charges, all operational charges etc complete as directed for finished item of Work For 150mm dia Pipes. NOTE:- Transportation of pipes includes up to 5 KM from Factory. For any extra lead, necessary extra lead charges may be added.

20

454

9098

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supply of Structural Steel plates for the month of June - 2023(Inclusive of 13.615% CP and OH)

0.3

77258

23177.46

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supply of Structural Steel Angles/Channels/Beams/ Square Bars for the month of June - 2023(Inclusive of 13.615% CP and OH)

0.5

69305

34652.6

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.

300

5

1710

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)

500

34

17050

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete

1

9089

9089.2

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

1

14770

14770

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete

2

10225

20450.8

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

2

18178

36356.8

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Acrylic exterior emulsion Painting to Old walls 2 coats with Grade-II i.e., Ace or equivalent paint of Approved Make complete for finished Item of work For External Walls

1000

104

104000

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Plastic emulsion Painting to Old Internal walls with paint of Approved Make, two coats complete for finished Item of work. - For Internal Walls

400

75

30280

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Oil bound Distempering to Old walls with 2 coats of Approved Make distemper complete for finished Item of work.

300

67

20220

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Colour washing to OLD WALLS with Surya Cem / Equivalent Cem adding required colour two coats complete for finished Item of work.

1000

28

28000

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Colour washing to new walls with Surya Cem / Equivalent Cem, adding required colour two coats complete for finished Item of work.

500

42

21000

... More
Maintenance and repair works to various structures at Base workshop at OCP III;White washing to Old walls with Surya Cem / Equivalent Cem, two coats complete for finished item of work.

1000

26

26200

... More
Maintenance and repair works to various structures at Base workshop at OCP III;White washing to New walls with Surya Cem / Equivalent Cem two coats complete for finished item of work.

500

39

19650

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Painting / priming coat with Red oxide iron primer paint of grade-1 of Approved Make to New Iron work - complete for finished item of work.

30

63

1899

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.

200

170

34160

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Painting to wood work/ Plastered Surfaces with One coat of synthetic enamel paints of grade -II of Approved Make and shade - to New or old works - complete for finished item of work.

120

68

8220

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supply and fixing Flush door shutters, solid bond wood block board type with teak ply on both faces.: 30 mm thick conforming to IS:2202 as per Approved Make including the following Aluminium anodised fittings : conforming to relevant IS standards : Single Shutter a) 3 nos. 150 mm long butt hinges. b) 2 nos. 200 mm to 250 mm long tower bolt with 10mm dia shoot. ; c) 1 no. 300mm long aldrop with 16mm dia shoot. d) 2 no. 100 mm to 150 mm long grip handle. e) 1 no. foot door stopper.

15

3543

53155.5

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supply and fixing Moulded panel solid core flush doors using water-resistant hardwood fibre HDF / MDF fibre boards skins of 2.5 mm thick of 35 mm thick with following Aluminium anodised fittings - Single Shutter a) 2no.of 300mm long aldrop with 16mm dia shoot. b) 1 nos. 200 to 250mm mm long tower bolt with 10mm dia shoot. c) 2 no. 100 mm to 150 mm long grip handle. d) 3 nos.150 mm long butt hinges. ; e) 1 no. foot door stopper

10

3220

32200

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supply and fixing Door frame of 100 x75mm with Non teak wood including supply and fixing with 6nos. M.S.Z type hold fasts made out of 50x3mm M.S.flat 300mm long in CC beds, etc., complete. (Excluding Cost of Bed Blocks.)

30

738

22167

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Supply and fixing of Cement Bonded Particle Board (IS 14862) door shutters using with 16MM thick with all round style â??Uâ?? lipping size of 20mm x18mm x20mm made from 0.6mm thick galvanized pre-painted cold rolled steel profiles with Cement Bonded Particle Board separating two shutter with 30mm x20mm x30mm Stepped lipping including cost and conveyance of all materials at site and applying one coat of primer, 2 coats of luppam and 2 coats of synthetic enamel paint as per approved design for finished item of work - BISON PANEL(IS 14276) DOUBLE DOOR SHUTTER with necessary screws fixed at every 1foot (304.8mm) intervals and including the following MS powder coated fittings. etc., complete finished item of work as per Approved Make a). 250 mm long aldrops 2nos. b). 250mm long tower bolt with 10mm dia shoot- 2nos c). 2nos 125 mm long grip handle d) 2 Nos. Door Stopper

20

2308

46162

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Providing Dadooing to walls with ceramic wall tiles of size 300x450mm / 320mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

30

820

24626.7

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Providing Dadooing to walls with ceramic wall tiles of size 200x300mm / 245mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

30

695

20870.7

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Providing skirting /risers of steps with ceramic wall tiles of size 200 x 300mm / 245mm x 325mm with 6 mm thick 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring tiles, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

10

526

5264.9

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Flooring with Non-skid Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement )

50

863

43194.5

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Flooring 50 mm thick with CC 1:2:4 using 20mm Down size (65% of 20-10mm and 35% of 10 - 4.75mm) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. (But Excluding Cost of Cement )

60

313

18802.2

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Flooring 40mm thick with CC1:2:4 using 20mm Down size ( 65% of 20-10mm and 35% of 10 - 4.75mm ) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )

50

276

13830

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Providing and fixing Thermocole False ceiling 600mmx 600mm using 19mm thick Thermocole sheet, anodised Aluminium Tee sections of size 24.50mm x 24.0mm x 2.4mm in grid with cross tee of size 24mm x 24.5mm x 2.4mm at every 600mm c/c and anodised aluminium wall angle of size 24mm x 24mm x 2.4mm fixed to periphery of the wall and the above grid is suspended at every 1200mm c/c in both directions using 2.0mm thick GI Wire including cost and conveyance of all materials to site etc., for finished item of work as directed. Holding down clips to be used for fixing Thermocole sheets.

60

639

38388

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)

100

796

79690

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Plastering to brick / stone masonry with cement mortar 1:6, 20 mm thick in two coats including raking out of joints for walls only ( But Excluding Cost of Cement )

20

316

6332.2

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Plastering 15 mm thick Two Coats with Base Coat of 11mm thick in cement mortar 1:6; and top coat of 4mm thick in CM 1:4 with sponge finishing etc., ( But Excluding Cost of Cement ) Complete for walls only

50

310

15521

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

60

151

9117.6

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Construction of Flyash brick masonry drain with bricks of size 225x 100 x 60mm with 50Kg/cm2 compressive strength 300mm wide and 300mm deep with brick work in CM 1:6, with 225mm thick with brick walls, including excavation, and laying of 100mm thick and 900mm wide CC 1:5:10 bed, with 40 mm Crushed Granite metal, plastering the surfaces with CM 1:6; 12mm thick including finishing smooth with trowel etc., ( But Excluding Cost of Cement ) complete.

50

1478

73915.5

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.

10

5991

59917.5

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.

5

6709

33548.4

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded crushed granite metal of approved hard quality for precast RCC slabs, purlins, verandah posts, fencing posts etc. including machine mixing of Concrete, necessary shuttering, finishing etc including hoisting/fixing, cost and conveyance of all materials to work site, all labour charges, all operational incidental charges (excluding cost of steel and its fabrication charges and cost of cement) etc., complete for finished item of work, as directed. (CA : 0.90 Cum, FA:0.45Cum)

5

6779

33899.6

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

0.5

13984

6992.2

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Cement Concrete 1:1.5:3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded crushed granite metal using machine mixing and vibrating inclusive of shuttering/centering charges for bed blocks and arch key of mine arches Complete (But Excluding Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum)

5

4808

24042.6

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls

50

393

19655

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)

15

3504

52566.3

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer

8

3461

27690.56

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) - by Manual Means

50

1607

80355

... More
Maintenance and repair works to various structures at Base workshop at OCP III;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

80

243

19456



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.