The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Building Construction
Opening Date21 Dec 2024
Closing Date4 Jan 2025
Tender Amount₹ 6,90,303 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.

1

317

317.72

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Conveyance charges of Earth for 5 KM lead.

30

107

3234

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Conveyance charges of Earth for 1 KM lead.

60

40

2424

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.

32

5888

188419.2

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Cement Concrete 1:5:10 with 40 mm size Crushed Granite metal of approved hard quality in foundations or Plinth etc., Complete. (But Excluding Cost of Cement) - with concrete mixer

10

3468

34684.7

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Binding wall 225 x 225mm size with brick in cement mortar 1:6 with fly ash bricks of compressive strength 50Kg/cm2 with 20mm thick plastering with cement mortar 1:6, without cornice (But Excluding Cost of Cement )

32

494

15812.8

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Lintels.

0.5

10294

5147.48

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality inclusive of shuttering/centering charges for bed blocks, encasing joists/ rails, holdfasts of doors and windows, etc. Complete (But Excluding Cost of Cement) - with concrete mixer (CA : 0.90 Cum, FA:0.45Cum)

0.5

4656

2328.08

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth

50

119

5975

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)

65

796

51798.5

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Providing skirting /risers of steps with ceramic wall tiles of size 200 x 300mm / 245mm x 325mm with 6 mm thick 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring tiles, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

10

528

5282.7

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means

80

34

2760

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Earthwork excavation by machinery where Mass excavation with large quantity is involved for buildings, major pipe line works, etc., in all soils up to SDR and stone matrix including cutting and loading in tippers with all lifts etc., complete

30

68

2043

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Supply and fixing 12mm thick window shutters with plain Cement bonded particle board (bison panel or equivalent) conforming to IS 14276 with alround U section of size 12x18mm x 12mm made from 0.60mm thick galvanised colour coated cold rolled steel profiles with necessary srews fixed at every 1foot (304.8mm) intervals, fixing to the existing angle iron frame along with the following MS Powder coated fittings of approved make and applying 1coat of primer, one coat of luppam and 2 coats of Synthetic enamel paints as per approved design including cost and conveyance of all materials to site, all labour charges etc., complete for finished Item of work as directed. a) 150mm tower bolts with 10mm dia shoot - 1No.s per leaf b) 125mm long grip handles - 1No. per leaf c) 250mm long window casements- 1No. per leaf d) 200mm to 225mm long T- hinges 2nos per leaf

5

1425

7129

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Flooring with Non-skid Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement )

60

865

51940.2

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete

1

9089

9089.2

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

1

14770

14770

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.

350

5

1995

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)

350

34

11935

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Supply of Structural steel flats for the month of July - 2024 (Inclusive of 13.615% CP and OH)

0.05

69305

3465.26

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Supply of Structural Steel Angles/Channels/Beams/ Square Bars for the month of July - 2024(Inclusive of 13.615% CP and OH)

0.3

68169

20450.7

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Supply, Fabrication and fixing of door frame made of Angle iron of size 40x40x 6mm with one coat of Red oxide grade-I primer with the following MS fittings (Excluding Cost of Bed Blocks)(The Steel Sections etc., required will have to be procured by the contractor only and Steel will not be issued by the department) 1). 6nos. M.S. Z type hold fasts made out of 15x3mm flat of 100mm long fixed in CC 1:2:4 bed blocks (150 x 100x 100mm) 2) 10mm dia tie rod at the bottom with necessary nuts at the ends of Each side 3). 1no.stopper hinge per leaf 75mm medium duty 4). 4 No.s 300mm long T-Hinges

12

466

5595.6

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.

50

170

8540

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Oil bound Distempering to New walls with 2 coats of Approved Make distemper over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work.

100

130

13040

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work -For External Walls

165.97

167

27784.22

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

250

154

38547.5

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls

110

393

43241

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)

30

3511

105347.1

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

10

243

2432

... More
construction of 2 nos vinayaka mandapam Ladnapur R an R;Clearing light jungle / Shrub jungle

200

3

760



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.