The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date15 Nov 2024
Closing Soon2 Dec 2024
Tender Amount₹ 2,88,54,692 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC/ SWR Pipe (as per ISI- standards) fittings like bends, tees, Ys, etc., For Single Tee (With Door) - 110mm dia

2

161

322.6

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Rate for conveyance of RCC socket and spigot pipes on all weather roading including loading Unloading and stacking (per metre of effective length) (for NP2 pipes). (Rate for every additional 1 Km. lead or part there of beyond 5KM initial lead is only payable) - For 150 mm Dia pipes

5000

-

1700

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying, laying, jointing RCC NP2 hume pipes (socket and spigot) confirming to IS 458/2003, with necessary rubber rings (as per IS 5382/1985) cost and conveyance of all materials to site, labour charges, all operational charges etc complete as directed for finished item of Work For 150mm dia Pipes. NOTE:- Transportation of pipes includes up to 5 KM from Factory. For any extra lead, necessary extra lead charges may be added.

200

454

90980

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing 150mm x100mm SWG gully traps Conforming to IS- 651 and 4127 with C.I Grating and Constg. Brick masonry in CM 1:6 prop. including plastering and fitted with 304.8mm x288.6mm(12 Inchesx9 Inches) C.I Frame and hinged cover including earth work excavation (excluding cost of Cement)

1

618

618.1

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Extra depth of Circular Man Hole of Size 900mm dia( Excluding Rock cutting) beyond 450mm depth (Excluding cost of cement) Extra for every 0.100m(100mm) depth

60

674

40446

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Construction of 900mm dia and 450mm depth circular manhole with CC 1:4:8 base of 150mm thick with 40 mm Crushed Granite metal, 225mm thick Brick masonry walls in C.M 1:6 with Flyash bricks of size 225X100x60mm and having compressive strength of 50 kg/sqcm, plastering with CM 1:4,12mm thick including rendering the surfaces smooth both inside and outside and benching with 100mm thick CC 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal and channelling to required slope including supply and fixing precast RCC 1:2:4 cover of 50mm thick and 600mm dia using 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal, including earth work excavation to the required depth etc. complete for finished item of work (but excluding cost of cement, steel and its fabrication charges.)

20

4355

87106.2

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Extra depth of 450mm x 450mm Inspection Chamber beyond 450mm depth (Excluding cost of cement) Extra for every 0.100m (100mm) depth

2

456

912.02

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Construction of 450mm x 450mm and 450mm depth Inspection Chamber with CC 1:4:8 base of 150mm thick 40 mm Crushed Granite metal and 225 mm thick Brick masonary walls in CM 1:6 with fly ash bricks of size 225 x 100 x 60mm with 50kg/Sq. Cm Compressive strength and plastering with CM 1:4; 12mm thick including rendering the surfaces smooth both inside and outside and channelling to required slope including supply and fixing precast RCC 1:2:4 cover of 50mm thick and 600 X 600mm size with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal, including earthwork excavation to the required depth etc; complete for finished item of work (but excluding cost of cement steel and its fabrication charges.)

1

2954

2954.95

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying, laying, fixing and commissioning the SWR pipes of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand SWR Pipe (as per ISI- standards) Type-A pipes (PVC / SWR pipe - 4Kg/sq.cm) for rain water and vent pipes of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings - For 110mm dia 3M Single socket pipe

2

958

1917.4

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing of CPVC unions - For 15 mm (1/2 inch) union

4

77

308.4

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing of CPVC unions - For 20mm (3/4 inch) union

5

96

482.5

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing of CPVC unions - For 25mm (1 inch) union

5

120

601.5

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 15.90mm OD Pipe - SDR 11

10

191

1916

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 22.20mm OD Pipe - SDR 11

20

230

4604

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 28.60mm OD Pipe - SDR 11

100

273

27340

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC / SWR Traps ( as per ISI- standards ) - For 4 Inches(101.6mm) Nahani Trap (With Jali with inlet)

2

170

340.8

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;S and F CP finish steel towel rod of 600 mm long and 20 mm dia with brackets

1

484

484.9

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing TV shape mirror with plastic frame size 609.6x457.2mm

1

610

610.9

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing of CP finish brass soap dish

1

681

681.5

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and Fixing 15mm PVC connection with brass union nut C.P coated

2

137

274.2

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply and Fixing 15 mm NP stop cock Indian make heavy duty Seiko/ Senior/ Nice or equivalent

2

648

1296.4

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply and Fixing 15mm N.P bib tap Indian make heavy duty

2

580

1161.2

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply and fixing of PVC low level Cistern with internal components and short bend, 10 Ltrs capacity Dual flush

1

2217

2217.6

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty

1

3736

3736.6

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS: 2556 - Part-4:1972 with waste fittings like 32mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400grams Seiko/Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550x400mm - Single C.P. Pillar Cock

1

2533

2533.8

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996

1

1369

1369.3

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing wash down European water closet of first quality conforming to IS 2556-Part-2-2004 of white glazed with S trap. Plastic seat and lid is to be paid extra.

1

2266

2266.6

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and Fixing white glazed flat back Bowl urinals of size 440x265x315mm with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995

1

1186

1186.8

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;White washing to New walls with Surya Cem / Equivalent Cem two coats complete for finished item of work.

1500

39

58950

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Whiting to New ceiling with Surya cem / Equivalent Cem, two coats complete for finished item of work.

2000

43

86600

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work -For External Walls

1200

167

200880

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Oil bound Distempering to New walls with 2 coats of Approved Make distemper over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work.

1600

130

208640

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.

150

170

25620

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)

125

796

99612.5

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply of Cast Iron pipes and fittings conforming to I.S. including transportation to site of work,

6700

97

655930

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Providing Dadooing to walls with ceramic wall tiles of size 200x300mm / 245mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

20

686

13727.8

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Providing skirting /risers of steps with ceramic wall tiles of size 200 x 300mm / 245mm x 325mm with 6 mm thick 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring tiles, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

6

517

3103.14

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Flooring with Non-skid Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement )

75.6

854

64607

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Flooring 50 mm thick with CC 1:2:4 using 20mm Down size (65% of 20-10mm and 35% of 10 - 4.75mm) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. (But Excluding Cost of Cement )

200

290

58020

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Flooring 100mm thick with CC 1:2:4 using 20mm Down size (65% of 20-10mm and 35% of 10 - 4.75mm) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth and including shuttering charges complete. ( But Excluding Cost of Cement )

570

558

318179.7

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete

2

9089

18178.4

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

2

14770

29540

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete

9.5

10225

97141.3

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

9.5

18178

172694.8

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.

1280

5

7296

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)

1280

34

43648

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply of Structural Steel plates for the month of October - 2024 (Inclusive of 13.615% CP and OH)

0.03

69305

2079.16

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply of Structural steel flats for the month of October - 2024 (Inclusive of 13.615% CP and OH)

0.15

68169

10225.35

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply of Structural Steel Angles/Channels/Beams/ Square Bars for the month of October - 2024(Inclusive of 13.615% CP and OH)

1.1

68169

74985.9

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter - (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 x 45mm)/(80x 52mm) x 2.20mm for outer frames, (58x 39mm)/(54x 38mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2mm prefabricated and welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42x 25mm)/(52x 21.5mm) x 2.0mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash and Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

80

8088

647064

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, and 15mm x 15mm for top and bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC 'C' channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail and bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail and bottom rail. Paneling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles and rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the 'C' Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer's specification and drawing for finished item of work including the Following Aluminium anodised fittings complete.: Single Shutter as per Approved Make a) 1no.of 200mm long aldrop with 16mm dia shoot. b) 2 nos. 200 to 250mm mm long tower bolt with 10mm dia shoot. c) 2 no. 100 mm to 150 mm long grip handle. d) 3 nos.150 mm long butt hinges.

1.5

3295

4942.65

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Providing and fixing PVC Door Frame of the size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined with 2Nos. of 150mm long brackets of 15x15mm M.S square tube. The two vertical door profiles are to be reinforced with 19x19mm MS Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long MS screws through the frame by using PVC fasteners. A minimum of 4Nos. of screws to be provided for Each vertical member and minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in-charge for finished item of work as per Approved Make

5

357

1789.5

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

1300

140

182442

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Plastering to brick masonry with cement mortar 1:4, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

370

140

51925.8

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Plastering to Ceiling with cement mortar 1:3, 12mm thick ( But Excluding Cost of Cement )

2000

154

308480

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Providing impervious coat 12 mm thick for Brick/CC/RCC walls etc., with CM1:3, mixed with Approved Make of water proofing compound at the rate of 1Kg per bag of cement and rendering smooth, rounding off junctions of walls as directed including cost and conveyance of all materials and water etc., and operational , incidental, Labour charges etc., ( But Excluding Cost of Cement ) complete for finished item of work.

610

143

87803.4

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Brushing of existing concrete surface with wire brush and providing cement concrete 1:2:4 screed of an average thickness of 20mm using 6mm size crushed granite metal of approved hard quality, and providing 2 layers of 24 guage rabbit wire mesh in the CC screed as nominal reinforcement and plastering with CM 1:4, 12mm thick including admixing of approved impervious water proofing compound as per manufacturers specification or @ 2% by weight of cement and finishing smooth and including providing slopes to drain off water etc., complete as directed (But Excluding Cost of Cement )

640

274

175987.2

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Supply and fixing minimum of 25mm to 30mm thick polished Black Kadapa single slab of required size as directed by the Engineer-in-charge with exposed faces square cut and well polished, on existing Walls, with grey Cement Slurry of honey like consistency spread at the rate of 3.30Kg./Sqm. including cost and conveyance all materials and water to work site and all operational, incidental, labour charges, dressing and fixing of stones in position rubbing curing etc., complete for Shelves as directed (But Excluding Cost of Cement)

10.8

370

4002.48

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.

160

6618

1059004.8

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls

603.64

393

237290.88

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)

150

3039

455860.5

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

235

13984

3286334

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Roof Slabs - In 2nd floor

80

808

64640

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Roof Slabs - In 1st floor

305

408

124623

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For roof Slab - up to 150mm thick.

305

7781

2373378.85

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Beams - In 2nd floor

60

951

57096

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Beams - In 1st floor

145

475

68991

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Reinforced Cement Concrete M-30 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 400Kg/Cum of concrete is to be used. - For roof Beams.

145

9117

1321975.15

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Sunshades.

8

14207

113662.16

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Lintels.

10

9822

98224.7

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Reinforced Cement Concrete M-30 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 400Kg/Cum of concrete is to be used. - For Side Walls above 200mm but upto 300mm thick

400

11125

4450148

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Reinforced Cement Concrete M-30 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 400Kg/Cum of concrete is to be used. - For Plinth Beams / Brace beams.

100

9239

923917

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Columns - In 2nd floor

10

1379

13798

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Columns - In 1st floor

45

689

31045.5

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Reinforced Cement Concrete M-30 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 400Kg/Cum of concrete is to be used. - For Column.

150

9844

1476670.5

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Reinforced Cement Concrete M-30 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 400Kg/Cum of concrete is to be used. - For Column Footings / Raft.

1000

6538

6538070

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer

320

2995

958710.4

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means

2200

34

75900

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Conveyance charges of Earth for 1 KM lead.

9550

40

385820

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Earthwork excavation by machinery where Mass excavation with large quantity is involved for buildings, major pipe line works, etc., in all soils up to SDR and stone matrix including cutting and loading in tippers with all lifts etc., complete

8152

68

555151.2

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

250

243

60800

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary rock (not requiring blasting)-Mechanical Means - up to 3 m Depth

500

151

75800

... More
Construction of clean water chambers of 3.0 Million Liters capacity including pump house and office;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth

440

119

52580



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.